ࡱ> q bjbjzLzL 2f&\&\pDD8HvX(qrlO8GGGGGGG$LNRHqqH(H*GG?kG`d߼ DLGRH<HOD O OkGkG& OGHHHH OD> :  TC"Annex 3 Evaluation Methodology and Criteria" \l1 Evaluation Methodology and Criteria 1. Introduction The Lead Authority will conduct a qualitative and financial evaluation of the Tenders received and the Contract / Framework Agreement will be awarded on the basis of the most economically advantageous tender and in accordance with the methodology. Evaluation team An evaluation team will undertake a comprehensive, systematic and consistent evaluation of each Tender. The evaluation team will be drawn from several fields of expertise from the Lead Authority end users and project team. General information on the evaluation process The evaluation process is summarised below. Contractors should note that whilst the Stage 1 qualitative evaluation submissions will be scored, the scores will not contribute towards the final qualitative marks that are available for the Tender and will be used only for the "Supplier Acceptability" assessment described below. TitlePass / fail or scoredOverall weighting or Score to PassStage 1 Pre-Qualification QuestionnairePass / fail ("Supplier Acceptability")N/ASection A Supplier Acceptability1010Section B Freedom of InformationNot ScoredNot ScoredSection C Economic and Financial Standing52Section D Insurance155Section E Equality3015Section F Health and Safety7053Section G Sustainability3015Section H Capacity and Capability3526Section I Management207Section J Modern Slavery Act & Fair Working Practice108Section K Blacklisting55Stage 2 Qualitative EvaluationScored30%Section L Qualitative QuestionsPricingScored70%Section M Priced Schedule of Works (Excel Document) Stage 1 Qualitative Assessment The basis upon which the "Supplier Acceptability" evaluation will be undertaken is set out below. Contractors should note that: they are required to pass all "pass / fail" questions; and achieve a percentage mark of 50% (unless otherwise indicated in the Section Header) out of the marks available (where appropriate) for each individual section of the Stage 1 questions as described above and summarised in Table 4 below, to pass the "Supplier Acceptability" section of the evaluation process. In the event that the above requirements are not achieved, the Authority may set the Tender aside and not consider it further. Table 1 Responses to all questions in relation to Stage 1 and Stage 2 Qualitative Assessment will be considered by reference to Table 1 below SCORESCORE STANDARDSINTERPRETATION OF RESPONSE5Excellent AnswerExemplar response, with a high level of substantiating information and detail provided4Good AnswerHigh quality response, with good level of substantiating information provided3Acceptable AnswerGood standard of response with majority of requirements met, but with some minor reservations2Poor AnswerAcceptable basic response with significant reservations but not sufficient to warrant rejection1Very Poor AnswerUnsatisfactory Response Does not meet minimum requirements or is inadequately substantiated0No Answer GivenAn unanswered response, or a response that does not fulfil the requirement in any way 5. Financial Evaluation. 5.1 The Authority will evaluate the financial stability of your organisation using the Dun and Bradstreet (D&B) Financial Supplier Portfolio Manager, and the following methodology. 5.2 It is the suppliers responsibility to ensure their most recent financial statements/accounts have been submitted to Companys House and that the financial information linked to their DUNS number is accurate prior to submitting a bid. Table 2 D&B RESULTTENDER SCORE95 100 percentile569 94 percentile434 68 percentile311 33 percentile 210 - 1 percentile 100 5.3 Any provider that falls below 11 percentile on the D&B Failure score at the time of assessment will be awarded a fail for the Economic / Financial Standing section of the stage 1 assessment and the Authority may set the tender aside and not consider it further. 5.4 Any suppliers not able to provide a DUNS number will be required to submit their last two years of audited accounts for assessment by the Authorities Financial Officers,however the score will take account of the fact that the checks are less detailed than available through D&B. Table 3 Finance Risk Assessment of Audited AccountsScoreVery Low Risk 5Low Risk 4Fairly Low Risk3Medium risk 2High Risk 1Very High Risk0 5.5 Any supplier assessed as Very High Risk will be awarded a zero fail score for the Economic / Financial Standing section of the stage 1 assessment and the Authority may set the tender aside and not consider it further. Stage 1 Qualitative Evaluation Table 4 Contact InformationGUIDANCE FOR SUPPLIERS: This section requests basic information about your organisation. This section is for INFORMATION PURPOSES ONLY, and will not be scored as part of the evaluation process. However, please note that Suppliers must complete ALL questions set out within this section. In the event of a consortium bid, the Authority reserves the right to raise further queries in relation to the responses provided under this section.1.01Company making applicationPlease provide the name of the organisation making the applicationFor Information Only 1.02Company Registration NumberPlease provide your company registration numberFor Information Only 1.03Correspondence addressPlease provide the address for your organisationFor Information Only 1.04 Registered address (if different)Please provide the registered address for your organisation if different to that in the previous questionFor Information Only 1.05Person applying on behalf of company (to whom all queries will be addressed)Please provide the name of the main contact person for your organisation to whom all queries will be addressed.For Information Only 1.06Position in company Please identify the position held in your organisation of the main contact personFor Information Only 1.07Please provide contact details for the main contact person: Telephone, Email, Web address (if available)For Information Only Section A - Supplier Acceptability and Minimum DeclarationsGUIDANCE FOR SUPPLIERS: Suppliers must meet the minimum requirements outlined in the Form of Tender and Anti-collusion Certificate in order to proceed to the next stage of the process. Failure to provide the required response to any question may result in you being eliminated from the process. Please note that this is a PASS/FAIL requirement of the evaluation.2.01Please read/complete, sign and upload the Form of Tender within the 'Request Documents' Section.Suppliers must upload a signed Form of Tender. PLEASE NOTE THIS IS A PASS/FAIL QUESTION.PASS/FAIL2.02Please read/complete, sign and upload the Anti-Collusion Certificate within the 'Request Documents' Section. Suppliers must upload a signed Anti Collusion Certificate. PLEASE NOTE THIS IS A PASS/FAIL QUESTIONPASS/FAILSection B Freedom of Information GUIDANCE FOR SUPPLIERS: The Authority is committed to open government and to meeting their legal responsibilities under the Freedom of Information Act 2000 (FoIA). Accordingly, all information submitted to a public authority may need to be disclosed by the public authority in response to a request made pursuant to the FoIA. The Authority is only committed to working with contractors who are prepared to give an undertaking to treat the information in this tender confidential.3.01Please specify the question number with reasons if anything contained in your submission is confidential. The Authority will use reasonable endeavours to keep such information confidential but does not guarantee to do so if it is obliged to disclose such information pursuant to its duties under the Freedom of Information Act 2000Suppliers are requested to confirm if anything in their bid is considered as confidential.For Information Only  Section C - Economic / Financial StandingGUIDANCE FOR SUPPLIERS: This section seeks to establish the economic and financial standing of your organisation. Suppliers should note that failure to satisfy all the requirements of this section will exclude you from further participation in the process. See Section 5 Financial Evaluation above for full details. Please note that this is a PASS/FAIL requirement of the evaluation.Marks Available - 5Pass Mark - 24.01 For Evaluation Purposes only, do not answer this questionThis question is for the scoring of the providers Dun & Bradstreet check and is not to be answered.Pass / Fail4.02Are you registered for VAT?This information is for verification only but the buyer may exclude you if you provide incorrect information.For Information Only 4.03If so, please provide registration number.This information is for verification only but the buyer may exclude you if you provide incorrect information. If you are bidding as, or on behalf of, a consortium, you should either provide the lead members details here, or state that, if selected, the body will register and comply with relevant VAT legislation.For Information Only 4.04Please state if your organisation is: i) a public limited company ii) a limited company iii) a partnership iv) a limited liability partnership (LLP) v) other (please specify).This information will be used for identification purposes only but the buyer may exclude you if you provide incorrect information. If you are bidding as, or on behalf of, a consortium, you should provide details for all relevant consortium membersFor Information Only 4.05 Do you have a Dun & Bradstreet Registration (DUNS) Number If you are not currently registered, you should obtain a free DUNS number for your business by visiting  HYPERLINK "https://www.dnb.co.uk/duns-number/lookup/request-a-duns-number.html" https://www.dnb.co.uk/duns-number/lookup/request-a-duns-number.html If you do not have a DUNS number please proceed to Q4.07.For Information Only4.06 Provide your Dun & Bradstreet (DUNS) registration numberFor Information Only 4.07 Please provide audited accounts for your organisation for the last two financial years. If you do not have a DUNS Number against which we can undertake a financial assessment, you must be able to provide audited accounts for the last 2 financial years. The buyer may not select you to tender if you are not able to provide the documents requested without a valid explanation.For Information Only 4.08 If you are not able to provide audited accounts for the last two financial years of trading for your organisation, please explain why. If you are unable to provide audited accounts for either of the two most recently completed financial years you must explain why they are not available. For Information Only 4.09  Provide the name and contact details of the person you would like the Buyer to liaise with regarding any queries about the financial position of the organisation.This is for information only, and will not be scored. If you are bidding as, or on behalf of, a consortium, you should provide all relevant contact details, or ensure that you know who to contact in the event of financial queries on other consortium membersFor Information Only Section D - Insurance RequirementsINSURANCES - It is expected that all providers shall have or be prepared to obtain relevant levels of insurance as deemed necessary to cover product liability and any liability of the contractor or any sub-contractor under any contract arising from this opportunity. Such insurances should have an indemnity level of: 10,000,000 (pounds) in respect of public liability. 10,000,000 (pounds) in respect of employers liability and between 1,000,000 (pounds) and 5,000,000 (pounds) in respect of professional indemnity (where applicable) Please note that this is a PASS/FAIL requirement of the evaluation.Marks Available - 15Pass Mark - 55.01It is a requirement that all providers will have Public Liability Insurance to a value of 10,000,000 for each and every claim. Please confirm that you have this in place and are able to provide a copy if requested.The buyer may only select you to tender if you have appropriate levels of insurance for public liability, professional indemnity and employers liability (as relevant to the required product or service). If you are selected as preferred bidder for this opportunity you will be expected to produce the relevant policy document. Failure to provide the document may mean that you will not be awarded any contract following this exercise.Pass / Fail 5.02It is a requirement that all providers will have Employers Liability Insurance to a value of 10,000,000 for each and every claim. Please confirm that you have this in place and are able to provide a copy if requested.The buyer may only select you to tender if you have appropriate levels of insurance for public liability, professional indemnity and employers liability (as relevant to the required product or service). If you are selected as preferred bidder for this opportunity you will be expected to produce the relevant policy document. Failure to provide the document may mean that you will not be awarded any contract following this exercise.Pass / Fail 5.03Does your organisation have Professional Indemnity Insurance?Should Professional Indemnity Insurance be required for the project we would expect bidders to have cover of between 1,000,000 and 5,000,000. For Information Only 5.04If you have Professional Indemnity insurance please explain whether the indemnity limit is in relation to one claim or is in aggregate.For Information Only 5.05If you do not currently have the necessary insurance indemnity levels required for any agreement that may arise from this opportunity, is your organisation prepared to give an undertaking that you will meet the required indemnity levels prior to the commencement of any contract / agreement that may arise from this opportunity In order to be considered for this opportunity all Suppliers must have the relevant insurances in place or agree to have them in place before any contract / framework will be awarded.Pass / FailSection E - EqualityGUIDANCE FOR SUPPLIERS: The Authority has a commitment to Equal Opportunities. All organisations that are awarded tenders are acting on behalf of the Council and will be expected to comply with all current equality legislation and practice equalities in employment and service delivery. In the event of a consortium bid, the Authority reserves the right to raise further queries in relation to the responses provided under this section. To ensure that you proceed to the next stage of the process providers must achieve a minimum of 50% of the marks available for this section.Marks Available 30Pass Mark - 156.01Have any of the following circumstances applied to your organisation in the last 3 years? a finding of unlawful discrimination by an Employment Tribunal, an Employment Appeal Tribunal or any other court or tribunal (or in comparable proceedings in jurisdiction other than the UK). following formal investigation by the Equality and Human Rights Commission or its predecessors (or a comparable body in a jurisdiction other than the UK), a complaint of unlawful discrimination has been upheld a finding of unlawful discrimination against anyone with protected characteristics has been made against your organisation by any civil or criminal court (or a comparable body in a jurisdiction other than the UK). This shall include the Equality Act 2010 (Statutory Duties) (Wales) Regulations 2011.The buyer will not select you to tender if you have been found to have unlawfully discriminated in the last three years, unless you have provided adequate evidence that you have taken appropriate action to stop it happening again.Scored Yes 0 Marks No 5 Marks (Subject To Question 6.02) 6.02If you answered yes to Q6.01 provide a summary of the finding or judgment and explain what action you have taken to prevent similar circumstances from recurring.The buyer will only select you to tender if you are able to demonstrate successful corrective action has been taken to resolve any judgement.For Information Only 6.03 If you use subcontractor(s) or are bidding on behalf of a consortium, what processes do you have in place to check whether any of the above circumstances apply to these other organisations?The buyer may not select you to tender if you do not have in place adequate vetting processes to check your subcontractors and consortium members record on compliance with equalities legislation. If you do not use subcontractors or consortium members please indicate a "Not Applicable" response to this question. Scored (Maximum Of Five Marks)6.04Do all employees (including those from your consortium members where relevant) that come into contact with the public, or with a clients staff members, receive equalities training? The buyer may only select you to tender if you train relevant staff appropriately.Scored Yes 5 Marks No 0 Marks 6.05If you have answered "Yes" to Q6.04 please provide a summary of the training programme in place for managers and relevant staffSuppliers who provide goods and services to or on behalf of Flintshire County Council are expected to provide training in Equal Opportunities for staff. The buyer may only select you to tender if you train relevant staff appropriately.Scored (Maximum Of Five Marks)6.06Describe your experience and / or general approach to delivering public services in Wales to ensure that the requirements of Welsh speakers are met, as provided for by Welsh language legislation.The buyer may only select you to tender if you can demonstrate your ability to deliver services in the Welsh language. Where particular experience is required, the buyer will specify this. This should include the provision of bilingual signage (both for publicity purposes and on construction sites), publicity material and in dealings with the general public. Scored (Maximum Of Five Marks)6.07Does your organisation have an Equal Opportunities Policy and are able to provide a copy if requested?If you are selected as preferred bidder for this opportunity you will be expected to produce the relevant policy document. Failure to provide the document may mean that you will not be awarded any contract following this exercise Scored Yes 5 Marks No 0 Marks Section F - Health and SafetyMarks Available 70Pass Mark - 53GUIDANCE FOR SUPPLIERS: This section seeks to gather information on the Health & Safety provision of your organisation. Any business employing five or more people has, by law to prepare and bring to the attention of employees a written "Health & Safety Policy Statement." Failure to provide a response which demonstrates that your organisation meets the required standard of professional expertise required by the Authority in connection with health and safety may result in a "fail" mark being awarded for the relevant question/s (at the sole discretion of the Authority). In the event of a consortium bid, the Authority reserves the right to raise further queries in relation to the responses provided under this section. To ensure that you proceed to the next stage of the process providers must achieve 75% of the marks available for this section. This section is a Pass/Fail requirement.7.01Has your organisation or any of its Directors or Executive Officers been in receipt of enforcement/remedial orders in relation to the Health and Safety Executive (or equivalent body) in the last 3 years?The buyer will not select you to tender if your company has been prosecuted or served notice under health and safety legislation unless there is clear evidence that decisive and comprehensive action has been taken to remedy the situation. The buyer may check the HSE database to confirm the accuracy of the information provided. Failure to provide accurate information may result in you not being selected to tender. Yes 0 (Fail) No 5 (Pass) (Subject To Preceding Question)  7.02 If your answer to the previous question provide details of the convictions or notice(s) served and give details of any remedial action or changes to procedures you have made as a result of the prosecution or notice(s) servedThe buyer will not select you to tender if your company has been prosecuted or served notice under health and safety legislation unless there is clear evidence that decisive and comprehensive action has been taken to remedy the situation. The buyer may check the HSE database to confirm the accuracy of the information provided. Failure to provide accurate information may result in you not being selected to tender. For Information Only 7.03If you use subcontractor(s), or are bidding on behalf of a consortium, do you have processes in place to check whether any of the above circumstances apply to these other organisations? If you are successful you must be in a position to provide evidence if required, prior to contract award, and without delayThe buyer may not select you to tender if you do not have in place adequate vetting processes to check your subcontractors record and compliance with Health and Safety legislation. If you do not use sub-contractors please answer "Not Applicable" Yes 5 (Pass) No 0 (Fail) N/A 5 (Pass) Pass / Fail 7.04Do you have a company Health and Safety Policy and able to provide a copy if requested?If you are selected as preferred bidder for this opportunity you will be expected to produce the relevant policy document. Failure to provide the document may mean that you will not be awarded any contract following this exercise. Failure to provide the adequate information may result in you not being selected to tender.Scored Yes 5 Marks No 0 Marks N/A (less than five employees) 5 Marks7.05If you answered yes to previous question please confirm that your Health and Safety Policy includes the following: a Policy Statement - signed and dated. The Organisation and Responsibilities - how Health and Safety requirements are implemented. The Arrangements standards and procedures adopted in practice. Scored Yes 5 Marks No 0 Marks 7.06If you use subcontractor(s), or are bidding on behalf of a consortium, do you have processes in place to check that the subcontractors have Health & Safety systems in place and the competence and capabilities to carry out the work, as well as systems for monitoring the subcontractors performance in relation to Health & Safety? The buyer may not select you to tender if you do not have in place adequate vetting processes to check your subcontractors record and compliance with Health and Safety legislation. If you are successful you must be in a position to provide evidence if required, prior to contract award, and without delay. If you will not be using sub-contractors, please answer N/A.  Scored Yes 5 Marks No 0 Marks N/A 5 Marks 7.07Do you, your staff/workforce have Health & Safety or other relevant qualifications and experience sufficient to implement your Health & Safety Policy to a standard appropriate to the activity that your organization is likely to undertake.You will be expected to demonstrate and provide evidence on request, that your staff/workforce possesses suitable qualifications and experience for the tasks assigned to them, unless there are specific situations where they need to work under controlled and competent supervision e.g. trainees.Scored Yes 5 Marks No 0 Marks7.08Please provide evidence that you review and where necessary improve your H&S performance, and involve your staff/ workforce in the planning and implementation of H&S measures.Please provide evidence that your organization has in place and implements, an on-going system for monitoring H&S procedures on an on-going basis and for periodically reviewing and updating that system as necessary. This should also evidence that your organization has in place and implements a means of consulting with its staff/ workforce on H&S matters and show how staff/workforce comments, including complaints are taken into account. Scored (Maximum Of Five Marks)7.09Do you have access to competent H&S advice/assistance both general and construction/sector related? Please provide evidence of how your organization obtains access to competent H&S advice.Please provide evidence of how your organization obtains access to competent H&S advice. NOTE Access to competent in-house advice, in whole or part, is preferred. It is essential that H&S advisor(s) are able to provide general H&S advice and that (from the same source or elsewhere) advice relating to construction H&S issues is accessible as required. Scored (Maximum Of Five Marks)7.10Please provide evidence that you routinely record and review all accidents/incidents and undertake follow-up action?Please provide access to records of accident rates and frequency for all RIDDOR reportable events for at least the last three years. Demonstrate that your organization has in place a system for reviewing significant incidents, and recording action taken as a result including action taken in response to any enforcement. Scored (Maximum Of Five Marks) 7.11Do you have arrangements for ensuring that your suppliers apply H&S measures to a standard appropriate to the activity for which they are being engaged?You will be expected to demonstrate and provide evidence on request, that your organization has and implements, arrangements for ensuring that H&S performance throughout the whole of your organizations supply chain is appropriate to the work likely to be undertaken. Scored Yes 5 Marks No 0 Marks7.12Do you have arrangements for ensuring that on-site welfare provision meets legal requirements and the needs/expectations of your employees?You will be expected to demonstrate and provide evidence on request about how you ensure suitable welfare facilities will be in place before starting work on site, whether provided by a site-specific arrangement or your own organizational measures.Scored Yes 5 Marks No 0 Marks7.13Do you have arrangements for co-operating and co-ordinating your work with others (including other suppliers, notably contractors)? Please provide explanation of how co-operation and co-ordination of the work is achieved in practice.Please provide explanation of how co-operation and co-ordination of the work is achieved in practice, and how other organizations are involved in drawing up method statements/safe systems of work etc. including arrangements for response to emergency situations. This should include details of how comments and input from your suppliers will be taken into account and how external comments including any complaints, will be responded to. Scored (Maximum Of Five Marks)7.14Are you aware of your duties as required under the Construction (Design and Management) Regulations 2015.The Construction (Design and Management) Regulations 2015 apply to all construction related activities. As such all contractors must be aware of their obligations under these regulations. Please answer N/A is not construction related works.Scored Yes 5 Marks No 0 Marks N/A 5 Marks7.15Are you, or is your company, registered with an industrial or occupational safety group, for example with a member of the Safety Schemes in Procurement (www.SSIP.org.uk) or equivalent scheme including independent audits?If relevant to the procurement, the buyer may require you (and possibly also your sub-contractors and/or consortium members as relevant) to be certified by a member of the SSIP group or equivalent. If you do not provide appropriate details you may not be selected to tender.  Scored Yes 5 Marks No 0 Marks 7.16If your answer to the previous question was yes please state the organisation concerned, provide your membership number, your membership level, other details of what your registration covers or other independent audit details. For Information Only7.17 Please provide evidence of non-licensed asbestos removal training via organisations such as UKATA, BOHS, ACAD and ARCA?  The buyer requests that you upload training certification evidence or further information on the sub-contractor carrying out this item of work Yes 5 (Pass) No 0 (Fail) Section G - SustainabilityGUIDANCE FOR SUPPLIERS: The Authority must remain compliant with all current EU/UK environmental legislation and as such sustainability and environmental requirements will form part of the evaluation of this process. Failure to provide a response which demonstrates to the satisfaction of the Authority that your organisation meets the required standard of professional expertise required in relation to such sustainability and environmental requirements may result in a "fail" mark being awarded for the relevant question/s (at the sole discretion of the Authority). In the event of a consortium bid, the Authority reserves the right to raise further queries in relation to the responses provided under this section. To ensure that you proceed to the next stage of the process providers must achieve a minimum of 50% of the marks available for this section.Marks Available 30Pass Mark - 158.01Has your organisation been convicted of breaching environmental legislation, or had any notice served upon it, in the last three years by any environmental regulator or authority (including local authority)?The buyer may not select you to tender if you have been convicted or served notice under environmental legislation in the last three years unless you provide adequate evidence of action taken to stop similar incidences from happening again.Pass / Fail (Subject To Question 8.02) 8.02If your answer to the previous question is yes please provide details of any of the conviction or notice and details of any remedial action or changes you have made as a result of conviction or notices servedThe buyer may not select you to tender if you have been convicted or served notice under environmental legislation in the last three years unless you provide adequate evidence of action taken to stop similar incidences from happening again (If A Response To This Question Is Required Pursuant To Question 8.01, The Response Will Be Used To Assess The Score To Be Awarded For Question 8.01)8.03If you use subcontractor(s), or are bidding on behalf of a consortium, do you have processes in place to check whether any of these organisations have been convicted or had a notice served upon them for infringement of environmental legislation?The buyer may not select you to tender if you do not have in place adequate vetting processes to check your subcontractors and/or consortium members record on compliance with environmental legislation. Scored Yes 5 Marks No 0 Marks 8.04Do you operate in accordance with an Environmental Management System that is certified by a UKAS-accredited (or national equivalent) organisation? If you are successful you must be in a position to provide evidence if required, prior to contract award, and without delay. If you are bidding as a consortium, you will be required to explain which of the members has the certification in place, and how this covers the work of the consortiumFor Information Only 8.05Do you have an environmental policy statement committing your organisation to a programme of improvement and are able to provide a copy if requested?If you are selected as preferred bidder for this opportunity you will be expected to produce the relevant policy document. Failure to provide the document may mean that you will not be awarded any contract following this exercise. Yes 5 Marks No 0 Marks 8.06Do you identify and review your organisations environmental impacts?The buyer may only select you to tender if you can demonstrate your commitment to managing your environmental impact by identifying, reviewing and improving your performanceYes 5 Marks No 0 Marks 8.07Do you set environmental objectives and targets against which your performance is measured or audited?The buyer may only select you to tender if you can demonstrate your commitment to managing your environmental impact by identifying, reviewing and improving your performanceYes 5 Marks No 0 Marks 8.08 Please confirm that you will pay all suppliers and sub-contractors within agreed timescales, which will not exceed 30 days The buyer may only select you to tender if you agree to pay your subcontractors on time. This is in line with legislation on late commercial payments. Comply with requirement 5 Marks Not comply with requirement 0 MarksSection H - Capacity and CapabilityGUIDANCE FOR SUPPLIERS: This section examines the capacity and capability to provide the works required to satisfy this opportunity. In the event of a consortium bid, the Authority reserves the right to raise further queries in relation to the responses provided under this section. To ensure that you proceed to the next stage of the process providers must achieve a minimum of 75% of the marks for this section Marks Available 35Pass Mark - 269.01What are the main business activities of your organisation or consortium? Please limit your answer to a brief summary.This answer will not be evaluated, but will be used by the buyer to understand what goods and services your organisation provides. The answer to this question will not be used by buyers as part of a procurement exercise. Any evidence demonstrating your suitability to tender should be covered in your answers to other questions.For Information Only 9.02Please indicate the length of time your organisation has carried out the main business activities in years, or months if you are a new organisationFor Information Only  9.03State the relevant qualifications, expertise and experience of the key staff who might be available to service this requirement.The buyer may only select you to tender if you have appropriately qualified and experienced personnel.Scored (Maximum Of Five Marks)9.04State what key machinery, plant, processes, IT and other non-staff resources you have (or are able to lease) to service this requirementThe buyer may only select you to tender if you have adequate resources to service the requirement.Scored (Maximum Of Five Marks)9.05Explain what experience you have of working on schemes with a value between those specified by the buyer in the guidance.The buyer may only select a bidder to tender if can demonstrate relevant experience on schemes with a similar value to the one proposed.Scored (Maximum Of Five Marks)9.06The Authority supports the adoption and principals of the Considerate Contractors Scheme and requires all tendering contractors to subscribe to the scheme. From the drop down list please confirm if you already subscribe to this scheme (or an equivalent), or are prepared to subscribe if you do not already do so. The buyer may only select a bidder to tender if they are registered with a suitable scheme and comply with its codes of practice.Already Subscribe 5 Marks Not Subscribe but Prepared to 5 Marks Not Prepared to Subscribe 0 Marks9.07Are all relevant personnel (e.g. excluding trainees and apprentices) of your organisation and any of your subcontractors/consortium members/supply chain who will be workers on or regular visitors to a construction site registered on the Construction Skills Certification Scheme (CSCS) or are able to prove competence in some other appropriate way?The buyer may only select a bidder to tender if all relevant personnel are registered or able to prove their competence in some other appropriate wayYes 5 Marks No 0 Marks 9.08Have you had to pay any damages (whether liquidated (LADs) or unliquidated) for a failure to complete a contract on time or to requirements in the last three years?The buyer may use this information to determine whether you have a record of successful delivery of contracts. If you answer yes to this question and fail to provide convincing evidence that you have taken appropriate action to ensure the problems will not be repeated you may not be selected to tender. Yes 0 Marks No 5 Marks 9.09Has your organisation had a contract cancelled, or not renewed, for breach of contract or failure to meet requirements within the last three years?The buyer may use this information to determine whether you have a record of successful delivery of contracts. If you answer yes to this question and fail to provide convincing evidence that you have taken appropriate action to ensure the problems will not be repeated you may not be selected to tender.Yes 0 Marks No 5 Marks 9.10If you have answered yes to any of the previous 2 questions please give details below (Max 150 words)The buyer may use this information to determine whether you have a record of successful delivery of contracts. If A Response To This Question Is Required Pursuant To previous 2 questions your Response Will Be Used To Assess The Scores To Be Awarded For those questions Section I - ManagementGUIDANCE FOR SUPPLIERS: This section seeks information relating to the management and quality control systems within your organisation. Failure to provide a response which demonstrates to the satisfaction of the Authority that your organisation meets the required standard of professional and technical expertise required by the Authority in connection with the Programme may result in a "fail" mark being awarded for the relevant question/s (at the sole discretion of the Authority). In the event of a consortium bid, the Authority reserves the right to raise further queries in relation to the response provided under this section. To ensure that you proceed to the next stage of the process providers must achieve a minimum of 50% of the marks available for this section. Marks Available 20Pass Mark - 1010.01Do you operate in accordance with a Quality Management System that is certified by a UKAS-accredited (or national equivalent) third party against ISO 9001 or an equivalent standard? If you are successful you must be in a position to provide evidence if required, prior to contract award, and without delayIf you are successful you must be in a position to provide evidence if required, prior to contract award, and without delay. The buyer will use your answer to determine if you have an appropriate system for making sure that the quality of the product or service you deliver is consistent.  For Information Only 10.02 If you answered yes to previous question please provide the following details: Standard certified against Certification body, date and validity of certificate Scope of certification If you are bidding as a consortium, please explain which of the members has the certification in place, and how this covers the work of the consortiumThe buyer will use your answer to determine if you have an appropriate system for making sure that the quality of the product or service you deliver is consistent. If you answer no you may not qualify to tender for some requirements. If you are bidding as a consortium it may be adequate for one consortium member to hold certification on behalf of the consortium. For Information Only 10.03Do you have a formal quality policy, linked to your business plan and customer needs, that is understood and followed by all employees and are able to provide a copy if requested? If you are selected as preferred bidder for this opportunity you will be expected to produce the relevant policy document. Failure to provide the document may mean that you will not be awarded any contract following this exercise. Yes 5 Marks No 0 Marks 10.04Do you regularly review performance through internal audits and meetings, and keep a record of the results?Upon request you should be able to provide evidence to support your answer to this question in order to satisfy the buyer that you have appropriate system for regular performance reviewYes 5 Marks No 0 Marks10.05Do you have a documented process designed to ensure that the quality of your products or services is consistent?Upon request you should be able to provide evidence to support your answer to this question in order to satisfy the buyer that you have appropriate systems for making sure that the quality of the product or service you deliver is consistent.Yes 5 Marks No 0 Marks 10.06If you are bidding on behalf of a consortium please confirm that you have documented processes in place to adequately manage relationships with your members (e.g. any systems used to ensure prompt communication, accountability and swift resolution of disputes). If you are successful you must be in a position to provide evidence if required, prior to contract award, and without delay.The buyer may not select you to tender unless you can confirm that (if relevant) you have consortium management arrangements in place to ensure that your products or services continue to meet the buyers needs. If you are not part of a consortium please indicate Not Applicable as your answer. Please see www.wales.gov.uk/jointbidding for more detailsYes 5 Marks N/A 5 Marks No 0 Marks Section J Modern Slavery Act & Fair Working Practice GUIDANCE FOR SUPPLIERS: It is expected that all providers meet the requirements under Modern Slavery Act 2015 and those of the Welsh Governments Code of Practice on Ethical Procurement in Supply Chains. This is a PASS/FAIL SectionMarks Available 10Pass Mark - 711.01 Please refer to this link in order to answer this question section.  HYPERLINK "https://www.gov.uk/government/publications/transparency-in-supply-chains-a-practical-guide" https://www.gov.uk/government/publications/transparency-in-supply-chains-a-practical-guide 11.02Are you a relevant commercial organisation as defined by section 54 ("Transparency in supply chains etc.") of the Modern Slavery Act 2015 ("the Act")?If you answer 'Yes' please answer the proceeding questionFor Information Only 11.03 Have you or your organisation been convicted of a criminal offence under the Modern Slavery Act 2015?The buyer will not select you to tender if you have been convicted of any criminal offences under the Modern Slavery Act 2015, unless you have provided adequate evidence that you have taken appropriate action to stop it happening again. If you answer Yes please provide details in proceeding question. Please note that this is a pass / fail question. Yes 0 (Fail) No 5 (Pass) 11.04Please provide a summary of the finding or judgment and explain what action you or your organisation have taken to prevent similar circumstances from recurring. The buyer will only select you to tender if you are able to demonstrate successful corrective action has been taken to prevent similar circumstances from recurringFor Information Only (If a response to this Question Is required pursuant to previous question, the response will be used to assess the Score to be awarded for previous question) 11.05Please describe how you will commit to fair practices for workers engaged in the delivery of this contract (including any agency or sub-contracted workers).Answers will reassure evaluators that Suppliers take a positive approach to ensuring that their workers are subject to fair work practices, receive fair pay and have opportunities to develop skills. Fair working practices may include: Employee access to training and development opportunities; or Promoting equal opportunities for all staff regardless of age, gender, disability, religion, race and sexual orientation; or Stable employment, avoiding inappropriate use of zero-hours contracts, and umbrella employment firms;or Flexible working arrangements to allow support for carers, and for family-friendly working; or Supporting workforce engagement, for example Trade Union recognition and representation, or other arrangements for empowering staff. Answers need not be constrained to the examples given in the guidance above. Suppliers must score at least 2 to pass this question.  Scored (Maximum Of Five Marks) Section K - BlacklistingGUIDANCE FOR SUPPLIERS: This is a PASS/FAIL SectionMarks Available 5Pass Mark - 512.01Have you, or has your organisation, been found by a judicial body or judicial decision to have used the practice of 'blacklisting' in the last three years?The buyer will not select you to tender if you have been found to have used the practice of black listing in the last 3 years, unless you have provided adequate evidence that you have taken appropriate action to stop it happening again. If you answer Yes please provide details in proceeding question. Please note this is a pass / fail question. Yes 0 (Fail) No 5 (Pass)12.02Please provide a summary of the finding or judgment and explain what action you or your organisation have taken to prevent similar circumstances from recurring.The buyer will only select you to tender if you are able to demonstrate successful corrective action has been taken to prevent similar circumstances from recurring.For Information Only (If a response to this Question Is required pursuant to previous question, the response will be used to assess the Score to be awarded for previous question).If you are unable to demonstrate that you have taken appropriate action to prevent similar circumstances from recurring you will be awarded a fail for previous question  Stage 2 Qualitative Assessment Responses will be considered by reference to Table 1 above to provide a mark out of five for each question. The marks available for each section of the Stage 2 qualitative questions are as set out in Table 5 below. Contractors should note that where a section contains a number of sub-questions, for evaluation purposes the overall mark attributed to the entirety of that section will be apportioned equally across each of the sub-questions. Table 6 Section L Qualitative Questions This section carries a weighting of 30% of the total quality weighting for the project. Item no. Question  Guidance Answer 13.01 What do you consider to be the main risks and challenges in this project, and how you would manage them, and minimise any potential negative outcomes? Use evidence to support your answer where appropriate from previous project experience / successes. (Maximum 2 sides.)  The buyer requests that a maximum of 2 side of A4 is submitted  Scored (Maximum Of Five Marks) 13.02 Provide detail on your approach to the delivery of this project and how the various aspects of this would be managed, in particular sub-contractor co-ordination. Demonstrate your management approach in ensuring that all functionality, design and specification issues, and budget constraints are developed collaboratively, and within the clients requirements and aspirations. Use evidence to support your answer where appropriate from previous project experience / successes. (Maximum 2 sides) The buyer requests that a maximum of 2 side of A4 is submitted  Scored (Maximum Of Five Marks) 13.03 Please provide your timescales for carrying out the programme of works? The buyer has estimated that the construction programme will be 20 weeks Scored (Maximum Of Five Marks) 13.04 Please provide a construction programme in a Gantt or bar chart? The buyer requests that you upload this as an Excel or document  Scored (Maximum Of Five Marks) 13.05 Please provide documentation showing you have operatives / sub-contractors who are Gas Safe Registered? The buyer requests that you upload training certification evidence or further information on the sub-contractor carrying out this item of work  Yes 5 Marks No 0 Marks  13.06 Please provide documentation showing you have operatives / sub-contractors who are NICEIC accredited? The buyer requests that you upload training certification evidence or further information on the sub-contractor carrying out this item of work Yes 5 Marks No 0 Marks  13.07 Please provide any ISO certification you may have, for example ISO 9001, ISO 14001 or ISO 45001  The buyer requests that you upload all certification. Scored (Maximum Of Five Marks)Section M - Pricing The Pricing section carries a weighting of 70% of the total weighting for the project. 14.01 Please complete and upload the fully costed Pricing Schedule in Excel format. . The buyer requests that you upload this to Sell2Wales Scored (Maximum Of Five Marks) 14.02 Please complete and upload the signed Form of Tender The buyer requests that you upload this to Sell2Wales Scored (Maximum Of Five Marks) 7. Scoring Methodologies and Calculations 7.1 Stage 2 Qualitative Assessment 7.1.1 The Stage 2 qualitative response is worth 30% of the total marks for the Tender submission. In addition to the guidance set out here, the qualitative submissions will also be considered by reference to Table 1 above to provide a mark out of five for each question. 7.1.2 The Qualitative assessment for the Stage 2 Evaluation is undertaken by a calculation of the weighted scores for each section following the submission of bids. Each section carries the weighting as identified in Table 5. The score given for each section is then subjected to the weighting identified. The weighted score for each section is then calculated as follows: (Weighting / 100) x Actual Score 7.1.3 The bidder with the highest total weighted score for all sections will receive 100% whist the remaining Suppliers scores will be pro-rated from this using the following calculation (Company / Winner) * 100 7.1.4 The highest scoring qualitative submission identified in the assessment criteria will achieve the full marks available. Pro-rated scores will then be applied to other Tenders using the following formula (Actual Score/Highest score) x 0.3 7.1.5 Please note that scores will be calculated to 2 decimal places. 7.2 Pricing 7.2.1 Following completion of the Stage 2 qualitative evaluation, Tenders will be evaluated for the remaining 70% of the marks available for the Tender on the prices submitted in the Pricing Schedule & Document. 7.2.2 The most competitive total price will achieve the full marks available. Pro-rated scores will then be applied to other Tenders. 7.2.3 Each Contractor's completed Pricing Document will be scored according to the following analysis: (Lowest Price/Actual Price) x 0.7 8. Consensus 8.1 Following completion of the abovementioned evaluation process, consensus, checking and moderation of the scores will be carried out to ensure consistency of evaluation. To achieve this, the evaluators will meet, scores will be compared and a consensus view taken and recorded. 8.2 Once the meeting has reached consensus, the final scores will be agreed. 9. Standstill period 9.1 All Contractors shall be notified in writing whether their Tender submission has been successful or unsuccessful. The Lead Authority may allow a voluntary standstill period of at least ten calendar days between notifying Contractors of the same and entering into the Contract/Framework Agreements with the successful Contractors. 9.2 Further details on the standstill period will be set out in the decision letters issued by the Lead Authority following the conclusion of the Tender evaluation process.      PAGE 12 :;^bnZ g v Z ( + ஗lllUQJQJ@J@JhOh[x5\ hOh[xh[x,h:h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,hOh[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2hOh[x5CJOJPJQJ\^JaJnH tH /hOh[xCJOJPJQJ^JaJnH tH >jhOh[x5CJOJPJQJU\^JaJnH tH _og w Z  $ $H$Ifa$gd H & F$gd[x$ & F%@&H$a$gd[x$ & F$@&H$a$gd[x$$ & F$@&H$a$gd[x$$ & F#@&H$a$gd[x$$@&H$a$gd[x$ H$a$gd[x     7 F \ c d l ۽{dPdP9P99P,h*CJOJQJ^JaJ h?h[xCJOJQJ^JaJ#h?h[x5CJOJQJ^JaJ/h?h[x5CJOJPJQJ^JaJnH tH h?h[xnH tH h[xOJQJ/hOh[xCJOJPJQJ\^JaJnH tH hrfh[xOJQJ2hOh[x5CJOJPJQJ\^JaJnH tH hzrGh[x5OJQJ[I::. $$$Ifgd H$$$$Ifa$gd Hkd $$IflFr' ]  t&&&0l(6    44 lap&&&yt H[\^j^OOC $$$Ifgd H$$$$Ifa$gd Hkd $$IflFr' ] t0l(6    44 lapyt H+^OOC $$$Ifgd H$$$$Ifa$gd Hkd$$IflFr' ] t0l(6    44 lapyt H+,.:^N:)$If]^gd H$n$If]^na$gd H$$If]a$gd HkdH$$IflFr' ] t0l(6    44 lapyt H \L8'$If]^gd H$n$If]^na$gd H$$If]a$gd Hkd$$IflFr' ] t0l(6    44 lapyt H  u\L8'$If]^gd H$n$If]^na$gd H$$If]a$gd Hkd$$Ifl4Fr' ] t0l(6    44 lapyt HuvwQRC\WH:::0^`0gd[xm$$ H$a$gd[xgd[xkd$$IflxFr' ] t0l(6    44 lapyt HCDEMNYfg{}ncZ $Ifgd H $Ifgd Hm$xkdD$$If0DBFD F  t622 l4Bapyt H $$Ifa$gd Hm$ ^gd[xm$ {}P޾ުޒxaxaxG2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2hOh[x5CJOJPJQJ\^JaJnH tH /h?h[x5CJOJPJQJ^JaJnH tH &h?h[x5CJOJQJ\^JaJ#h?h[x5CJOJQJ^JaJh[xCJOJQJ^JaJ h?h[xCJOJQJ^JaJ h?h[xCJOJQJ^JaJ}~5[kd$$If0DBD  t622 l4ayt H $Ifgd H $Ifgd Hm$[kd$$$If0DBD  t622 l4ayt H5[kd=$$If0DBD  t622 l4ayt H $Ifgd H $Ifgd Hm$[kd$$If0DBD  t622 l4ayt H5/gd[xm$[kd$$If0DBD  t622 l4ayt H $Ifgd H $Ifgd Hm$[kd$$If0DBD  t622 l4ayt HJP $$Ifa$gd Hm$ ^gd[xm$0^`0gd[xm$ PQ`ac_TEE$If^gd Hm$ $Ifgd Hm$kdV$$If0F9 F  t0K622 l4Ba pyt Hcdo|~zo``$If^gd Hm$ $Ifgd Hm$kd9$$If09 F t0K622 l4Ba yt H~zo`$If^gd Hm$ $Ifgd Hm$kd$$If0F9 F t0K622 l4Ba yt Hzo`$If^gd Hm$ $Ifgd Hm$kd$$If0F9 F t0K622 l4Ba yt Hzo``$If^gd Hm$ $Ifgd Hm$kdC$$If0F9 F t0K622 l4Ba yt Hzo`$If^gd Hm$ $Ifgd Hm$kd$$If09 F t0K622 l4Ba yt HzppbVDD$ H$^gd[x H$^gd[x0^`0gd[xm$ ^gd[xm$kd$$If0F9 F t0K622 l4Ba yt Ho}kdM$$IfK(D  t 04KB` a/p yt HdK$H$Ifgd HRkζΞoXDX-X,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH )h[xCJOJPJQJ\^JaJnH tH 2h|Ah[x5CJOJPJQJ\^JaJnH tH /h|Ah[xCJOJPJQJ\^JaJnH tH /h[x5>*CJOJPJQJ\^JaJnH tH 5h|Ah[x5>*CJOJPJQJ\^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH xfQQ<$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd Hkd $$IfK(D  t 022 -4KB` a/p yt H8i~ vOdefgkG ϸvϸvϸvϸvϸvϸv,h.h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH *0dK$H$Ifgd Hkd$$IfK\S!(DDDn,  t04KB` a/pyt H9i$dK$H$Ifa$gd H$dK$H$Ifa$gd H0dK$H$Ifgd Hkd$$IfK\S!(DDDn,  t04KB` a/pyt H$dK$H$Ifa$gd H$dK$H$Ifa$gd H0dK$H$Ifgd Hkd $$IfK\S!(DDDn,  t04KB` a/pyt H v$dK$H$Ifa$gd H$dK$H$Ifa$gd H0dK$H$Ifgd Hkd$!$$IfK\S!(DDDn,  t04KB` a/pyt HOe$dK$H$Ifa$gd H$dK$H$Ifa$gd Hefk0dK$H$Ifgd HkdA"$$IfK\S!(DDDn,  t04KB` a/pyt Hk$dK$H$Ifa$gd H$dK$H$Ifa$gd H-dK$H$Ifgd HkdX#$$IfK\S!(DDn,  t04KBB` a/pyt HG H V X m n o վvv[C/&h[xCJOJPJQJ^JaJnH tH /h[x5>*CJOJPJQJ\^JaJnH tH 5h.h[x5>*CJOJPJQJ\^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH W X n $dK$H$Ifa$gd H$dK$H$Ifa$gd Hn o 0dK$H$Ifgd Hkdu$$$IfK\S!(DDDn,  t04KB` a/pyt H "xcc$dK$H$Ifa$gd Hkd%$$IfK(D  t 022K4KB` a/p yt H /!""""}"~""""""""龧ՌqZC)2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,hFo0h[xCJOJPJQJ^JaJnH tH 5hh[xB*CJOJPJQJ^JaJnH phtH 5hFo0h[xB*CJOJPJQJ^JaJnH phtH ,h5h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,hn`h[xCJOJPJQJ^JaJnH tH """~""""xfQQQ<$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd Hkda&$$IfK(D  t 022 -4KB` a/p yt H"""3!dK$H$Ifgd Hkd0'$$IfK\(VD  t04K` a/pyt H""""S#T##############龧վv_vvv_D5h`AUh[x5>*CJOJPJQJ\^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,hcDh[xCJOJPJQJ^JaJnH tH ,hFo0h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH "T####$dK$H$Ifa$gd H$dK$H$Ifa$gd H###0dK$H$Ifgd HkdA($$IfKN\(DVD  t04KB` a/pyt H##$$3%4%%mmmmm$dK$H$Ifa$gd H|kdX)$$IfK(  t 04K` a/p yt H#$$2%3%4%%%%%%̴pYE.,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH ,h`AUh[xCJOJPJQJ^JaJnH tH /h`AUh[xCJOJPJQJ\^JaJnH tH )h[xCJOJPJQJ\^JaJnH tH /hh[xCJOJPJQJ\^JaJnH tH 5h`AUh[x5>*CJOJPJQJ\^JaJnH tH /h[x5>*CJOJPJQJ\^JaJnH tH  %%% '{''p[[F$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd H|kd*$$IfK(  t 04K` a/p yt H%' 'z'{''''''''''4(ҾҧvrvW?W'/h\qlh[xCJOJPJQJ\^JaJnH tH /h[x5>*CJOJPJQJ\^JaJnH tH 5h\qlh[x5>*CJOJPJQJ\^JaJnH tH h[x,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH ,hh[xCJOJPJQJ^JaJnH tH ''''''3....gd[xkd*$$IfK\(VD  t04K` a/pyt H'''''))G)fQQQQQ$dK$H$Ifa$gd Hkd+$$IfK(D  t 022K4KB` a/p yt HdK$H$Ifgd H4(=(()F)G)H)[)\)i)j)k)l)p)һmV<(&h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 8hg=h[x5B*CJOJPJQJ^JaJnH phtH 2h[x5B*CJOJPJQJ^JaJnH phtH ,h5h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH /h\qlh[xCJOJPJQJ\^JaJnH tH )h[xCJOJPJQJ\^JaJnH tH  G)H)\)j)ydRdK$H$Ifgd H$dK$H$Ifa$gd Hkd,$$IfK^(  t 022K4K` a/p yt Hj)k)p)q))[I9, $H$Ifgd H$$H$Ifa$gd HdK$H$Ifgd Hkd{-$$IfK0(  t022K4K` a/pyt Hp)q))))****** **ɱkT@)@),h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH )h[xCJOJPJQJ\^JaJnH tH /h.h[xCJOJPJQJ\^JaJnH tH 2h.h[xCJOJPJQJ\]^JaJnH tH 8h.h[x56CJOJPJQJ\]^JaJnH tH  )**$dK$H$Ifa$gd H$dK$H$Ifa$gd H**!*=*0dK$H$Ifgd Hkdl.$$IfK\(DDDVD  t04KB` a/pyt H=***$dK$H$Ifa$gd HdK$H$Ifgd H*******.,C,D,E,F,G,I,J,Z,k,n,-. . .J.K.N.O.p.t.|.....ϸϸϸvvv^/jh[xCJOJPJQJU^JaJnH tH ,h!Eh[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH  ****0dK$H$Ifgd Hkd/$$IfK\(DDDVD  t04KB` a/pyt H*`+a+.,D,$dK$H$Ifa$gd H$dK$H$Ifa$gd HD,E,J,%dK$H$Ifgd Hkd0$$IfK\(DDDVDD  t(04KB` a/p(yt HJ,p,,,,,,}-~-- .$dK$H$Ifa$gd H$dK$H$Ifa$gd H . ..(dK$H$Ifgd Hkd1$$IfK\(VD  t(04K` a/p(yt H..K..L///$dK$H$Ifa$gd HdK$H$Ifgd H$dK$H$Ifa$gd H.///J/K/L/t////////սՍՍv_E.,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,hfvXh[xCJOJPJQJ^JaJnH tH ,h!Eh[xCJOJPJQJ^JaJnH tH 0h{7h[x0J#CJOJPJQJ^JaJnH tH /jh[xCJOJPJQJU^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h#h[xCJOJPJQJ^JaJnH tH ///(dK$H$Ifgd Hkd2$$IfKl\(VD  t(04K` a/p(yt H//////////////0麣r[C+/h[xB*CJOJPJQJ^JaJnH phtH /hqzB*CJOJPJQJ^JaJnH phtH ,h5h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,hfvXh[xCJOJPJQJ^JaJnH tH 5h?e1h[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH /////$dK$H$Ifa$gd H$dK$H$Ifa$gd H///(dK$H$Ifgd Hkd'4$$IfK\\(VD  t(04K` a/p(yt H//R0s11$dK$H$Ifa$gd H$dK$H$Ifa$gd H$$H$Ifa$gd H0O0Q0R00r1s111111̴r[A*r,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH ,h&h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH / *h&h[xCJOJPJQJ^JaJnH tH /h[xB*CJOJPJQJ^JaJnH phtH 5h&h[xB*CJOJPJQJ^JaJnH phtH  111(dK$H$Ifgd HkdT5$$IfKi\(VD  t(04K` a/p(yt H1222222222w4444444Ѻr^^rF,r2h[Qh[x5CJOJPJQJ\^JaJnH tH /h[Qh[x5CJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH / *h&h[xCJOJPJQJ^JaJnH tH ,hD}h[xCJOJPJQJ^JaJnH tH 12222$dK$H$Ifa$gd H$dK$H$Ifa$gd H$$H$Ifa$gd H222(dK$H$Ifgd Hkd6$$IfK\(VD  t(04K` a/p(yt H22u33w44$dK$H$Ifa$gd H$dK$H$Ifa$gd H444(dK$H$Ifgd Hkd7$$IfK\(VD  t(04K` a/p(yt H44667mm[dK$H$Ifgd H$dK$H$Ifa$gd H|kd8$$IfK(  t 04K` a/p yt H455a6i6|66777)7*7778797=7縡jS?&h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 8hg=h[x5B*CJOJPJQJ^JaJnH phtH 2h[x5B*CJOJPJQJ^JaJnH phtH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH )h[xCJOJPJQJ\^JaJnH tH /h\qlh[xCJOJPJQJ\^JaJnH tH 77*787m[dK$H$Ifgd H$dK$H$Ifa$gd H|kd9$$IfK(  t 04K` a/p yt H8797>7889dR===$dK$H$Ifa$gd HdK$H$Ifgd HkdQ:$$IfK0(  t04K` a/pyt H=7z777778899999E:^:::;k<l<y<z<~<<)=L=N=c=d=e=i==> > >>>餍餍v__,h[x5CJOJPJQJ\^JaJnH tH ,h^=h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,hmh[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH $999$dK$H$Ifa$gd H999(dK$H$Ifgd Hkd0;$$IfK- \(VD  t(04K` a/p(yt H9:;l<x<y<$dK$H$Ifa$gd H$dK$H$Ifa$gd Hy<z<<(dK$H$Ifgd HkdW<$$IfK\(VD  t(04K` a/p(yt H<<M=N=d=$dK$H$Ifa$gd H$dK$H$Ifa$gd Hd=e=j=(dK$H$Ifgd Hkd=$$IfK\(VD  t(04K` a/p(yt Hj=== >$dK$H$Ifa$gd H$dK$H$Ifa$gd H > >>(dK$H$Ifgd Hkd>$$IfK\(VD  t(04K` a/p(yt H>V?W?@@@@@1@2@3@@@I@L@͹qZqZ?'/h[x5>*CJOJPJQJ\^JaJnH tH 5h.h[x5>*CJOJPJQJ\^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h=h[xCJOJPJQJ^JaJnH tH 5h=h[xB*CJOJPJQJ^JaJnH phtH  >W?X?@@$dK$H$Ifa$gd H$dK$H$Ifa$gd H$$H$Ifa$gd H@@2@(dK$H$Ifgd Hkd?$$IfK \(VD  t(04K` a/p(yt H2@3@L@TAUAAAyBxcccccc$dK$H$Ifa$gd Hkd A$$IfK(D  t 022K4KB` a/p yt HL@xByBzBBBBBBBBBBһmS?$5h.h[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h[x5B*CJOJPJQJ^JaJnH phtH 8h[&h[x5B*CJOJPJQJ^JaJnH phtH ,h5h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH ,heg|h[xCJOJPJQJ^JaJnH tH  yBzBBBxcQdK$H$Ifgd H$dK$H$Ifa$gd HkdA$$IfK(D  t 022 -4KB` a/p yt HBBBBCDkEEdRRRRRRdK$H$Ifgd HkdB$$IfK0(  t04K` a/pyt HBCCCDDEEEFFFFFFFFFGGGGH̵ppYD(h.h[xCJOJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH 5h.h[xB*CJOJPJQJ^JaJnH phtH /h[xB*CJOJPJQJ^JaJnH phtH EFFFFFF$dK$H$Ifa$gd H$dK$H$Ifa$gd HFFkdC$$IfK\(DDDVD  t(02K24KB` a/p(yt HFFGH5H$dK$H$Ifa$gd H$d(($H$Ifgd H$d<<$H$Ifgd HdK$H$Ifgd HHH3H4H5H6H7H;HHH6J7JMJQJYJZJ[J_J̵̞sXsAs̵̞s,hw:h[xCJOJPJQJ^JaJnH tH 5h.h[xB*CJOJPJQJ^JaJnH phtH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH 1h.h[xB*CJOJQJ^JaJnH phtH 5H6HkdD$$IfK\(VD  t(02K24K` a/p(yt H6H;Hh[xCJOJQJ^JaJnH tH ,h>h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH /h[xB*CJOJPJQJ^JaJnH phtH 5hHdh[xB*CJOJPJQJ^JaJnH phtH  KKKL0dK$H$Ifgd HkdEG$$IfK\(DDDVD  t04KB` a/pyt HKKKKKKKKLLLOLYLLLLLMվվtt]C2h.h[x5CJOJPJQJ\^JaJnH tH ,h>LVh[xCJOJPJQJ^JaJnH tH ,h]h[xCJOJPJQJ^JaJnH tH /h[xB*CJOJPJQJ^JaJnH phtH 5h.h[xB*CJOJPJQJ^JaJnH phtH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH LLLMM$dK$H$Ifa$gd H$dK$H$Ifa$gd HMMM M%MMMSOTOUOtOuOvOzOϸnW@&ϸ2hzh[x5CJOJPJQJ\^JaJnH tH ,hU3h[xCJOJPJQJ^JaJnH tH ,hzh[xCJOJPJQJ^JaJnH tH 5hU3h[xB*CJOJPJQJ^JaJnH phtH 5hzh[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH  M M%M0dK$H$Ifgd Hkd\H$$IfK\(DDDVD  t04KB` a/pyt H%MM`NaNNNTOUO]OuO$dK$H$Ifa$gd H$dK$H$Ifa$gd H uOvO{OO3!!dK$H$Ifgd HkdyI$$IfK\(VD  t04K` a/pyt HzO{OOOOOPPPPPPPPP Q QζnV?n?,h5h[xCJOJPJQJ^JaJnH tH / *h.h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,hBh[xCJOJPJQJ^JaJnH tH /h[xB*CJOJPJQJ^JaJnH phtH 5h.h[xB*CJOJPJQJ^JaJnH phtH ,h.h[xCJOJPJQJ^JaJnH tH OPPPPP$dK$H$Ifa$gd H$dK$H$Ifa$gd HPP Q0dK$H$Ifgd HkdJ$$IfK\(DDDVD  t04KB` a/pyt H Q Q"Q1Qm[dK$H$Ifgd H$dK$H$Ifa$gd H|kdK$$IfK(  t 04K` a/p yt H QQ!Q"Q0Q1Q2Q?QHQRR T㲘fN7#7&h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH /h[x5>*CJOJPJQJ\^JaJnH tH 5h.h[x5>*CJOJPJQJ\^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h[x5B*CJOJPJQJ^JaJnH phtH 8h[&h[x5B*CJOJPJQJ^JaJnH phtH  1Q2QKQDRtS TTdOOOO=dK$H$Ifgd H$dK$H$Ifa$gd Hkd\L$$IfK0(  t04K` a/pyt H TTTTTTUUUtVͳmU:#,h]h[xCJOJPJQJ^JaJnH tH 5h.h[xB*CJOJPJQJ^JaJnH phtH /h[xB*CJOJPJQJ^JaJnH phtH 5h]h[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH 2hLh[x5CJOJPJQJ\^JaJnH tH /hh[xCJOJPJQJ\^JaJnH tH  TTTUvVwV)W*W+Wpp[[[FF$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd H|kd;M$$IfK(  t 04K` a/p yt HtV)WHWUW_WgWhWiWjWkWrWWWSXTXYҸҸҸҡrZr?5h]h[xB*CJOJPJQJ^JaJnH phtH /h[xB*CJOJPJQJ^JaJnH phtH 5h.h[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH +W:WHWIWiWjW$dK$H$Ifa$gd HjWkWlWmW3!!dK$H$Ifgd HkdM$$IfK\(VD  t04K` a/pyt HmWrWsWTXDYEYYYYZ$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd H YYZZZJ[\\\\C\D\u\\\\\\\]$^һu[Cu/h[xB*CJOJPJQJ^JaJnH phtH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH 5h]h[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,h]h[xCJOJPJQJ^JaJnH tH ZZZK[3!!dK$H$Ifgd HkdO$$IfK\(VD  t04K` a/pyt HK[\D\E\F\W\e\t\u\\\$dK$H$Ifa$gd H$dK$H$Ifa$gd H \\\\3!!dK$H$Ifgd HkdP$$IfK\(VD  t04K` a/pyt H\]%^,^-^;^I^r^$dK$H$Ifa$gd H$dK$H$Ifa$gd H$^%^3^4^I^q^r^s^x^^________ѺѺѣw\E.Ѻѣ,hBh[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH 5h.h[xB*CJOJPJQJ^JaJnH phtH /h[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH (h.h[xCJOJQJ^JaJnH tH r^s^x^^3!!dK$H$Ifgd Hkd)Q$$IfK\(VD  t04K` a/pyt H^^_q___________$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd H ___3!dK$H$Ifgd Hkd:R$$IfK\(VD  t04K` a/pyt H___P`Q`,a-aaaabhbyb}bbbbbս콇pV;5hJ8h[x57CJOJPJQJ\^JaJnH tH 2hJ8h[x5CJOJPJQJ\^JaJnH tH ,hzh[xCJOJPJQJ^JaJnH tH ,h]h[xCJOJPJQJ^JaJnH tH 5h,h[xB*CJOJPJQJ^JaJnH phtH h[x/h[xB*CJOJPJQJ^JaJnH phtH ,h,h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH _-aaaabbbbbbbbbb$dK$H$Ifa$gd H$dK$H$Ifa$gd H $Ifgd H bbbc3!!dK$H$Ifgd HkdKS$$IfK\(VD  t04K` a/pyt HbbbZcocccddddddeee8eվվ|eK4K4,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h]h[xCJOJPJQJ^JaJnH tH "h[xCJOJQJ^JaJnH tH (hpUh[xCJOJQJ^JaJnH tH 5h]h[xB*CJOJPJQJ^JaJnH phtH ,hpUh[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH cddee$dK$H$Ifa$gd H$dK$H$Ifa$gd Heeee3!!dK$H$Ifgd Hkd\T$$IfK\(VD  t04K` a/pyt H8eeeegggggggggghhghhhhh i iViWiiiiiiiijUjVjgjhjJkKkվ龧v_龧v,heh[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,hpUh[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h/5h[xCJOJPJQJ^JaJnH tH %eggggg$dK$H$Ifa$gd H$dK$H$Ifa$gd Hgggh3!!dK$H$Ifgd HkdmU$$IfK\(VD  t04K` a/pyt Hhhhhiiiii$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd Hiiihj3!!dK$H$Ifgd Hkd~V$$IfK\(VD  t04K` a/pyt Hhjjkkkkkk$dK$H$Ifa$gd H$dK$H$Ifa$gd HKkkkkkkkkkkklljlklllllEmFmvmwmxmmmm龧v[C[龧/h[xB*CJOJPJQJ^JaJnH phtH 5h/5h[xB*CJOJPJQJ^JaJnH phtH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,hpUh[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h/5h[xCJOJPJQJ^JaJnH tH kkkkl3!!dK$H$Ifgd HkdW$$IfK\(VD  t04K` a/pyt Hklwmxmmmm$dK$H$Ifa$gd H$dK$H$Ifa$gd Hmmmmm+n,n$o%o2o3oFoGoHoMoooooϸr[鸤rCrC/h[xB*CJOJPJQJ^JaJnH phtH ,h7=h[xCJOJPJQJ^JaJnH tH 5h7=h[xB*CJOJPJQJ^JaJnH phtH ,hpUh[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH mmm,n3!!dK$H$Ifgd HkdX$$IfK\(VD  t04K` a/pyt H,n%o,o:oGo$dK$H$Ifa$gd H$dK$H$Ifa$gd HGoHoMoo3!!dK$H$Ifgd HkdY$$IfK\(VD  t04K` a/pyt Ho5p6p7phqiqqqqqqrrrṟoX>X>X2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,h]h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h7=h[xCJOJPJQJ^JaJnH tH 5h]h[xB*CJOJPJQJ^JaJnH phtH /h[xB*CJOJPJQJ^JaJnH phtH 5hL(h[xB*CJOJPJQJ^JaJnH phtH o7pqqqqqr$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd Hrrrr3!!dK$H$Ifgd HkdZ$$IfK\(VD  t04K` a/pyt Hrrr~rr;spsqs~sssssstպqW@W@%5hh[xB*CJOJPJQJ^JaJnH phtH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h]h[xCJOJPJQJ^JaJnH tH ,h7h[xCJOJPJQJ^JaJnH tH 5h]h[xB*CJOJPJQJ^JaJnH phtH 5h7h[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH rqsxssss$dK$H$Ifa$gd H$dK$H$Ifa$gd Hssst3!!dK$H$Ifgd Hkd[$$IfK\(VD  t04K` a/pyt HttuuuuuuuuuuuvvvvvӼt`E-E伥t/h[xB*CJOJPJQJ^JaJnH phtH 5h/5h[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,h(h[xCJOJPJQJ^JaJnH tH  hh[xCJOJQJ^JaJ5h]h[xB*CJOJPJQJ^JaJnH phtH tuuuuu$dK$H$Ifa$gd H$dK$H$Ifa$gd Huuuv3!!dK$H$Ifgd Hkd\$$IfK\(VD  t04K` a/pyt Hvvvvv$dK$H$Ifa$gd H$dK$H$Ifa$gd Hvvv3!dK$H$IfgdRkd]$$IfK\(VD  t04K` a/pyt Hvvwwwwwww x x x؏x^G0,h5h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h5hRCJOJPJQJ^JaJnH tH /hRhR5CJOJPJQJ^JaJnH tH 2h'hR5CJOJPJQJ\^JaJnH tH ,hR5CJOJPJQJ\^JaJnH tH &hRCJOJPJQJ^JaJnH tH &hRCJOJPJQJ^JaJnH tH  vv?w@wAwwwwww$ G$Ifa$gdR$$@&H$Ifa$gdR$dK$H$Ifa$gdR$$@&H$Ifa$gdR$@&H$IfgdR ww x(dK$H$Ifgd Hkd_$$IfK\(VD  t(04K` a/p(ytR x x%xxGzzj{mmmm[dK$H$Ifgd H$dK$H$Ifa$gd H|kd-`$$IfK(  t 04K` a/p yt H x"x)x-x1x2x:y;ymznzzM{N{i{j{k{}{ммммСr[>8hp ch[x5B*CJOJPJQJ^JaJnH phtH ,h5h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH /h0aAB*CJOJPJQJ^JaJnH phtH 5hllh[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH /h[x5>*CJOJPJQJ\^JaJnH tH j{k{{{ppdK$H$Ifgd H|kd`$$IfK(  t 04K` a/p yt H}{{{{{{{c|d|U}V}x}y}}}}̵sX@)s̵̞,hqJZh[xCJOJPJQJ^JaJnH tH /h[xB*CJOJPJQJ^JaJnH phtH 5hqJZh[xB*CJOJPJQJ^JaJnH phtH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH 2h[x5B*CJOJPJQJ^JaJnH phtH {{{e|V}dRR=$dK$H$Ifa$gd HdK$H$Ifgd Hkda$$IfK0(  t04K` a/pyt HV}b}c}~}}$dK$H$Ifa$gd H}}}X~3!!dK$H$Ifgd Hkdb$$IfK\(VD  t04K` a/pyt H}}W~GHkڀρЁсՁη靆o[Dη[靆o[,hkN{h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,hqJZh[xCJOJPJQJ^JaJnH tH 5hqJZh[xB*CJOJPJQJ^JaJnH phtH ,h.h[xCJOJPJQJ^JaJnH tH X~H$dK$H$Ifa$gd H$dK$H$Ifa$gd Hۀ3!!dK$H$Ifgd Hkdc$$IfK\(VD  t04K` a/pyt Hۀ΁ρ$dK$H$Ifa$gd H$dK$H$Ifa$gd HρЁՁ3!!dK$H$Ifgd Hkdd$$IfK\(VD  t04K` a/pyt HՁ@A()*+01GHLMͶqZCCq,h[x5CJOJPJQJ\^JaJnH tH ,hMih[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH ,hqJZh[xCJOJPJQJ^JaJnH tH 5hqJZh[xB*CJOJPJQJ^JaJnH phtH $dK$H$Ifa$gd H$dK$H$Ifa$gd HA3!!dK$H$Ifgd Hkde$$IfK\(VD  t04K` a/pyt HA)*8FG$dK$H$Ifa$gd H$dK$H$Ifa$gd HGHM3!!dK$H$Ifgd Hkdf$$IfK[\(VD  t04K` a/pyt HMAGH^_cdʆˆyͳqV?ͳqq,hMih[xCJOJPJQJ^JaJnH tH 5hMih[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h5h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH 5h.h[xB*CJOJPJQJ^JaJnH phtH AO]^$dK$H$Ifa$gd H$dK$H$Ifa$gd H^_dˆ3!!dK$H$Ifgd Hkdg$$IfK\(VD  t04K` a/pyt Hˆy$dK$H$Ifa$gd H$dK$H$Ifa$gd H3!!dK$H$Ifgd Hkdh$$IfK\(VD  t04K` a/pyt HΈЈ׈و$̸v_E_E_E.E_E,h5h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,hMih[xCJOJPJQJ^JaJnH tH &hqzCJOJPJQJ^JaJnH tH 5hMih[xB*CJOJPJQJ^JaJnH phtH /hqzB*CJOJPJQJ^JaJnH phtH ؈$dK$H$Ifa$gd[x$dK$H$Ifa$gd HdK$H$Ifgd H #3!dK$H$Ifgd Hkd j$$IfK\(VD  t04K` a/pyt H#$<@ŠÊmmmmm$dK$H$Ifa$gd H|kd"k$$IfK(  t 04K` a/p yt H$1:<?@ŠĊ֊؊ي̵ss\?%?2h[x5B*CJOJPJQJ^JaJnH phtH 8hB~h[x5B*CJOJPJQJ^JaJnH phtH ,hllh[xCJOJPJQJ^JaJnH tH ,hd;h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,h,h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH /h[x5>*CJOJPJQJ\^JaJnH tH 5h.h[x5>*CJOJPJQJ\^JaJnH tH  ÊĊيxffdK$H$Ifgd Hkdk$$IfK(D  t 022 -4KB` a/p yt HيenjȌ̌_ay{}ϻtϻϻYB,hh[xCJOJPJQJ^JaJnH tH 5hU3h[xB*CJOJPJQJ^JaJnH phtH (h.h[xCJOJQJ^JaJnH tH 5hh[xB*CJOJPJQJ^JaJnH phtH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 9fdR===$dK$H$Ifa$gd HdK$H$Ifgd Hkdl$$IfK0%(  t04K` a/pyt HŌƌ$dK$H$Ifa$gd H$$d(($H$Ifa$gd Hƌnjkdm$$IfK\%(DDDD  t(02K24KB` a/p(yt Hnǰ`awx$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd Hxyz%dK$H$Ifgd Hkdn$$IfK\%(DDDD  t(04KB` a/p(yt Hzgo$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd Hfg{xyÐȐҸҸr[ҸrC/h[xB*CJOJPJQJ^JaJnH phtH ,hyah[xCJOJPJQJ^JaJnH tH 5hyah[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,hh[xCJOJPJQJ^JaJnH tH ,hU3h[xCJOJPJQJ^JaJnH tH 3!dK$H$Ifgd Hkdo$$IfK\%(D  t04K` a/pyt Hy$dK$H$Ifa$gd H$dK$H$Ifa$gd H3!dK$H$Ifgd Hkdq$$IfK\%(D  t04K` a/pyt H$dK$H$Ifa$gd H$dK$H$Ifa$gd HÐȐ3!dK$H$Ifgd Hkdr$$IfK\%(D  t04K` a/pyt HȐɒ$dK$H$Ifa$gd H$dK$H$Ifa$gd HNOޖߖһv[һvDDDvD,h.h[xCJOJPJQJ^JaJnH tH 5hJh[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,hh[xCJOJPJQJ^JaJnH tH ,hJh[xCJOJPJQJ^JaJnH tH ,hhqzCJOJPJQJ^JaJnH tH 3!dK$H$Ifgd Hkd0s$$IfK\%(D  t04K` a/pyt HO$dK$H$Ifa$gd H$dK$H$Ifa$gd H3!dK$H$Ifgd HkdAt$$IfK\%(D  t04K` a/pyt Hߖ$dK$H$Ifa$gd H$dK$H$Ifa$gd H0dK$H$Ifgd HkdRu$$IfK\%(DDDD  t04KB` a/pyt HȘɘܘݘQվթzczH1,hp5h[xCJOJPJQJ^JaJnH tH 5hp5h[xB*CJOJPJQJ^JaJnH phtH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH (h.h[xCJOJQJ^JaJnH tH (hh[xCJOJQJ^JaJnH tH ,hh[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ɘט$dK$H$Ifa$gd H$$d(($H$Ifa$gd H$dK$H$Ifa$gd H3!dK$H$Ifgd Hkdov$$IfKD\%(D  t04K` a/pyt HR™a$dK$H$Ifa$gd H$dK$H$Ifa$gd H™3@O`jkzWX̛͛\]̵̵̵̵̚kWkWkWkW<5hllh[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH /h[x5>*CJOJPJQJ\^JaJnH tH 5h.h[x5>*CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH 1h.h[xB*CJOJQJ^JaJnH phtH aby0dK$H$Ifgd Hkdw$$IfK\%(DDDD  t04KB` a/pyt Hyz`xffffffffdK$H$Ifgd Hkdx$$IfK(D  t 022K4KB` a/p yt H ϸjS9%&h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h[x5B*CJOJPJQJ^JaJnH phtH 8h h[x5B*CJOJPJQJ^JaJnH phtH ,h.h[xCJOJPJQJ^JaJnH tH ,h.hqzCJOJPJQJ^JaJnH tH /hqzB*CJOJPJQJ^JaJnH phtH /h[xB*CJOJPJQJ^JaJnH phtH  xcQdK$H$Ifgd H$dK$H$Ifa$gd Hkdly$$IfK(D  t 022 -4KB` a/p yt H`adOOOOO$dK$H$Ifa$gd Hkd;z$$IfK0(`(  t04K` a/pyt H "&'?Q|}΢ͶmR:R#,hvh[xCJOJPJQJ^JaJnH tH /h[xB*CJOJPJQJ^JaJnH phtH 5hvh[xB*CJOJPJQJ^JaJnH phtH 5h.h[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH ,hp5h[xCJOJPJQJ^JaJnH tH 5hp5h[xB*CJOJPJQJ^JaJnH phtH  $dK$H$Ifa$gd H kd{$$IfK\(DDDD  t(02K24KB` a/p(yt H &'}#k$dK$H$Ifa$gd H$dK$H$Ifa$gd H  £ãˤѤ<=ϻ須s\Eϻ*5hPAh[xB*CJOJPJQJ^JaJnH phtH ,h[x5CJOJPJQJ\^JaJnH tH ,hvh[xCJOJPJQJ^JaJnH tH (hvh[xCJOJQJ^JaJnH tH /h[xB*CJOJPJQJ^JaJnH phtH 5hvh[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH ,h.h[xCJOJPJQJ^JaJnH tH kdY|$$IfK\(D  t(02K24K` a/p(yt H £ãȤɤʤ$dK$H$Ifa$gd H$$d(($Ifa$gd H$dK$H$Ifa$gd H ʤˤkd}$$IfK\(D  t(02K24K` a/p(yt HˤѤ=$dK$H$Ifa$gd H$d<<$H$Ifgd HdK$H$Ifgd H={|纠rW<"2heh[x5CJOJPJQJ\^JaJnH tH 5hvh[xB*CJOJPJQJ^JaJnH phtH 5hPAh[xB*CJOJPJQJ^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH 2hPAh[x5CJOJPJQJ\^JaJnH tH /hvh[xCJOJPJQJ\^JaJnH tH )h[xCJOJPJQJ\^JaJnH tH /hPAh[xCJOJPJQJ\^JaJnH tH  3!!dK$H$Ifgd Hkd~$$IfK\(D  t04K` a/pyt H|$dK$H$Ifa$gd H$d<<$H$Ifgd H3!!dK$H$Ifgd Hkd$$IfK\(D  t04K` a/pyt H!"Iһs^sF//,h[x5CJOJPJQJ\^JaJnH tH /h.h[xCJOJPJQJ\^JaJnH tH )h[xCJOJPJQJ\^JaJnH tH /hvh[xCJOJPJQJ\^JaJnH tH (hvh[xCJOJQJ^JaJnH tH 5hvh[xB*CJOJPJQJ^JaJnH phtH ,h.h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH 2h.h[x5CJOJPJQJ\^JaJnH tH "JK$dK$H$Ifa$gd H$d<<$H$Ifgd HdK$H$Ifgd H 3!dK$H$Ifgd Hkd$$IfK\(D  t04K` a/pyt HԫիDEȭyeTII2,h'h[x>*B*CJOJQJ^JaJphjh'h[xU h'h[xCJOJQJ^JaJ&h[xCJOJPJQJ^JaJnH tH 8h'h[x5B*CJOJPJQJ^JaJnH phtH ,h'h[xCJOJPJQJ^JaJnH tH 5h'h[x5>*CJOJPJQJ\^JaJnH tH  h'h[x,h[x5CJOJPJQJ\^JaJnH tH 2h'h[x5CJOJPJQJ\^JaJnH tH ԫxccc$dK$H$Ifa$gd Hkd$$IfK(D  t 022K4KB` a/p yt HԫիxcQdK$H$Ifgd H$dK$H$Ifa$gd Hkdӂ$$IfK(D  t 022 -4KB` a/p yt H dRRRRdK$H$Ifgd Hkd$$IfK0%(  t04K` a/pyt H ɯүد8̸r̸r[r[r̸rC̸/ *h'h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2h'h[x5CJOJPJQJ\^JaJnH tH (h'h[xCJOJQJ^JaJnH tH ,h'h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH  h'h[x h'h[xCJOJQJ^JaJ5jh'h[x>*B*CJOJQJU^JaJph dR?,$d(($H$Ifgd H$d<<$H$Ifgd HdK$H$Ifgd Hkd$$IfK0@(  t04K` a/pyt H$dK$H$Ifa$gd Hkd`$$IfK\@% ( na  t(02K24K` a/p(yt HgTɯʯٯ$dK$H$Ifa$gd H$dK$H$Ifa$gd HdK$H$Ifgd H kd$$IfK\@% (D na  t(02K24KB` a/p(yt H8N$dK$H$Ifa$gd H$d<<$H$Ifgd Hd$H$Ifgd HdK$H$Ifgd H 0dK$H$Ifgd Hkdއ$$IfK \@% (D na  t04KB` a/pyt H|78ҵ -.67GH^îÜÂ{d{I5h'h[x5>*CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH  h'h[x2h'h[x5CJOJPJQJ\^JaJnH tH #h[xB*CJOJQJ^JaJph)h'h[xB*CJOJQJ^JaJph(h'h[xCJOJQJ^JaJnH tH ,h _h[xCJOJPJQJ^JaJnH tH  h _h[xCJOJQJ^JaJ|7ӵԵ ,-$dK$H$Ifa$gd Hd$7$8$H$Ifgd H & Fd$7$8$H$Ifgd H$ & Fd<<$H$Ifgd H$d<<$H$Ifgd Hd$H$Ifgd H-.G3!dK$H$Ifgd Hkd$$IfKP\@% ( na  t04K` a/pyt HGHa}xcc$dK$H$Ifa$gd Hkd$$IfK(D  t 022K4KB` a/p yt H^}~ ijksū髀iO2hOh[x5CJOJPJQJ\^JaJnH tH ,h'h[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH &h[xCJOJPJQJ^JaJnH tH 2h'h[x5CJOJPJQJ\^JaJnH tH 8h'h[x5B*CJOJPJQJ^JaJnH phtH  h'h[x,h'h[xCJOJPJQJ^JaJnH tH }~xffdK$H$Ifgd HkdՊ$$IfK(D  t 022 -4KB` a/p yt HC0tdRR===$dK$H$Ifa$gd HdK$H$Ifgd Hkd$$IfK0%(  t04K` a/pyt H$dK$H$Ifa$gd HŸf0dK$H$Ifgd Hkd$$IfK\@% (D na  t04KB` a/pyt Hf !i$dK$H$Ifa$gd H$dK$H$Ifa$gd Hijk0"$$@&H$a$gd[xkd$$IfK\@% (D na  t04KB` a/pyt HstXYELMUVWlmϸy_H_H3)h[xCJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2hKAh[x5CJOJPJQJ\^JaJnH tH /hz|h[x5CJOJPJQJ^JaJnH tH )h[x5CJOJPJQJ^JaJnH tH  hOh[x hmvh[xh[x,hOh[xCJOJPJQJ^JaJnH tH 2hOh[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH kEMmŽƽǽQ@$$@&H$Ifa$gd Hqkd$$Iflr'l( t0l(644 lap yt HdK$H$Ifgd H$@&H$^a$gd[x & F'gd[x$$ & F)@&H$a$gd[xmrĽŽƽǽнѽڽ۽ܽҺ碋v`v`vN;`%h[x5OJPJQJ^JaJnH tH "h[xOJPJQJ^JaJnH tH +hz|h[x5OJPJQJ^JaJnH tH (hz|h[xOJPJQJ^JaJnH tH ,hKAh[xCJOJPJQJ^JaJnH tH /hKAh[xCJOJPJQJ\^JaJnH tH /hch[xCJOJPJQJ\^JaJnH tH )h[xCJOJPJQJ\^JaJnH tH /h(nh[xCJOJPJQJ\^JaJnH tH ǽнѽڽ۽ܽ$dK$H$Ifa$gd H$@&H$Ifgd H$$@&H$Ifa$gd H GHIJӾ~lWllB(hR5OJPJQJ\^JaJnH tH (hz|hqzOJPJQJ^JaJnH tH "hROJPJQJ^JaJnH tH (hz|hROJPJQJ^JaJnH tH ,hRhRCJOJPJQJ^JaJnH tH &hRCJOJPJQJ^JaJnH tH (hz|h[xOJPJQJ^JaJnH tH .hz|h[x5OJPJQJ\^JaJnH tH (h[x5OJPJQJ\^JaJnH tH F55'$@&H$Ifgd H$$@&H$Ifa$gd HkdQ$$Ifl\r'S e t0l(644 lap(yt H HIJRj$dK$H$Ifa$gd H$$@&H$Ifa$gd H$@&H$Ifgd H Jijklqrs`abf]Ѽ|j|jjѼV?V?V,hKAh[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH "hROJPJQJ^JaJnH tH (hz|hROJPJQJ^JaJnH tH ,hRhRCJOJPJQJ^JaJnH tH &hRCJOJPJQJ^JaJnH tH (hz|hROJPJQJ^JaJnH tH (hR5OJPJQJ\^JaJnH tH 2hqzhR5CJOJPJQJ\^JaJnH tH jkl+$$@&H$Ifa$gd Hkd%$$Ifl\r'S e  t(0l(644 lap(ytqzlrsab$dK$H$Ifa$gdR$dK$H$Ifa$gd H$$@&H$Ifa$gdR$@&H$Ifgd H$$@&H$Ifa$gd H +$$@&H$Ifa$gd Hkd/$$Ifl\r'S e  t(0l(644 lap(ytqz^_g$dK$H$Ifa$gdR$dK$H$Ifa$gd H$@&H$Ifgd H$$@&H$Ifa$gd H]^_ +ϵv_A;hqzh[x5B*CJOJPJQJ\^JaJnH phtH ,hKAhRCJOJPJQJ^JaJnH tH &hRCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,hKAh[xCJOJPJQJ^JaJnH tH 2hqzhR5CJOJPJQJ\^JaJnH tH 2hqzh[x5CJOJPJQJ\^JaJnH tH ,hKAh[xCJOJPJQJ^JaJnH tH  F55'$@&H$Ifgd H$$@&H$Ifa$gd Hkd9$$Ifl\r4'So  t0l(644 lap(yt H ,$dK$H$Ifa$gdR$dK$H$Ifa$gd H$$@&H$Ifa$gd H$@&H$Ifgd H+,-34-./KLMNSTJKLhʶmSʋmS2hqzhqz5CJOJPJQJ\^JaJnH tH ;hqzh[x5B*CJOJPJQJ\^JaJnH phtH &h[xCJOJPJQJ^JaJnH tH ,hKAh[xCJOJPJQJ^JaJnH tH &hRCJOJPJQJ^JaJnH tH ,hKAh[xCJOJPJQJ^JaJnH tH ;hqzhR5B*CJOJPJQJ\^JaJnH phtH ,-.4A00$$@&H$Ifa$gd Hkd $$Ifl\r4'So  t0l(644 lag@s'p(yt H45-./=KL$dK$H$Ifa$gdR$dK$H$Ifa$gdqz$dK$H$Ifa$gd H$$@&H$Ifa$gd H$@&H$Ifgd H LMNTA00$$@&H$Ifa$gd Hkd$$Ifl\r4'So  t0l(644 lag@s'p(yt HTUKLZhijklmnopdK$H$Ifgdqz$dK$H$Ifa$gdqz$dK$H$Ifa$gd H$$@&H$Ifa$gd H$@&H$Ifgd Hhpqrwx123ʶpV8;hhqz5B*CJOJPJQJ\^JaJnH phtH 2hqzhqz5CJOJPJQJ\^JaJnH tH 5h[x5B*CJOJPJQJ\^JaJnH phtH ,hKAh[xCJOJPJQJ^JaJnH tH &hRCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,hKAh[xCJOJPJQJ^JaJnH tH ;hqzhqz5B*CJOJPJQJ\^JaJnH phtH  pqrxA00$$@&H$Ifa$gd Hkdɔ$$Ifl\r4'So  t0l(644 lag@s'p(yt Hxy2$dK$H$Ifa$gdqz$dK$H$Ifa$gd H$$@&H$Ifa$gd H$@&H$Ifgd H23GA//dK$H$Ifgd Hkd$$Ifl\r4'So  t0l(644 lag@s'p(yt H3;<=?GJKSrux溢pV?+&h[xCJOJPJQJ^JaJnH tH ,hKAh[xCJOJPJQJ^JaJnH tH 2hKAh[x5CJOJPJQJ\^JaJnH tH 2hch[x5CJOJPJQJ\^JaJnH tH /hch[xCJOJPJQJ\^JaJnH tH /hKAh[xCJOJPJQJ\^JaJnH tH )h[xCJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2hnh[x5CJOJPJQJ\^JaJnH tH /0}}ooo}}Z$dK$H$Ifa$gd H$@&H$Ifgd H$$@&H$Ifa$gd Hqkd$$Iflr'l( t0l(644 lap yt H ./0OPQվվվv\Eէ,hKAh[xCJOJPJQJ^JaJnH tH 2hKAh[x5CJOJPJQJ\^JaJnH tH 2hqzhqz5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH ,h5[h[xCJOJPJQJ^JaJnH tH ,hsh[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,hKAh[xCJOJPJQJ^JaJnH tH 08PQ/kd$$Ifl\r4'So  t0l(644 lap(yt H$dK$H$Ifa$gdqzQRXY$dK$H$Ifa$gdqz$@&H$Ifgd H$$@&H$Ifa$gd H +,DJϸx`[SLEA**,hOh[xCJOJPJQJ^JaJnH tH h[x hIh[x hch[xhAh[x5 h[x5/hIh[x5CJOJPJQJ^JaJnH tH )h[x5CJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,hKAh[xCJOJPJQJ^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH 2hqzhqz5CJOJPJQJ\^JaJnH tH ,hqz5CJOJPJQJ\^JaJnH tH D3( $H$a$gd[x$@&H$^a$gd[xkd$$Ifl\r4'So  t0l(644 lap(yt H6E\~$ H$^a$gd[x & F0^`0gd[x $@&H$a$gd[x$@&H$^a$gd[x$0@&H$^`0a$gd[x$@&H$^a$gd[x & F0^`0gd[x & Fgd[xJs YZ[^ptվՠqYHD=D2h&!h[xnH tH  h&!h[xh[x h&!h[xCJOJQJ^JaJ/h&!h[xCJOJPJQJ\^JaJnH tH )h[xCJOJPJQJ\^JaJnH tH 2hOh[x5CJOJPJQJ\^JaJnH tH ,h[x5CJOJPJQJ\^JaJnH tH  hch[x,hz|h[xCJOJPJQJ^JaJnH tH ,hch[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH  Z[pnoprsuvxy{|d$$@&H$^a$gd[x$0@&H$^`0a$gd[xgd[x & Fgd[x$$0@&H$^`0a$gd[x$$@&H$a$gd[xtiopqstvwyz|}~վh0aA0J!mHnHuhizHh H0J!jhizHh H0J!U hizHh Hh'0jh'0Uh H,h,? h[xCJOJPJQJ^JaJnH tH &h[xCJOJPJQJ^JaJnH tH ,hOh[xCJOJPJQJ^JaJnH tH |gd H0&P 1h. A!"#$% $$If!vh#v#vN #vJ:V lo  t&&&0655N 5Jap&&&yt H$$If!vh#v#vN #vJ:V l| t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#vN #vJ:V l t0655N 5Japyt H$$If!vh#v#v #v]:V l  t&&&0l(655 5]ap&&&yt H$$If!vh#v#v #v]:V l t0l(655 5]apyt H$$If!vh#v#v #v]:V l t0l(655 5]apyt H$$If!vh#v#v #v]:V l t0l(655 5]apyt H$$If!vh#v#v #v]:V l t0l(655 5]apyt H$$If!vh#v#v #v]:V l4 t0l(655 5]apyt H$$If!vh#v#v #v]:V lx t0l(655 5]apyt H$$IfD!vh#vD #v:V   t6,5D 5/ /  / 22 l4 Bapyt H$$IfD!vh#vD #v:V  t6,5D 5/ / / /  22 l4 ayt H$$IfD!vh#vD #v:V  t6,5D 5/ / / /  22 l4 ayt H$$IfD!vh#vD #v:V  t6,5D 5/ / / /  22 l4 ayt H$$IfD!vh#vD #v:V  t6,5D 5/ / / /  22 l4 ayt H$$IfD!vh#vD #v:V  t6,5D 5/ / / /  22 l4 ayt H$$IfD!vh#vD #v:V  t6,5D 5/ / / /  22 l4 ayt H$$If!vh#v9 #v:V   t0K659 522 l4 Ba pyt H$$If!vh#v9 #v:V  t0K659 522 l4 Ba yt H$$If!vh#v9 #v:V  t0K659 522 l4 Ba yt H$$If!vh#v9 #v:V  t0K659 522 l4 Ba yt H$$If!vh#v9 #v:V  t0K659 522 l4 Ba yt H$$If!vh#v9 #v:V  t0K659 522 l4 Ba yt H$$If!vh#v9 #v:V  t0K659 522 l4 Ba yt H$$If/!vh#v):V K  t 0,54KB` a/p yt H$$If/!vh#v):V K  t 0,522 -4KB` a/p yt H$$If/!vh#v#v #v#v:V K  t0,555n5,4KB` a/pyt H$$If/!vh#v#v #v#v:V K  t0,555n5,4KB` a/pyt H$$If/!vh#v#v #v#v:V K  t0,,555n5,4KB` a/pyt H$$If/!vh#v#v #v#v:V K  t0,,555n5,4KB` a/pyt H$$If/!vh#v#v #v#v:V K  t0,555n5,4KB` a/pyt H$$If/!vh#v#v #v#v:V K  t0,555n5,4KBB` a/pyt H$$If/!vh#v#v #v#v:V K  t0,,555n5,4KB` a/pyt H$$If/!vh#v):V K  t 0,522K4KB` a/p yt H$$If/!vh#v):V K  t 0,522 -4KB` a/p yt H$$If/!vh#v#v #vq#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vq#v:V KN  t0,555V5D4KB` a/pyt H$$If/!vh#v):V K  t 0,54K` a/p yt H$$If/!vh#v):V K  t 0,54K` a/p yt H$$If/!vh#v#v #vq#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v):V K  t 0,522K4KB` a/p yt H$$If/!vh#v):V K^  t 0,522K4K` a/p yt H$$If/!vh#v#vm:V K  t0,55 22K4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,,555V5D4KB` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4KB` a/pyt H+$$If/!vh#v#v #vr#v:V K  t(0,555V5D4KB` a/p(yt H+$$If/!vh#v#v #vr#v:V K  t(0,,555V5D4K` a/p(yt H+$$If/!vh#v#v #vr#v:V Kl  t(0,,555V5D4K` a/p(yt H+$$If/!vh#v#v #vr#v:V K\  t(0,,555V5D4K` a/p(yt H+$$If/!vh#v#v #vr#v:V Ki  t(0,,555V5D4K` a/p(yt H+$$If/!vh#v#v #vr#v:V K  t(0,,555V5D4K` a/p(yt H+$$If/!vh#v#v #vr#v:V K  t(0,,555V5D4K` a/p(yt H$$If/!vh#v):V K  t 0,54K` a/p yt H$$If/!vh#v):V K  t 0,54K` a/p yt H$$If/!vh#v#vm:V K  t0,55 4K` a/pyt H%$$If/!vh#v#v #vr#v:V K-  t(0,555V5D4K` a/p(yt H+$$If/!vh#v#v #vr#v:V K  t(0,,555V5D4K` a/p(yt H+$$If/!vh#v#v #vr#v:V K  t(0,,555V5D4K` a/p(yt H+$$If/!vh#v#v #vr#v:V K  t(0,,555V5D4K` a/p(yt H+$$If/!vh#v#v #vr#v:V K  t(0,,555V5D4K` a/p(yt H$$If/!vh#v):V K  t 0,522K4KB` a/p yt H$$If/!vh#v):V K  t 0,522 -4KB` a/p yt H$$If/!vh#v#vm:V K  t0,55 4K` a/pyt H=$$If/!vh#v#v #vr#v:V K  t(0,555V5D2K24KB` a/p(yt H=$$If/!vh#v#v #vr#v:V K  t(0,,555V5D2K24K` a/p(yt H=$$If/!vh#v#v #vr#v:V K  t(0,555V5D2K24KB` a/p(yt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4KB` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,,555V5D4KB` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4KB` a/pyt H$$If/!vh#v):V K  t 0,54K` a/p yt H$$If/!vh#v#vm:V K  t0,55 4K` a/pyt H$$If/!vh#v):V K  t 0,54K` a/p yt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H%$$If/!vh#v#v #vr#v:V K  t(0,555V5D4K` a/p(ytR$$If/!vh#v):V K  t 0,54K` a/p yt H$$If/!vh#v):V K  t 0,54K` a/p yt H$$If/!vh#v#vm:V K  t0,55 4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K[  t0,,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,,555V5D4K` a/pyt H$$If/!vh#v#v #vr#v:V K  t0,,555V5D4K` a/pyt H$$If/!vh#v):V K  t 0,54K` a/p yt H$$If/!vh#v):V K  t 0,522 -4KB` a/p yt H$$If/!vh#vA#v:V K  t0,55 4K` a/pyt H=$$If/!vh#v#vm #v#v:V K  t(0,5555D2K24KB` a/p(yt H+$$If/!vh#v#vm #v#v:V K  t(0,5555D4KB` a/p(yt H$$If/!vh#v#vm #v#v:V K  t0,5555D4K` a/pyt H$$If/!vh#v#vm #v#v:V K  t0,,5555D4K` a/pyt H$$If/!vh#v#vm #v#v:V K  t0,5555D4K` a/pyt H$$If/!vh#v#vm #v#v:V K  t0,5555D4K` a/pyt H$$If/!vh#v#vm #v#v:V K  t0,5555D4K` a/pyt H$$If/!vh#v#vm #v#v:V K  t0,,5555D4KB` a/pyt H$$If/!vh#v#vm #v#v:V KD  t0,,5555D4K` a/pyt H$$If/!vh#v#vm #v#v:V K  t0,5555D4KB` a/pyt H$$If/!vh#v):V K  t 0,522K4KB` a/p yt H$$If/!vh#v):V K  t 0,522 -4KB` a/p yt H$$If/!vh#v#v}:V K  t0,5`5( 4K` a/pyt H=$$If/!vh#v#v #v#v:V K  t(0,5555D2K24KB` a/p(yt H=$$If/!vh#v#v #v#v:V K  t(0,,5555D2K24K` a/p(yt H7$$If/!vh#v#v #v#v:V K  t(0,5555D2K24K` a/p(yt H$$If/!vh#v#v #v#v:V K  t0,5555D4K` a/pyt H$$If/!vh#v#v #v#v:V K  t0,5555D4K` a/pyt H$$If/!vh#v#v #v#v:V K  t0,5555D4K` a/pyt H$$If/!vh#v):V K  t 0,522K4KB` a/p yt H$$If/!vh#v):V K  t 0,522 -4KB` a/p yt H$$If/!vh#vA#v:V K  t0,55 4K` a/pyt H$$If/!vh#v\#v%:V K  t0,554K` a/pyt H=$$If/!vh#v\#v #v#v:V K  t(0,,55 5n5a2K24K` a/p(yt H=$$If/!vh#v\#v #v#v:V K  t(0,55 5n5a2K24KB` a/p(yt H$$If/!vh#v\#v #v#v:V K  t0,55 5n5a4KB` a/pyt H$$If/!vh#v\#v #v#v:V KP  t0,55 5n5a4K` a/pyt H$$If/!vh#v):V K  t 0,522K4KB` a/p yt H$$If/!vh#v):V K  t 0,522 -4KB` a/p yt H$$If/!vh#vA#v:V K  t0,55 4K` a/pyt H$$If/!vh#v\#v #v#v:V K  t0,55 5n5a4KB` a/pyt H$$If/!vh#v\#v #v#v:V K  t0,,55 5n5a4KB` a/pyt H$$If!vh#vl(:V l t0l(65l(/ ap yt H$$If!vh#vS#v #ve#v:V l t0l(65S5 5e5ap(yt H$$If!vh#vS#v #ve#v:V l  t(0l(65S5 5e5ap(ytqz$$If!vh#vS#v #ve#v:V l  t(0l(65S5 5e5ap(ytqz$$If!vh#vS#vo#v #v:V l t0l(65S5o5 5ap(yt H$$If!vh#vS#vo#v #v:V l t0l(65S5o5 5ag@s'p(yt H$$If!vh#vS#vo#v #v:V l t0l(65S5o5 5ag@s'p(yt H$$If!vh#vS#vo#v #v:V l t0l(65S5o5 5ag@s'p(yt H$$If!vh#vS#vo#v #v:V l t0l(65S5o5 5ag@s'p(yt H$$If!vh#vl(:V l t0l(65l(ap yt H$$If!vh#vS#vo#v #v:V l t0l(65S5o5 5ap(yt H$$If!vh#vS#vo#v #v:V l t0l(65S5o5 5ap(yt H s666666666vvvvv6666>6666666666666666666666666666666666666666666666hH6666666666666666666666666666666666666666666666666666666666666666662&6FVfv2(&6FVfv&6FVfv&6FVfv&6FVfv&6FVfv&6FVfv8XV~ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ OJPJQJ_HmH nH sH tH J`J [xNormal dCJ_HaJmH sH tH bb [x Heading 1$<@&H$"5CJ KH OJPJQJ\aJ tH dd [x Heading 2$<@&H$$56CJOJPJQJ\]aJtH f2f [x Heading 3dd@&\$'5B*CJOJPJQJ\aJphtH ^^ [x Heading 4$<@&H$5CJOJPJQJ\aJtH dd [x Heading 5<@&H$(56CJOJPJQJ\]^JaJtH RR [x Heading 6<@&H$5OJPJQJ\tH TT [x Heading 7<@&H$CJOJPJQJaJtH ZZ [x Heading 8<@&H$6CJOJPJQJ]aJtH P P [x Heading 9 <@&H$OJPJQJ^JtH DA D Default Paragraph FontRi@R 0 Table Normal4 l4a (k ( 0No List Z/Z [xHeading 1 Char&5CJ KH OJPJQJ\^JaJ tH \/\ [xHeading 2 Char(56CJOJPJQJ\]^JaJtH `/` [xHeading 3 Char+5B*CJOJPJQJ\^JaJphtH V/!V [xHeading 4 Char"5CJOJPJQJ\^JaJtH \/1\ [xHeading 5 Char(56CJOJPJQJ\]^JaJtH N/AN [xHeading 6 Char5OJPJQJ\^JtH P/QP [xHeading 7 CharCJOJPJQJ^JaJtH V/aV [xHeading 8 Char"6CJOJPJQJ]^JaJtH H/qH [xHeading 9 CharOJPJQJ^JtH > @> [xFooter B#d>/> [x Footer CharOJPJQJ^J^O^ [x0Level 1$ & F@&H$a$CJOJPJQJ^JaJtH ^O^ [x0Level 2$ & F@&H$a$CJOJPJQJ^JaJtH ^^ o[x0Level 3$ & F@&H$a$CJOJPJQJ^JaJtH ^^ [x0Level 4$ & F@&H$a$CJOJPJQJ^JaJtH ^^ [x0Level 5$ & F@&H$a$CJOJPJQJ^JaJtH ^^ [x0Level 6$ & F@&H$a$CJOJPJQJ^JaJtH ^^ [x0Level 7 $ & F@&H$a$CJOJPJQJ^JaJtH N)`N [x Page Number >*B*CJOJQJ^JaJph*/* [x0No List1":U`1: [x0 Hyperlink>*B*^JphC [x Table Grid7:V$0 $dCJOJPJQJ^JaJtH NRN &[x0Header %dCJOJPJQJ^JaJtH J/aJ %[x0 Header CharCJOJPJQJ^JaJtH TrT ([x0 Comment Text'H$CJOJPJQJ^JaJtH V/V '[x0Comment Text CharCJOJPJQJ^JaJtH F' F [x0Comment Reference CJ^JaJ [x Light List:V*0j.@j.j.j 44&*df f CJOJPJQJ^JaJtH  @^JaJ ^JaJ5\^JaJ5\^JaJ5\^JaJ5B*\^JaJph`+` ,[x0 Endnote Text+$da$CJOJPJQJ^JaJtH V/V +[x0Endnote Text CharCJOJPJQJ^JaJtH B* B [x0Endnote ReferenceH*^JLL [xLight Shading - Accent 1G:V.0OOj;@ j; jDOOjDOO44,.$da$f f B*CJOJPJQJ^JaJph6_tH  @^JaJ ^JaJ5\^JaJ5\^JaJ5\^JaJ5\^JaJC [x Table Grid17:V/0 /dCJOJPJQJ^JaJtH lV l [x0FollowedHyperlink1>*B*CJOJQJ^JaJeh@phr@XX 2[x0 Balloon Text 1H$CJOJPJQJ^JaJtH V/!V 1[x0Balloon Text CharCJOJPJQJ^JaJtH N2N j[xBody3$H$a$CJOJPJQJ^JaJtH 81B8 i[x0Body 14 ^P/QP [x0Level 1 as heading (text)5\81b8 [x0Body 26 ^P/qP [x0Level 2 as heading (text)5\<1< [x0Body 38 ^P/P [x0Level 3 as heading (text)5\<1< [x0Body 4:  ^ P/P [x0Level 4 as heading (text)5\<1< [x0Body 5<  ^ P/P [x0Level 5 as heading (text)5\<1< [x0Body 6>  ^ P/P [x0Level 6 as heading (text)5\<1< [x0Body 7@  ^ P/P [x0Level 7 as heading (text)5\P1"P [x0Bullet 1&B & F h@&^`P12P [x0Bullet 2&C & F h@&^`T1BT [x0Bullet 3)D & F  h@&^`T1RT [x0Bullet 4)E & F J h @&^`:12: [x0 Agreed TermsF5\H12H [x0Agreement TitleG5CJ\aJ6126 [x0 Date TitleH5\V1V [x0 Introduction#I & F h^`F1F [x0Introduction TitleJ5\L1L [x0Parties#K & F h^`<1< [x0 Parties TitleL5\bb N[x Footnote TextM$da$CJOJPJQJ^JaJtH X/X M[xFootnote Text CharCJOJPJQJ^JaJtH tt [xpTOC 1-O$ $@B dh^` a$"5CJOJPJQJ\^JaJtH tt [xpTOC 2-P$ $@B dh^` a$"5CJOJPJQJ\^JaJtH tt [xTOC 3-Q$ $@B dh^` a$"5CJOJPJQJ\^JaJtH rr [xTOC 4-R$ $ dh^` a$5CJOJPJQJ^JaJtH TT [xTOC 5SHd^HCJOJPJQJ^JaJtH TT [xTOC 6Td^CJOJPJQJ^JaJtH :!Q: [x Book Title 5:@\T"T [x0Caption VH$"5CJOJPJQJ\^JaJtH .X q. [x@Emphasis6]N!N [xPIntense Emphasis56B*\]phO Z[x Intense Quote.Y&dH$PO]^156B*CJOJPJQJ\]^JaJphOtH n/n Y[xIntense Quote Char156B*CJOJPJQJ\]^JaJphOtH T!T [xIntense Reference5:>*@B*\phPMdd [x List Paragraph\H$^CJOJPJQJ^JaJtH \ \ [x No Spacing]H$(CJOJPJQJ^J_HaJmH sH tH ZZ _[xQuote ^H$+6B*CJOJPJQJ]^JaJphtH X/X ^[x Quote Char+6B*CJOJPJQJ]^JaJphtH *W * [x`Strong5\TJT b[xSubtitlea$<@&H$a$CJOJPJQJaJtH N/!N a[x Subtitle CharCJOJPJQJ^JaJtH F!1F [x0Subtle Emphasis6B*]phH!AH [xSubtle Reference:>*B*phPM\>\ f[xTitlee$<@&H$a$"5CJ KHOJPJQJ\aJ tH R/aR e[x Title Char&5CJ KHOJPJQJ\^JaJ tH 6 6 [xp TOC Headingg@& d8d [x0 List Bullet 4h & FdCJOJPJQJ^JaJtH J/J 4[x0 Body 1 CharCJOJPJQJ^JaJtH F/F 3[x Body CharCJOJPJQJ^JaJtH R/R [xNo Heading 1 Text>*B*CJOJQJphR/R [xNo Heading 2 Text>*B*CJOJQJphR/R [xNo Heading 3 Text>*B*CJOJQJphR/R [xNo Heading 5 Text>*B*CJOJQJphL/L [x0 Level 3 CharCJOJPJQJ^JaJtH ^B^ q[x Body Textp 0d*$1$CJOJPJQJaJhP/P p[xBody Text CharCJOJPJQJ^JaJhJ/!J [xDeltaView Insertion >*B*phT2T [x Report Texts8d^8OJPJQJaJ,/, [x0 No List11ttRt [x titlegradient'uddd-D@M P|[$\$CJOJPJQJaJtH fbf [x pagetitlesvddd[$\$!B*CJ$OJPJQJaJ$phtH drd [x numerictextw$ddd[$\$a$CJOJPJQJaJtH dd [x whitemenuxddd[$\$!B*CJOJPJQJaJphtH jj [xmainpageyd-DM W~!B*CJOJPJQJaJphtH  [xinsetboxkzddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH \\ [xshaddow{-d<d\$^-CJOJPJQJaJtH  [x shaddowboxZ|ddd%d&d'd-DM OPQ[$\$CJOJPJQJaJtH VV [xdoc}d-DM CJOJPJQJaJtH  [xpodocP~d%d&d'd-DM OPQCJOJPJQJaJtH nn [x docsection'ddd$dN[$\$CJOJPJQJaJtH  [x dashedsectionZddd$d%d&d'dNOPQ[$\$CJOJPJQJaJtH ff [x numericlabel$ddd[$\$a$CJOJPJQJaJtH " [xnumericlabeltotal>$ddd$d&dNP[$\$a$CJOJPJQJaJtH h2h [xnoborder'ddd-DM [$\$5OJPJQJ\tH B [x markingheader'ddd-DM [$\$'5B* CJOJPJQJ\aJphtH pRp [x markingbody'ddd-DM [$\$CJOJPJQJaJtH |b| [xcalendarheader'ddd-DM Hl[$\$5CJOJPJQJ\aJtH r [xgrayboxkddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH  [x lightgrayboxkddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH  [x compareboxkddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH  [xcompareboxtitlekddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH  [x darkgrayboxkddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH nn [xblackparagraphddd[$\$!B*CJOJPJQJaJphtH ll [x greyparagraphddd[$\$!B*CJOJPJQJaJphtH nn [x greyheadingddd[$\$'6B*CJOJPJQJ]aJphtH xx [xsmallgreyheadingddd[$\$'6B*CJOJPJQJ]aJphtH j j [x redparagraphddd[$\$!B*CJOJPJQJaJphtH v v [xblackparagraphlinkddd[$\$!B*CJOJPJQJaJphtH t" t [xblueparagraphlinkddd[$\$!B*CJOJPJQJaJphtH |2 | [xblackparagraphboldddd[$\$'5B*CJOJPJQJ\aJphtH xB x [xsmallblackparagraphddd[$\$!B*CJ OJPJQJaJ phtH vR v [xsmallgreyparagraphddd[$\$!B*CJ OJPJQJaJ phtH Tb T [xnoneddd[$\$<CJOJPJQJaJtH r [xpro_alertbannerkddd$d%d&d'd-DM NOPQ[$\$!B*CJOJPJQJaJphtH  [xpro_alertbannershadow'ddd-DM [$\$CJOJPJQJaJtH  [x infomessagekddd$d%d&d'd-DM NOPQ[$\$!B*CJOJPJQJaJphtH  [xfloatingsectionkddd$d%d&d'd-DM NOPQ[$\$!B*CJOJPJQJaJphtH ` ` [x pro_alert d'5B*CJOJPJQJ\aJphtH ^ ^ [x pro_message d!B*CJOJPJQJaJphtH f f [xpro_alerttoggleddd[$\$CJOJPJQJaJtH ^ ^ [x popupmaskddd[$\$<CJOJPJQJaJtH h h [xpopupcontainerddd[$\$<CJOJPJQJaJtH  [x popupinnerkddd$d %d &d 'd -DM N O P Q [$\$CJOJPJQJaJtH R R [x popupframe dCJOJPJQJaJtH " [x popuptitlebarkddd$d%d&d 'd -DM HlNxOxP Qn[$\$!B*CJOJPJQJaJphtH \2 \ [x popuptitleddd[$\$CJOJPJQJaJtH B [x tableheader'ddd-D@M P|[$\$'5B*CJOJPJQJ\aJphtH jR j [xtablerow'ddd-D@M 1j[$\$CJOJPJQJaJtH ^b ^ [x groupheaderddd[$\$CJOJPJQJaJtH Fr F [xmenu dCJOJPJQJaJtH ^ ^ [x smallbuttonddd[$\$CJOJPJQJaJtH ` ` [x mediumbuttonddd[$\$CJOJPJQJaJtH ^ ^ [x largebuttonddd[$\$CJOJPJQJaJtH j j [x staticmenuddd9D[$\$!B*CJOJPJQJaJphtH ^ ^ [x dynamicmenuddd[$\$CJOJPJQJaJtH p p [xdynamicmenuitem d]^CJOJPJQJaJtH  [xdynamicmenuitemhoverad$d%d&d'd-DM N1jO1jP1jQ1jCJOJPJQJaJtH j j [x webpartstyleddd[$\$!B*CJOJPJQJaJph333tH v v [xpro_textboxcaptionddd[$\$!B*CJOJPJQJaJphtH  [xpro_workbenchtitleddd[$\$-56B*CJOJPJQJ\]aJphtH v" v [xpro_columncontainerleftddd[$\$CJOJPJQJaJtH ~2 ~ [xpro_columnbodyleft'ddd-DM [$\$CJOJPJQJaJtH xB x [xpro_columncontainerrightddd[$\$CJOJPJQJaJtH R [xpro_columnbodyright'ddd-DM [$\$CJOJPJQJaJtH rb r [xpro_divfieldcontainerddd[$\$CJOJPJQJaJtH pr p [xpro_lhpanelcontainerddd[$\$CJOJPJQJaJtH  [xpro_lhpaneltitlebarddd[$\$-56B*CJOJPJQJ\]aJphtH  [xpro_lhpanelbodykddd$d%d&d'd-DM NP|OP|PP|QP|[$\$CJOJPJQJaJtH p p [xpro_rhpanelcontainerddd[$\$CJOJPJQJaJtH  [xpro_rhpaneltitlebarddd[$\$-56B*CJOJPJQJ\]aJphtH  [xpro_rhpanelbodykddd$d%d&d'd-DM NP|OP|PP|QP|[$\$CJOJPJQJaJtH l l [xpro_panelcontainerddd[$\$CJOJPJQJaJtH  [xpro_paneltitlebarddd[$\$-56B*CJOJPJQJ\]aJphtH  [xpro_paneltitlebarborder'ddd&dPP|[$\$-56B*CJOJPJQJ\]aJphtH  [x pro_panelbodyud$d%d&d'd-DM NP|OP|PP|QP|]^CJOJPJQJaJtH  [xpro_simplepanelkddd$d%d&d'd-DM NP|OP|PP|QP|[$\$CJOJPJQJaJtH " [xpro_smallcentrepanelkddd$d%d&d'd-DM NP|OP|PP|QP|[$\$CJOJPJQJaJtH 2 [xpro_popuptitlebarkddd$d%d&d 'd -DM HlNxOxP Qn[$\$!B*CJOJPJQJaJphtH B [x pro_popupbodykddd$d %d &d 'd -DM N O P Q [$\$CJOJPJQJaJtH xR x [x pro_popupmask'ddd-D M 333[$\$<CJOJPJQJaJtH lb l [xpro_popupbutton$ddd[$\$a$CJOJPJQJaJtH r [xpro_popupwizardtitleddd[$\$'5B* CJOJPJQJ\aJphtH | | [xpro_popupwizarddescriptionddd[$\$CJOJPJQJaJtH  [xpro_popupbackground'ddd-DM [$\$CJOJPJQJaJtH  [xpro_tabpanelbackground'ddd-DM [$\$CJOJPJQJaJtH d d [xpro_menusleft1ddd[$\$CJOJPJQJaJtH d d [xpro_menusleft2ddd[$\$CJOJPJQJaJtH d d [xpro_menusleft3ddd[$\$CJOJPJQJaJtH r r [xpro_menusmiddle1ddd[$\$!B* CJOJPJQJaJphntH r r [xpro_menusmiddle2ddd[$\$!B* CJOJPJQJaJphntH r r [xpro_menusmiddle3ddd[$\$!B* CJOJPJQJaJphntH f f [xpro_menusright1ddd[$\$CJOJPJQJaJtH f" f [xpro_menusright2ddd[$\$CJOJPJQJaJtH f2 f [xpro_menusright3ddd[$\$CJOJPJQJaJtH jB j [x pro_menutextddd[$\$!B* CJOJPJQJaJphntH lR l [x pro_menutext3ddd[$\$!B* CJOJPJQJaJphntH hb h [xpro_menustartendddd[$\$CJOJPJQJaJtH jr j [xpro_menustartend3ddd[$\$CJOJPJQJaJtH j j [xpro_menublankcellddd[$\$CJOJPJQJaJtH d d [xpro_menuhleft1ddd[$\$CJOJPJQJaJtH d d [xpro_menuhleft2ddd[$\$CJOJPJQJaJtH d d [xpro_menuhleft3ddd[$\$CJOJPJQJaJtH r r [xpro_menuhmiddle1ddd[$\$!B* CJOJPJQJaJphntH r r [xpro_menuhmiddle2ddd[$\$!B* CJOJPJQJaJphntH r r [xpro_menuhmiddle3ddd[$\$!B* CJOJPJQJaJphntH f f [xpro_menuhright1ddd[$\$CJOJPJQJaJtH ff [xpro_menuhright2ddd[$\$CJOJPJQJaJtH ff [xpro_menuhright3ddd[$\$CJOJPJQJaJtH " [xpro_ribbonsubsectionhighlightZddd$d%d&d'dNϛOϛPϛQϛ[$\$CJOJPJQJaJtH 2 [xpro_ribbonsectionZddd$d%d&d'dNOPQ[$\$CJOJPJQJaJtH pBp [xpro_ribbonsubsectionddd[$\$CJOJPJQJaJtH `R` [x pro_menurow1ddd[$\$CJOJPJQJaJtH `b` [x pro_menurow2ddd[$\$CJOJPJQJaJtH `r` [x pro_menurow3ddd[$\$CJOJPJQJaJtH rr [xpro_emptyrowstyle$ddd[$\$a$B*OJPJQJphtH  [xpro_oddrowstyle'ddd-DM [$\$!B*CJOJPJQJaJphtH  [xpro_evenrowstyle'ddd-DM [$\$!B*CJOJPJQJaJphtH  [xpro_selectedrowstyle'ddd-D@M [$\$!B*CJOJPJQJaJphtH  [xpro_highlightedrowstyle'ddd-D@M [$\$!B*CJOJPJQJaJphtH  [x pro_gridstyleIddd%d&d'dOPQ[$\$CJOJPJQJaJtH  [xpro_emptygridstyle8ddd%d&dOP[$\$CJOJPJQJaJtH  [xpro_gridbottomborderstyleIddd%d&d'dOPQ[$\$CJOJPJQJaJtH  [xpro_emptygridbottomborderstyleIddd%d&d'dOPQ[$\$CJOJPJQJaJtH  [xpro_pagerrowstyle4$d$d&dNP|Pa$!B* CJOJPJQJaJphntH ~"~ [xpro_headerrowstyle2ddd[$\$'5B* CJOJPJQJ\aJphntH d2d [xpro_paddedcellddd[$\$CJOJPJQJaJtH B [xpro_headerrowstyle8ddd$d&dNPP|[$\$'5B* CJOJPJQJ\aJphntH jRj [xpro_datacellstyleddd[$\$CJOJPJQJaJtH b [xpro_headercellstyleIddd%d&d'dOPP|QP|[$\$CJOJPJQJaJtH r [xpro_lastheadercellstyle8ddd%d&dOPP|[$\$CJOJPJQJaJtH  [x pro_hintpopupkddd$d%d&d'd-DM NOPQ[$\$<CJOJPJQJaJtH  [xpro_alttooltiphd,d$d%d&d'd-DM NOPQ\$!B*CJOJPJQJaJphtH xx [x pro_ribbon'ddd-DM [$\$!B* CJOJPJQJaJphtH ff [xpro_ribboninnerddd[$\$CJOJPJQJaJtH rr [xpro_buttonribboninnerddd[$\$CJOJPJQJaJtH  [xpro_ribbonmenubuttonshadowpanelkddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH zz [xpro_ribbonmenubuttonpanelddd[$\$CJOJPJQJaJtH  [xpro_ribbonmenubuttonpanelmargin8ddd'd-DM Q[$\$CJOJPJQJaJtH  [x%pro_ribbonmenubuttonpanelmarginborder$dd-DM \$CJOJPJQJaJtH zz [xpro_ribbonmenuoption d]^CJOJPJQJaJtH " [xpro_ribbonmenuoptionselecteddd$d%d&d'dNΙOΙPΙQΙ]^CJOJPJQJaJtH ~2~ [xpro_ribbonmenuoptionimageddd9D[$\$CJOJPJQJaJtH B [xpro_ribbontitle $ddd9D[$\$a$-56B*CJOJPJQJ\]aJphtH R [xpro_treecontainerstylekddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH b [xpro_treecontrolstyle'ddd-DM [$\$CJOJPJQJaJtH r [x pro_calendarZddd$d%d&d'dNOPQ[$\$<CJOJPJQJaJtH rr [xpro_validatorfloatjdid\$^jCJOJPJQJaJtH ~~ [xpro_validatorfloathidden jdid\$^jCJOJPJQJaJtH tt [x pro_mandatory' ddd-DM [$\$CJOJPJQJaJtH  [xpro_mandatorynumeric- $ddd-DM [$\$a$CJOJPJQJaJtH  [xpro_warningstripk ddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH jj [xpro_hiddenlabel ddd[$\$<CJOJPJQJaJtH pp [xpro_mediumgreylabelddd[$\$B*OJPJQJphtH ll [x pro_greylabelddd[$\$!B*CJOJPJQJaJphtH rr [xpro_mediumblacklabelddd[$\$B*OJPJQJphtH rr [xpro_biggreylabelddd[$\$!B*CJOJPJQJaJphtH r"r [x pro_busywait'ddd-DM [$\$CJOJPJQJaJtH z2z [xpro_busywaitgrey'ddd-D M 333[$\$CJOJPJQJaJtH ~B~ [xpro_fieldlabelblackddd[$\$'5B*CJOJPJQJ\aJphtH pRp [xpro_erroriconcell$ddd[$\$a$CJOJPJQJaJtH lbl [xpro_fieldlabelddd[$\$5B* OJPJQJ\phtH ~r~ [xpro_smallfieldlabelddd[$\$'5B* CJOJPJQJ\aJphtH  [xpro_readonlycheckboxlabeldd[$^5B* OJPJQJ\phtH || [xpro_indentedfieldlabelddd[$\$5B* OJPJQJ\phtH  [x)pro_indentedfieldlabel[disabled=disabled]ddd[$\$!B*CJOJPJQJaJphtH nn [xpro_numericfield$ddd[$\$a$CJOJPJQJaJtH ~~ [xpro_indentednumericfield$ddd[$\$a$CJOJPJQJaJtH ll [x pro_infolabelddd[$\$!B* CJOJPJQJaJphtH XX [xpro_lineddd[$\$CJOJPJQJaJtH  [x pro_postitkddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH ll [xpro_postitinner ddd[$\$5CJOJ PJQJ \aJtH  [xpro_webpartsingletitle'!ddd-DM [$\$<CJOJPJQJaJtH " [xpro_whitepanelk"ddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH 2 [xpro_historydetailsd#d$d%d&d'dNOPQ]^CJOJPJQJaJtH `B` [x pro_hidden$ddd[$\$<CJOJPJQJaJtH R [xpro_progresspanels%ddd$d%d&d'd-DM NOPQ[$\$^CJOJPJQJaJtH b [xpro_progressbarh&d-d$d%d&d'd-DM NOPQ\$CJOJPJQJaJtH prp [xpro_navbarbackground'ddd[$\$CJOJPJQJaJtH \\ [x pro_navbar(ddd[$\$CJOJPJQJaJtH  [xpro_menupanelhldrk)ddd$d  %d &d 'd -D@M N  O P Q [$\$CJOJPJQJaJtH  [xpro_menupanelborderZ*ddd$d%d&d'dNOPQ[$\$CJOJPJQJaJtH  [x pro_menupanelk+ddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH jj [xpro_menupanelapps,ddd[$\$CJOJPJQJaJtH  [xpro_menupanelprocessesk-ddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH  [xpro_menufooterbuttonk.ddd$d%d&d'd-D@M NOPQ[$\$CJOJPJQJaJtH ll [x pro_evalbody/d-DM CJOJPJQJ^JaJtH  [xpro_evaltablestyle`0KdKK$d%d&d'd9DNW~OW~PW~QW~]KCJOJPJQJaJtH  [xpro_evalrowsupplierstyle1d-D@M '5B*CJOJPJQJ\aJphtH " [xpro_evalrowheaderstyle2d-D@M !B*CJOJPJQJaJphtH 2 [xpro_evalrowgroupstyle3d-DM !B*CJOJPJQJaJphtH B [xpro_evalrowtotalstyle4d-DM '5B*CJOJPJQJ\aJphtH R [xpro_evalrowdatastyle5d-DM !B*CJOJPJQJaJphtH b [xpro_evalrowfooterstyle6d-D@M '5B*CJOJPJQJ\aJphtH |r| [xpro_evalrowspacer7d-D@M !B*CJOJPJQJaJphtH  [xpro_evalcellemptystylea8d$d%d&d'd-DM NOPQ!B*CJOJPJQJaJphtH  [xpro_evalcellspacerstylea9d$d%d&d'd-D`M NW~OW~PW~QW~CJOJPJQJaJtH  [xpro_evalcelliconstyleV:$d$d%d&d'dNW~OW~PW~QW~a$!B*CJOJPJQJaJphtH  [xpro_evalcelliconhiddenstyleg;$d$d%d&d'd-DM NW~OW~PW~QW~a$!B*CJOJPJQJaJphtH  [xpro_evalcellnumericstyleV<$d$d%d&d'dNW~OW~PW~QW~a$!B*CJOJPJQJaJphtH  [xpro_evalcelltexttotalstyleV=$d$d%d&d'dNW~OW~PW~QW~a$!B*CJOJPJQJaJphtH  [xpro_evalcelltextsupplierstyleV>$d$d%d&d'dNW~OW~PW~QW~a$!B*CJOJPJQJaJphtH  [xpro_evalcellnumericwarnstyleV?$d$d%d&d'dNW~OW~PW~QW~a$!B*CJOJPJQJaJphtH  [x$pro_evalcellnumericheaderhiddenstyleg@$d$d%d&d'd-DM NW~OW~PW~QW~a$!B*CJOJPJQJaJphtH  [xpro_evalcelltextcriterionstylePAd$d%d &d'dNW~OW~ PW~QW~!B*CJOJPJQJaJphtH " [xpro_evalcelltextstylePBd$d%d&d'dNW~OW~PW~QW~!B*CJOJPJQJaJphtH 2 [xpro_evalcelltextnowrapstylePCd$d%d&d'dNW~OW~PW~QW~!B*CJOJPJQJaJphtH B [xpro_evalcelltextstatusstyleVD$d$d%d&d'dNW~OW~PW~QW~a$!B*CJOJPJQJaJphtH R [xpro_evalcellupdateselect'Eddd-DM [$\$CJOJPJQJaJtH lbl [xpro_evalcellselectFddd[$\$CJOJPJQJaJtH r [xpro_evalcellupdatebutton-G$ddd-DM [$\$a$CJOJPJQJaJtH dd [xpro_evalbuttonHddd[$\$CJOJPJQJaJtH  [xpro_tableheadercell'Iddd-DM [$\$$56CJOJPJQJ\]aJtH ~~ [xpro_listmenutitleJdd[$-56B*CJOJPJQJ\]aJphtH  [xpro_listmenusection$Kdd&d P7d [$'5B*CJOJPJQJ\aJph7dtH `` [x displayblockLddd[$\$CJOJPJQJaJtH || [xpro_fieldlabeldisabledMddd[$\$5B*OJPJQJ\phtH  [xpro_mandatorydisabled'Nddd-DM [$\$CJOJPJQJaJtH ZZ [x menu_listOddd[$\$CJOJPJQJaJtH ^^ [x menusectionPddd[$\$CJOJPJQJaJtH  [x menu_headPQd$d%d&d'dNOPQ'5B*CJOJ PJQJ \aJphtH V"V [xftbRZddd[$\$^ZCJOJPJQJaJtH `2` [x tagcontainerSddd[$\$CJOJPJQJaJtH VBV [xtagmenuTddd[$\$CJOJPJQJaJtH `R` [x emailtagmenuUddd[$\$CJOJPJQJaJtH xbx [xemailsubjectpanel#Vd<d\$]^CJOJPJQJaJtH r [xanthem_menu_headPWd$d%d&d'dNOPQ'5B*CJOJ PJQJ \aJphtH ^^ [x menu_bodyXddd[$\$<CJOJPJQJaJtH ~~ [xemaileditorupbutton&Yddd[$\$]^CJOJPJQJaJtH  [xemaileditordownbutton&Zddd[$\$]^CJOJPJQJaJtH xx [xkeywordreadonly'[ddd-DM [$\$CJOJPJQJaJtH pp [x keywordedit'\ddd-DM [$\$CJOJPJQJaJtH ~~ [xinvoicetagelements']ddd-DM [$\$CJOJPJQJaJtH  [xpurchaseordertagelements'^ddd-DM [$\$CJOJPJQJaJtH  [xrequisitiontagelementsk_ddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH  [x requisitiontagelementsnonorderedk`ddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH vv [xemaileditoritemcolumnaddd9D[$\$CJOJPJQJaJtH " [xemaileditoritemcolumnnonorderedbddd9D[$\$CJOJPJQJaJtH 2 [xemaileditorcheckboxescolumn c$ddd9D[$\$a$CJOJPJQJaJtH vBv [xemaileditorarrowscolumndddd[$\$CJOJPJQJaJtH fRf [x priorityimageeddd9D[$\$CJOJPJQJaJtH \b\ [xlabelsfKddd[$\$]KCJOJPJQJaJtH frf [x usecsschk"gKddd9D[$\$]KCJOJPJQJaJtH jj [x usecsslabel"hKddd9D[$\$]KCJOJPJQJaJtH bb [xlabel&iKddd[$\$]^KCJOJPJQJaJtH  [x csstextboxxjK<dd$d%d&d'd-D`M NOPQ\$]K^<!B*CJOJPJQJaJphtH  [xnotifyVk$d$d%d &d 'd NO P Q a$$<B*CJOJPJQJaJphtH VV [xmenurowlddd[$\$CJOJPJQJaJtH ff [x wfmenutextmddd[$\$!B* CJOJPJQJaJphntH xx [xwfmenutextheadernddd[$\$'5B* CJOJPJQJ\aJphntH dd [xwfmenustartendoddd[$\$CJOJPJQJaJtH ^^ [x wfmenuhleftpddd[$\$CJOJPJQJaJtH ll [x wfmenuhmiddleqddd[$\$!B* CJOJPJQJaJphBtH t"t [xwftoptabhighlightrddd[$\$!B*CJOJPJQJaJphtH `2` [x wfmenuhrightsddd[$\$CJOJPJQJaJtH ^B^ [x wfmenuslefttddd[$\$CJOJPJQJaJtH lRl [x wfmenusmiddleuddd[$\$!B* CJOJPJQJaJphntH `b` [x wfmenusrightvddd[$\$CJOJPJQJaJtH r [x wfpropertyboxdwd$d%d&d'dNOPQ]^CJOJPJQJaJtH vv [xwfpropertytitlexddd[$\$'5B* CJOJPJQJ\aJphntH jj [xwfribbon'yddd&dP[$\$CJOJPJQJaJtH  [xwfribbonsectionZzddd$d%d&d'dNOPQ[$\$CJOJPJQJaJtH ~~ [xwfribbonsubsectionhighlight{ddd[$\$CJOJPJQJaJtH  [xwfribbonbutton'|ddd-D`M [$\$!B* CJOJPJQJaJphntH ZZ [x rndtabtop}ddd[$\$CJOJPJQJaJtH dd [xrndtabtopright~ddd[$\$CJOJPJQJaJtH \\ [x rndtableftddd[$\$CJOJPJQJaJtH ^^ [x rndtabrightddd[$\$CJOJPJQJaJtH hh [xrndtabbottomleftddd[$\$CJOJPJQJaJtH j"j [xrndtabbottomrightddd[$\$CJOJPJQJaJtH Z2Z [xreqitemddd9D[$\$CJOJPJQJaJtH B [x submenunavkddd$d%d&d'd-DM NOPQ[$\$CJOJPJQJaJtH nRn [xstatementsubheadddd[$\$5CJOJPJQJ\aJtH b [xwfribbonselectboxZddd$d%d&d'dNOPQ[$\$CJOJPJQJaJtH \r\ [x wfclassifyddd[$\$CJOJPJQJaJtH hh [xwfclassifyexpandddd[$\$CJOJPJQJaJtH dd [xwfclassifycodeddd[$\$CJOJPJQJaJtH ZZ [x separatorddd[$\$CJOJPJQJaJtH ff [xemaileditoreditddd[$\$CJOJPJQJaJtH ff [x separator1ddd[$\$!B*CJOJPJQJaJphtH xx [xemaileditoredit1&ddd[$\$]^CJOJPJQJaJtH x\x[x0 z-Top of Form#$d&dPa$<CJOJPJQJ^JaJtH \/\ [x0z-Top of Form Char<CJOJPJQJ^JaJtH B/B [xpro_mandatory1 q B/B [xpro_mandatory2 q B/!B [xpro_hiddenlabel1 <~]~[x0z-Bottom of Form#$d$dNa$<CJOJPJQJ^JaJtH b/Ab [x0z-Bottom of Form Char<CJOJPJQJ^JaJtH @& Q@ [xFootnote ReferenceH*C [x Table Grid27:V0 dOJPJQJ^Jb/rb [xDefault 7$8$H$-B*CJOJQJ^J_HaJmH phsH tH J/J <[x0 Body 5 CharCJOJPJQJ^JaJtH L/L [x0 Level 5 CharCJOJPJQJ^JaJtH LjqrL [x0Comment Subject5CJ\aJb/b [x0Comment Subject Char"5CJOJPJQJ\^JaJtH T T[x0Revision(CJOJPJQJ^J_HaJmH sH tH PK![Content_Types].xmlN0EH-J@%ǎǢ|ș$زULTB l,3;rØJB+$G]7O٭VvnB`2ǃ,!"E3p#9GQd; H xuv 0F[,F᚜K sO'3w #vfSVbsؠyX p5veuw 1z@ l,i!b I jZ2|9L$Z15xl.(zm${d:\@'23œln$^-@^i?D&|#td!6lġB"&63yy@t!HjpU*yeXry3~{s:FXI O5Y[Y!}S˪.7bd|n]671. tn/w/+[t6}PsںsL. J;̊iN $AI)t2 Lmx:(}\-i*xQCJuWl'QyI@ھ m2DBAR4 w¢naQ`ԲɁ W=0#xBdT/.3-F>bYL%׭˓KK 6HhfPQ=h)GBms]_Ԡ'CZѨys v@c])h7Jهic?FS.NP$ e&\Ӏ+I "'%QÕ@c![paAV.9Hd<ӮHVX*%A{Yr Aբ pxSL9":3U5U NC(p%u@;[d`4)]t#9M4W=P5*f̰lk<_X-C wT%Ժ}B% Y,] A̠&oʰŨ; \lc`|,bUvPK! ѐ'theme/theme/_rels/themeManager.xml.relsM 0wooӺ&݈Э5 6?$Q ,.aic21h:qm@RN;d`o7gK(M&$R(.1r'JЊT8V"AȻHu}|$b{P8g/]QAsم(#L[PK-![Content_Types].xmlPK-!֧6 0_rels/.relsPK-!kytheme/theme/themeManager.xmlPK-!R%theme/theme/theme1.xmlPK-! ѐ' theme/theme/_rels/themeManager.xml.relsPK] f  [`{G "#%4(p)*./014=7>L@BH_JKMzO Q TtVY$^_b8eKkmortv x}{}ՁM$ي=^smJ]+h3Jtjlpy~   #&+/15:?DHJQX^behlqux| _ & I i /Rf![+ uC}Pc~ekn """##%''G)j))*=***D,J, ..////112244787999y<<d=j= >>@2@yBBEFF5H6HYJZJKLM%MuOOP Q1QT+WjWmWZK[\\r^^__bceeghihjkklm,nGoorrstuvvvw xj{{V}}X~ۀρAG^ˆ#ÊƌnjxzȐay ʤˤԫ -G}fikǽjl,4LTpx20Q|kmnoqrstuvwxz{|}   !"$%'()*,-.02346789;<=>@ABCEFGIKLMNOPRSTUVWYZ[\]_`acdfgijkmnoprstvwyz{}~&'J'DXX !8@0(  B S  ? _Toc363636239 _Ref414174904 _Ref414174935 _Ref414173982 _Ref413187494 _Ref413197308 _Ref414174216 _Hlt364249780 _Hlt364249781 _Ref414174294 _Ref414174481 _Ref414174590 _Ref414174637_oZv v j[@@ 4nvo-1p$q$NsWsprsuvxy{|@Dhj$$;;<<bbddyj~jprsuvxy{|33333333''''MsNs׀׀؀؀jj +.KKo10Oſop}#g8R/IIS9BCDEg\TtvLM2;m Bp\&!Fp&0A#&XHd$Ng~(L}2K\3x3Vb);X5'|?,I?Bj QNN{zvOTtoSF.U.%P&Xc5ZᎥ:?b <mc4:"tdQf.er\drs}LYqtTtz\p{0m B~6ɐm* ^` 56789:;<>*H*S*TXY(()^`.pLp^p`L.@ @ ^@ `.^`.L^`L.^`.^`.PLP^P`L.2 ^` 56789:;<>*H*OJQJS*TXY(2 ^` 56789:;<>*H*OJQJS*TXY(2 ; ^ `;56789:;<>*H*OJQJS*TXY(2J ;J ^J `;56789:;<>*H*OJQJS*TXY(* ; ^ `;56789:;<>*H*S*TXY( Not Defined* ; ^ `;56789:;<>*H*S*TXY( Not Defined* ; ^ `;56789:;<>*H*S*TXY( Not Defined*56789:;<>*H*S*TXY( Not Defined*56789:;<>*H*S*TXY( Not Defined7 ^` 56789:;<>*H*S*TXY(o(hH9.17 ^` 56789:;<>*H*S*TXY(o(hH9.17 ^` 56789:;<>*H*S*TXY(o(hH..7 ; ^ `;56789:;<>*H*S*TXY(o(hH()7 ; ^ `;56789:;<>*H*S*TXY(o(hH7 ; ^ `;56789:;<>*H*S*TXY(o(hH7 ; ^ `;56789:;<>*H*S*TXY(o(hH7^`56789:;<>*H*S*TXY(o(hH Not Defined7^`56789:;<>*H*S*TXY(o(hH Not Defined ^`OJQJo( ^`OJQJo( p^p`OJ QJ o(o @ ^@ `OJ QJ o( ^`OJQJo( ^`OJ QJ o(o ^`OJ QJ o( ^`OJQJo( P^P`OJ QJ o(o  ^ `OJ QJ o( ^`o(hH ^`hH. pL^p`LhH. @ ^@ `hH. ^`hH. L^`LhH. ^`hH. ^`hH. PL^P`LhH.h^h`5o(hH. h^h`o(hH. 0^`0o(hH. 0^`0o(hH... 8^8`o(hH .... 8^8`o(hH ..... `^``o(hH ......  `^``o(hH.......  ^`o(hH........h^`OJQJo(hHh^`OJ QJ ^J o(hHohp^p`OJ QJ o(hHh@ ^@ `OJQJo(hHh^`OJ QJ ^J o(hHoh^`OJ QJ o(hHh^`OJQJo(hHh^`OJ QJ ^J o(hHohP^P`OJ QJ o(hH/ ^` 56>*B*CJOJQJ\]^JaJo(ph ^` 56>*B*^Jph./^`56>*B*CJOJQJ\]^JaJo(ph../ < ^ `<56>*B*CJOJQJ\]^JaJo(ph()/ < ^ `<56>*B*CJOJQJ\]^JaJo(ph/ < ^ `<56>*B*CJOJQJ\]^JaJo(ph/ < ^ `<56>*B*CJOJQJ\]^JaJo(ph/56>*B*CJOJQJ\]^JaJo(ph (not defined)/56>*B*CJOJQJ\]^JaJo(ph (not defined)h^h`5o(. 8^8`hH. L^`LhH.  ^ `hH.  ^ `hH. xL^x`LhH. H^H`hH. ^`hH. L^`LhH. ^`OJQJo(^`OJ QJ ^J o(o pp^p`OJ QJ o( @ @ ^@ `OJQJo(^`OJ QJ ^J o(o ^`OJ QJ o( ^`OJQJo(^`OJ QJ ^J o(o PP^P`OJ QJ o(^`o(. ^`hH. pL^p`LhH. @ ^@ `hH. ^`hH. L^`LhH. ^`hH. ^`hH. PL^P`LhH.h^`OJQJo(hHh^`OJ QJ ^J o(hHohp^p`OJ QJ o(hHh@ ^@ `OJQJo(hHh^`OJ QJ ^J o(hHoh^`OJ QJ o(hHh^`OJQJo(hHh^`OJ QJ ^J o(hHohP^P`OJ QJ o(hHh^`OJQJo(hHh^`OJ QJ ^J o(hHohp^p`OJ QJ o(hHh@ ^@ `OJQJo(hHh^`OJ QJ ^J o(hHoh^`OJ QJ o(hHh^`OJQJo(hHh^`OJ QJ ^J o(hHohP^P`OJ QJ o(hHh^h`o(h^h`o(.0^`0o(..0^`0o(... 8^8`o( .... 8^8`o( ..... `^``o( ...... `^``o(....... ^`o(........* ^` 56789:;<>*H*S*TXY(()^`.pLp^p`L.@ @ ^@ `.^`.L^`L.^`.^`.PLP^P`L. h^h`o(hH. h^h`o(hH.. 0^`0o(hH. 0^`0o(hH.... 8^8`o(hH ..... 8^8`o(hH ...... `^``o(hH.......  `^``o(hH........  ^`o(hH......... h^h`o(hH h^h`o(hH. 0^`0o(hH. 0^`0o(hH... 8^8`o(hH .... 8^8`o(hH ..... `^``o(hH ......  `^``o(hH.......  ^`o(hH........h^`OJQJo(hHh^`OJ QJ ^J o(hHohp^p`OJ QJ o(hHh@ ^@ `OJQJo(hHh^`OJ QJ ^J o(hHoh^`OJ QJ o(hHh^`OJQJo(hHh^`OJ QJ ^J o(hHohP^P`OJ QJ o(hH ^`OJQJo(^`OJ QJ ^J o(o pp^p`OJ QJ o( @ @ ^@ `OJQJo(^`OJ QJ ^J o(o ^`OJ QJ o( ^`OJQJo(^`OJ QJ ^J o(o PP^P`OJ QJ o( hh^h`OJQJo(88^8`OJ QJ ^J o(o ^`OJ QJ o(   ^ `OJQJo(  ^ `OJ QJ ^J o(o xx^x`OJ QJ o( HH^H`OJQJo(^`OJ QJ ^J o(o ^`OJ QJ o(/ ^` 56>*B*CJOJQJ\]^JaJo(ph ^` 56>*B*^Jph./^`56>*B*CJOJQJ\]^JaJo(ph../ < ^ `<56>*B*CJOJQJ\]^JaJo(ph()/ < ^ `<56>*B*CJOJQJ\]^JaJo(ph/ < ^ `<56>*B*CJOJQJ\]^JaJo(ph/ < ^ `<56>*B*CJOJQJ\]^JaJo(ph/56>*B*CJOJQJ\]^JaJo(ph (not defined)/56>*B*CJOJQJ\]^JaJo(ph (not defined)h^h`5o(hH6. h^h`o(hH. 0^`0o(hH2.2 0^`0o(hH... 8^8`o(hH .... 8^8`o(hH ..... `^``o(hH ......  `^``o(hH.......  ^`o(hH........h^h`o(^`o(.0^`0o(..!0^!`0o(... ^`o( ....  ^ `o( ..... B `^B ``o( ...... ] `^] ``o(....... ^`o(........h^`OJQJo(hHh^`OJ QJ ^J o(hHohp^p`OJ QJ o(hHh@ ^@ `OJQJo(hHh^`OJ QJ ^J o(hHoh^`OJ QJ o(hHh^`OJQJo(hHh^`OJ QJ ^J o(hHohP^P`OJ QJ o(hHhh^h`OJQJo(hHh8^8`OJ QJ ^J o(hHoh^`OJ QJ o(hHh ^ `OJQJo(hHh ^ `OJ QJ ^J o(hHohx^x`OJ QJ o(hHhH^H`OJQJo(hHh^`OJ QJ ^J o(hHoh^`OJ QJ o(hHh^h`o(h^h`o(.0^`0o(..0^`0o(... 8^8`o( .... 8^8`o( ..... `^``o( ...... `^``o(....... ^`o(........8^8`o(.^`. L^ `L. ^ `.x^x`.HL^H`L.^`.^`.L^`L. ^`OJQJo(^`OJ QJ ^J o(o pp^p`OJ QJ o( @ @ ^@ `OJQJo(^`OJ QJ ^J o(o ^`OJ QJ o( ^`OJQJo(^`OJ QJ ^J o(o PP^P`OJ QJ o( ^`OJQJo( p^p`OJ QJ o(o @ ^@ `OJ QJ o( ^`OJQJo( ^`OJ QJ o(o ^`OJ QJ o( ^`OJQJo( P^P`OJ QJ o(o  ^ `OJ QJ o(h^`OJQJo(hHh^`OJ QJ ^J o(hHohp^p`OJ QJ o(hHh@ ^@ `OJQJo(hHh^`OJ QJ ^J o(hHoh^`OJ QJ o(hHh^`OJQJo(hHh^`OJ QJ ^J o(hHohP^P`OJ QJ o(hH ^`OJQJo(^`OJ QJ ^J o(o pp^p`OJ QJ o( @ @ ^@ `OJQJo(^`OJ QJ ^J o(o ^`OJ QJ o( ^`OJQJo(^`OJ QJ ^J o(o PP^P`OJ QJ o(/ ^` 56>*B*CJOJQJ\]^JaJo(ph ^` 56>*B*^Jph./^`56>*B*CJOJQJ\]^JaJo(ph../ < ^ `<56>*B*CJOJQJ\]^JaJo(ph()/ < ^ `<56>*B*CJOJQJ\]^JaJo(ph/ < ^ `<56>*B*CJOJQJ\]^JaJo(ph/ < ^ `<56>*B*CJOJQJ\]^JaJo(ph/56>*B*CJOJQJ\]^JaJo(ph (not defined)/56>*B*CJOJQJ\]^JaJo(ph (not defined) ^`OJQJo(^`OJ QJ ^J o(o pp^p`OJ QJ o( @ @ ^@ `OJQJo(^`OJ QJ ^J o(o ^`OJ QJ o( ^`OJQJo(^`OJ QJ ^J o(o PP^P`OJ QJ o(^`6)^`.pLp^p`L.@ @ ^@ `.^`.L^`L.^`.^`.PLP^P`L.)g\\ rHd$&XzvOYqt B~z\p{;m drsI?BtdQNB` &0A#5'|?<mcZ] Qfg?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~      !"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~      !"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~Root Entry FpXh߼Data 1TableOWordDocument2fSummaryInformation(DocumentSummaryInformation8CompObjr  F Microsoft Word 97-2003 Document MSWordDocWord.Document.89q