Public Realm / Landscaping Works - Site 1, Shawfield, Glasgow.

  • First published: 04 April 2014
  • Last modified: 04 April 2014
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
Published by:
Clyde Gateway Developments Ltd
Authority ID:
AA20170
Publication date:
04 April 2014
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The works will involve the construction of high quality public realm and landscaping in the Shawfield area of Glasgow. The key components of the contract will include:

Construction of new pedestrian and cycling thoroughfares.

Construction of public realm plazas and areas of hardstandings.

Construction of a new riverside walkway and seating terraces.

Construction of SUDS drainage including a new pond and associated swales.

Planting of formal tree avenues, structure woodland, ornamental shrubs and ground cover, and turfing / seeding.

The implementation of street furniture items.

The implementation of lighting and electrical works including a new 11kv substation.

The implementation of other services such as water and telecoms infrastructure.

An extensive programme of ground remediation works and the creation of development platforms will be progressed by others in advance of the public realm works noted above. The public realm contractor will be expected to liaise with the remediation contract personnel and programme his works accordingly.

The contractor will note that a new pedestrian bridge over the River Clyde is also to be constructed by others in advance of the public realm contract and liaison is also likely to be required between the bridge contractor and the public realm contractor.

The public realm contractor will also be required to take cognisance of an Invasive Species strategy and protected species strategy although mitigation works are to be undertaken by other parties.

A significant component of the works will be expected to be complete in advance of the 2014 Commonwealth Games.

Two new key pedestrian and cycling thoroughfares are proposed to form a public realm and landscape framework for future development: The first thoroughfare will include a 300m long and 4.7m wide pedestrian and cycling path linking the new pedestrian bridge and the junction of Glasgow Road / Rutherlgen Road. The second thoroughfare will include a 375m long and 4.7m wide pedestrian and cycling riverside path linking the same bridge with Shawfield Road. These main thoroughfares will be constructed with a mix of high quality stone and / or concrete paving, as well as coloured asphalt. The thoroughfares will be capable of light vehicle loading to permit maintenance access.

The riverside path will be constructed on the slopes of the riverbank. Works to the riverbank will also incorporate a new stepped amphitheatre and terraces as well as a series of secondary paths.

There is requirement to construct a 25nr space car park and associated road access infrastructure. Other pedestrian hardstanding areas will be constructed in various materials including concrete / stone paving, asphalt, self-binding aggregate, and gravel.

In association with the proposed hard public realm construction there is a requirement for the contractor to deliver extensive areas of planting. This will include formal tree avenue planting with Extra Heavy Standards as well as extensive woodland structure planting on the riverbank. There will be a requirement to seed and / or turf large areas of amenity grass and establish wildflower meadows on development platforms. There will be a requirement to implement riparian planting in association with SUDS ponds and swales. All planting will have to be established on imported topsoil. The Contractor will be required to establish and maintain the landscaping works for a period of three years post completion.

The contractor will be expected to implement street furniture items such as benches, litter bins, bollards and lighting columns, as well as fencing and hoarding.

In addition to lighting there will be a requirement to coordinate and implement various items of utility infrastructure including a new 11kv substation, electrical cabling, CCTV, water infrastructure, telecoms cabling etc. The coordination will include liaison with u

Full notice text

CONTRACT AWARD NOTICE – OFFICIAL JOURNAL

Section I: Contracting Authority

I.1)

Name, Address and Contact Point(s)


Clyde Gateway Developments Ltd

Bridgeton Cross, Bridgeton

Glasgow

G40 1BN

UK

Mr Martin McKay

+44 1412761582

martin.mckay@clydegateway.com


http://www.clydegateway.com

http://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA11703

I.2)

Type of contracting Authority and Main Activity or Activities

Checked box

Urban Regeneration Company

Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Checked box

Mixed use physical development linked to social and economic outcomes

No

Section II: Object of the Contract

II.1)

Description

II.1.1)

Title attributed to the contract by the contracting authority

Public Realm / Landscaping Works - Site 1, Shawfield, Glasgow.

II.1.2(a))

Type of works contract

Checked box Unchecked box
Unchecked box

II.1.2(b))

Type of supplies contract

II.1.2(c))

Type of service contract

II.1.2)

Main site or location of works, place of delivery or performance

The site is located in Shawfield near Rutherglen, Glasgow and is within land administered by South Lanarkshire Council. The site is bounded to the South by the M74, to the North by the River Clyde, to the Northwest by the B763 / A630 (Clyde Gateway Route), and to the East by the Dalmarnock to Rutherglen stretch of the Argyle line railway.


UKM38

II.1.3)

This notice involves a framework agreement

Unchecked box
Unchecked box

II.1.4)

Short description of the contract or purchase(s)

The works will involve the construction of high quality public realm and landscaping in the Shawfield area of Glasgow. The key components of the contract will include:

Construction of new pedestrian and cycling thoroughfares.

Construction of public realm plazas and areas of hardstandings.

Construction of a new riverside walkway and seating terraces.

Construction of SUDS drainage including a new pond and associated swales.

Planting of formal tree avenues, structure woodland, ornamental shrubs and ground cover, and turfing / seeding.

The implementation of street furniture items.

The implementation of lighting and electrical works including a new 11kv substation.

The implementation of other services such as water and telecoms infrastructure.

An extensive programme of ground remediation works and the creation of development platforms will be progressed by others in advance of the public realm works noted above. The public realm contractor will be expected to liaise with the remediation contract personnel and programme his works accordingly.

The contractor will note that a new pedestrian bridge over the River Clyde is also to be constructed by others in advance of the public realm contract and liaison is also likely to be required between the bridge contractor and the public realm contractor.

The public realm contractor will also be required to take cognisance of an Invasive Species strategy and protected species strategy although mitigation works are to be undertaken by other parties.

A significant component of the works will be expected to be complete in advance of the 2014 Commonwealth Games.

Two new key pedestrian and cycling thoroughfares are proposed to form a public realm and landscape framework for future development: The first thoroughfare will include a 300m long and 4.7m wide pedestrian and cycling path linking the new pedestrian bridge and the junction of Glasgow Road / Rutherlgen Road. The second thoroughfare will include a 375m long and 4.7m wide pedestrian and cycling riverside path linking the same bridge with Shawfield Road. These main thoroughfares will be constructed with a mix of high quality stone and / or concrete paving, as well as coloured asphalt. The thoroughfares will be capable of light vehicle loading to permit maintenance access.

The riverside path will be constructed on the slopes of the riverbank. Works to the riverbank will also incorporate a new stepped amphitheatre and terraces as well as a series of secondary paths.

There is requirement to construct a 25nr space car park and associated road access infrastructure. Other pedestrian hardstanding areas will be constructed in various materials including concrete / stone paving, asphalt, self-binding aggregate, and gravel.

In association with the proposed hard public realm construction there is a requirement for the contractor to deliver extensive areas of planting. This will include formal tree avenue planting with Extra Heavy Standards as well as extensive woodland structure planting on the riverbank. There will be a requirement to seed and / or turf large areas of amenity grass and establish wildflower meadows on development platforms. There will be a requirement to implement riparian planting in association with SUDS ponds and swales. All planting will have to be established on imported topsoil. The Contractor will be required to establish and maintain the landscaping works for a period of three years post completion.

The contractor will be expected to implement street furniture items such as benches, litter bins, bollards and lighting columns, as well as fencing and hoarding.

In addition to lighting there will be a requirement to coordinate and implement various items of utility infrastructure including a new 11kv substation, electrical cabling, CCTV, water infrastructure, telecoms cabling etc. The coordination will include liaison with utility providers.

It should be noted that the highest standards of quality and workmanship will be expected to deliver this high profile contract.

II.1.5)

Common Procurement Vocabulary (CPV)

45200000
45112700
65000000
45220000
45232450

II.1.6)

Contract covered by the government procurement agreement (GPA)

Yes

II.2)

Total final value of the contract(s)

II.2.1)

Total final value of the contract(s)

 2 072 433   GBP     

Section IV: Procedure

IV.1)

Type of procedure

IV.1.1)

Type of procedure

IV.2)

Award criteria

IV.2.1)

Award criteria

Unchecked box
Checked box
Price 80
Quality 20

IV.2.2)

An electronic auction has been used

No

IV.3)

Administrative information

IV.3.1)

File reference number attributed by the contracting authority

IV.3.2)

Previous publication(s) concerning the same contract


2013/S 124-211974 28-06-2013

Other previous publications

Section V: Award of contract

V.1)

Date of contract award:

 23-12-2013

V.2)

Numbers of offers received:

4

V.3)

Name and address of economic operator to whom the contract has been awarded


R J Mcleod (Contractors) Ltd

2411 London Road

Glasgow

G32 8XT

UK



www.rjmcleod.co.uk

V.4)

Information on value of contract

 3 055 100 GBP 

 2 072 433 GBP 

1

V.5)

The contract is likely to be subcontracted

No

Short description of the value/proportion of the contract to be subcontracted

Section VI: Complementary Information

VI.1)

Contract related to a project and/or programme financed by community funds?

Yes



National Business District Shawfield: LUPS/ERDF/2012/6/3/0027

VI.2)

Additional Information

(SC Ref:300197).

VI.3)

Procedures for appeal

VI.3.1)

Body responsible for appeal procedures










Body responsible for mediation procedures










VI.3.2)

Lodging of appeals

VI.3.3)

Service from which information about the lodging of appeals may be obtained










VI.4)

Dispatch date of this Notice

 31-03-2014

Coding

Commodity categories

ID Title Parent category
45232450 Drainage construction works Ancillary works for pipelines and cables
45220000 Engineering works and construction works Works for complete or part construction and civil engineering work
45112700 Landscaping work Excavating and earthmoving work
65000000 Public utilities Other Services
45200000 Works for complete or part construction and civil engineering work Construction work

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
martin.mckay@clydegateway.com
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.