Appointment of contractor for the design and delivery of earthworks for the GCRE

  • Contract award date: 13 June 2022

Contract details


ID:
122124
OCID:
ocds-kuma6s-114475
Contract type:
Works
Procedure type:
Open
Contract award notice ref:
JUN401599
Internal ref:
GCRE-E-01
Contact catergory:
C - Local contract let on behalf of one buyer
Buyer:
GCRE Ltd
Primary CPV code:
N/a
Additional CPV code(s):
Is framework:
No
Carbon reduction plan:
Options:
Description:
GCRE Limited is looking to procure suitably qualified earthworks contractor with experience of designing and carrying out large scale earthworks projects to facilitate the subsequent design and construction of the Global Centre for Rail Excellence (GCRE). GCRE is to be constructed at the site of the former Nant Helen opencast coal mine site along with ancillary earthworks at the Onllwyn Washery. The completed centre will have two rail testing loops, rail sidings, buildings and other infrastructure. The earthworks which are subject to this procurement provide the foundation for that later infrastructure and are likely to comprise approximately 3 Million m³ of earth movement including (but not limited to) vegetation stripping, soil stripping, overburden excavation and placement to a design specification, associated selection of materials, overburden removal and placement in landscape balancing areas, soil spreading and final rehabilitation of landscaped profiles. The successful contractor is also required to provide temporary drainage during the construction phase together with the installation of permanent drainage during and on completion of construction on a two stage basis: 1 – to develop the design of the earthworks so as to enable the contractor to provide a priced proposal for the contractor to complete the design and carry out the construction of the earthworks at Stage 2 to meet GCRE Limited's requirements (Stage 2 Proposal). During Stage 1, the contractor may also be instructed to design and carry out preliminary site activities such as vegetation stripping works. 2 – following acceptance by GCRE Limited of the successful contractor's Stage 2 Proposal, the successful contractor will proceed to finalise the design of, and carry out, the construction of the earthworks in accordance with the Stage 2 Proposal.
Purchasing team:
N/a

Contract dates


Date awarded:
13 June 2022
Start date:
08 June 2022
End date:
08 December 2024

Contract extensions


Extended contract end date:
-
Max extension options available:
6 (months)

Additional information


Additional information:

Contact details


Contract name:
Rob Thompson
Contract email:
rob.thompson@gcre.wales

Successful suppliers


Below is a list of all successful suppliers for this contract. Suppliers can also be selected for specific LOTS (if applicable) and may also have one or more subcontractors which can be added via the Subcontractors tab.

Lots


Below are the details of the lots that the contract has been divided into. To view the suppliers that have been awarded each of the lots, go to the Suppliers section.

No lots have been added for this contract.

Suppliers


Below are the details of the successful suppliers for this contract.

Lot number Name Town Post code DUNS number Value
Walters Plant Hire Limited Aberdare CF119UL 578921124 0

Collaborating buyers


Listed below are the buyers collaborating on this contract.

No collaborating buyers to display.

Call Offs


Contract Call Offs.

This contract does not use call offs.