Abstract
The project is to be designed by the Client's appointed design team. The form of contract will be a JCT Standard Building Contract with Approximate Quantities (2011) with amendments.
The project comprises of the construction of a new sports centre building which will comprise of
— New 8 court sports hall which will be constructed in line with Sport England design guidance,
— A 100 station fitness suite,
— 25 m x 13 m swimming pool and health suite with sauna and steam rooms,
— Male and female changing facilities,
— Cafe and lounge area,
— Reception area,
— Administration and Stores.
The project is to be designed by the client's appointed design team. A separate enabling works project will take place in advance of the commencement of the shell works contract. The enabling works will comprise of foundations and substructure works.
The successful contractor for the shell works will undertake the construction of the shell elements of the building (External walls, masonry, structural frame, wall systems and cladding systems, window and curtain walling systems, roof systems, upper floors and stairs construction, screeds, some first fix mechanical and electrical installation works which would benefit from being integrated into the shell of the building and swimming pool structure. The following work package will be subject to Contractor Design;
(a) Steelwork connections.
(b) Precast concrete stairs.
(c) Edge protection.
(d) Standing seam roofing system including insulation, upstands, abutments, fascias, verges, edge details and all detailing, etc.
(e) Single ply membrane roofing system including insulation, upstands, abutments, fascias, verges, edge details and all detailing, etc.
(f) Brown roofing system including insulation, upstands, abutments, fascias, verges, edge details and all detailing, etc.
(g) Precast beam and block flooring / decking.
(h) General roof drainage system; rainwater gutters and downpipes.
(i) Syphonic rainwater drainage system.
(j) Fall arrest system / walkways to roof.
(k) External wall cladding system.
(l) Window / curtain walling installation.
(m) Swimming pool installation.
(n) Fire protection to steelwork.
(o) Air tightness detailing between different forms of construction.
(p) Initial Mechanical and Electrical Services Installations.