Total quantity or scope of tender
Phase 1 is split into 3 sections.
Ground floor Lecture theatre, A16 – works to convert a traditional front facing lecture theatre into a group learning lecture theatre. Works to be undertaken include new group seating and table, creation of platforms over existing racking. New floor finishes. Redecoration
including ceiling. Alterations to air handling and new sound absorbing
wall panels.
Kitchen preparation area, B Floor – removal of all industrial kitchen
equipment, servery and conversion into meeting rooms and a
commuter kitchen. Works include removal of all equipment and wall
coverings. Reline walls and decorate. New ceilings throughout.
Creation of stud and glass partitions. Alterations to air handling system. alterations to small power, lighting, network and fire detection systems.
Provision of fixed units in commuter kitchen. New flooring throughout.
Provision of moss walls. New structural window openings.
Staff work area, E Floor – removal of existing offices complete. Provision of glass partition and associated structural works. Door access system.
New flooring throughout. Redecoration throughout. Alterations to air
handling system. Alterations to small power, lighting, network and fire detection systems
|