Total quantity or scope of tender
Scope of Works:
• Toilet Refurbishment:
o Full strip-out of four existing toilet rooms
o Installation of new sanitaryware and associated plumbing throughout
o Supply and installation of 4 modular toilet cubicle doors, including frames and fittings
• Plumbing Works:
o Replacement of all WCs, basins, taps, and associated pipework
o Removal and disposal of all existing plumbing fixtures
• Electrical Works:
o Upgrade and replacement of electric hand dryers, light fittings, and switches
o Ensure all installations comply with current electrical safety regulations
• Joinery and Fire Doors:
o Supply and installation of new fire-rated internal doors for each toilet area
o Each of the four toilet areas must be fitted with internally styled, fire-resistant doors, including self-closing devices
o Installation of all necessary ironmongery (locks, handles, signage)
• Walls and Ceilings:
o Decoration of the upper walls and ceilings in all four toilet areas
o Installation of half-height PVC wall panelling around all toilet and basin areas
• General:
o Supply and installation of all materials required for the works
o Removal and disposal of all redundant materials and waste from site
o Works to be carried out with minimal disruption to the building and its users
________________________________________
|