Description of the goods or services required
A new bodyshop is required to assemble an SUV in St. Athan Wales. This will be a “turnkey solution” to include; equipment to assemble a bonded underframe, a curing oven, framing stations for a number of bonded BiW panels & a closure fit line. This system must cycle at a 30 minute TAKT.
-
AML requires the facility to be capable of building a multi model sequence and NOT be constrained to batch building.
The vendor must demonstrate an experience in delivering, but not limited to:
• Turnkey assembly lines of a similar size & nature
• Automated assembly fixtures
• Integration of 10+ robotic cells
• Integration of adhesive application cells
• Large scale adhesive curing systems
• Large scale controls projects
• Conveyor systems
• Large scale product handling equipment
-
It is estimated that the installation will be over a 12 month period between July 2017 and July 2018
NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at http://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=64715. |