CONTRACT NOTICE - UTILITIES
|
Section I: Contracting Entity
|
I.1)
|
Name, Address and Contact Point(s)
|
|
Eurotunnel |
UK Terminal, Ashford Road, Kent |
Folkestone |
CT18 8XX |
UK |
Mr Keith Seddon, Mrs Tracy MacDonald |
+44 1303282764/+44 1303282762 |
keith.seddon@eurotunnel.com |
+44 1303282791 |
www.eurotunnel.com
|
|
|
|
|
|
|
|
|
|
I.2)
|
Main activity or activities of the contracting entity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section II: Object of the Contract
|
II.1)
|
Description
|
II.1.1)
|
Title attributed to the contract by the contracting entity
Outline and Detailed Design of Infrastructure to achieve extra capacity on the Folkestone UK Terminal.
|
II.1.2(a))
|
Type of works contract
|
II.1.2(b))
|
Type of supplies contract
|
II.1.2(c))
|
Type of service contract27 |
II.1.2)
|
Site or location of works, place of delivery or performance
Eurotunnel UK Terminal Folkestone. NUTS Code UKJ4 |
II.1.3)
|
This notice involves
|
|
|
|
|
|
|
II.1.4)
|
Information on framework agreement (if applicable)
|
|
|
|
|
|
Number of participants to the framework agreement envisaged
|
|
Duration of the framework agreement
|
|
|
|
Estimated total value of purchases for the entire duration of the framework agreement
|
|
Frequency of the contracts to be awarded |
II.1.5)
|
Short description of the contract or purchase(s)
Outline Design (APS) and Detailed Design (APD) of Infrastructure to achieve extra capacity on the Folkestone UK Terminal for the following Lots:
Lot UK01: New Platforms on the UK Terminal at Folkestone,
Lot UK02: Overbridge Widening on the UK Terminal at Folkestone,
Lot UK03: Front Rake Allocation Area Widening on the UK Terminal.
|
II.1.6)
|
Common Procurement Vocabulary (CPV)
|
|
|
|
71000000 |
|
|
|
|
|
II.1.7)
|
Contract covered by the Government Procurement Agreement (GPA) |
II.1.8)
|
Division into lots Yes
|
|
|
|
|
|
|
II.1.9)
|
Will variants be accepted No |
II.2)
|
Quantity or Scope of the Contract
|
II.2.1)
|
Total quantity or scope
Lot UK01: New Platforms on the UK Terminal at Folkestone
Project Management mission for Outline and Detailed Design of additional platforms to achieve extra capacity.
Lot UK02: Overbridge Widening on the UK Terminal at Folkestone
Project Management mission for Outline and Detailed Design of the widening of the existing Overbridges to achieve extra capacity.
Lot UK03: Front Rake Allocation Area Widening on the UK Terminal
Project Management mission for Outline and Detailed Design of the widening of the Front Rake Allocation Lanes area to achieve extra capacity.
All lots include: civil engineering, HV and LV power supply, lighting, signage, video surveillance, access control, communications, fixed equipment and establishing dossiers for statutory compliance.
The work will include feasibility studies, traffic modelling, site investigation, cost estimates and detailed engineering design.
|
|
|
II.2.2)
|
Options
|
|
Provisional timetable for recourse to these options
|
|
Number of possible renewals
|
|
In the case of renewable contracts, estimated time frame for subsequent calls for competition:
|
Section III: Legal, Economic, Financial and Technical Information
|
III.1)
|
Conditions relating to the contract
|
III.1.1)
|
Deposits and guarantees required
Performance Guarantee.
|
III.1.2)
|
Main Terms of financing and payment and/or reference to the relevant provisions
Payment Terms 60 days from invoice date.
|
III.1.3)
|
Legal form to be taken by the grouping of suppliers, contractors or service providers to whom the contract is to be awarded
Registered companies or groups of companies (partnership / JV).
|
III.1.4)
|
Other particular conditions to which the performance of the contract is subject
|
III.2)
|
Conditions for Participation
|
III.2.1)
|
Personal situation of suppliers,contractors or service providers
Information of current status for membership of professional or trade bodies / registers.
|
III.2.2)
|
Economic and financial capacity
— company registration certificate,
— statement confirming no intention to file for bankruptcy,
— statement confirming you have satisfied all social and fiscal obligations for last 2 years,
— details of any court proceedings in last 5 years,
— certificates: quality, safety and environment certification,
— safety manual, frequency and seriousness rates of accidents in last 3 years,
— insurance certificate with amounts and risks warranted,
— turn over and results for the last 3 years,
— turn over and results for the last 3 years for above defined activity (see II.2.1),
— details of any subsidiary company or parent company,
— number of people employed,
— number of people for each lot,
— equipment, material, people and ability to provide the services,
— references for each activity (lot) in terms of client, description, location, value.
|
III.2.3)
|
Technical capacity
— relevant references in the respective domain of activity, Experience of similar contracts over the last 3 years,
— copies of professional certificates, statements, and competences, (Safety, Quality, environment etc.),
— workforce strength in the respective domain of activity,
— industrial and commercial profile of the Company.
|
III.2.4)
|
Reserved contracts
|
|
|
|
|
Section IV: Procedure
|
IV.1)
|
Type of Procedure
|
|
|
|
|
|
|
No |
|
IV.2)
|
Award Criteria
|
|
No
|
|
|
|
Yes
|
|
No
|
IV.2.2)
|
An electronic auction will be used No
|
IV.3) Administrative Information
|
IV.3.1)
|
Reference number attributed to the notice by the contracting entity
|
IV.3.2)
|
Previous publication concerning the same contract
|
|
|
|
Other previous publications
|
IV.3.3)
|
Conditions for obtaining contract document and additional documents
|
IV.3.4)
|
Time-limit for receipt of tenders or requests to participate 12-05-2017 |
IV.3.5)
|
Language or languages in which tenders or requests to participate can be drawn up
|
IV.3.6)
|
Minimum time frame during which the tenderer must maintain its tender
|
IV.3.7)
|
Conditions for opening tenders
|
|
|
|
|
Section VI: Complementary Information
|
VI.1)
|
Indicate whether this Procurement is a Recurrent one and the estimated timing for further notices to be published
|
VI.2)
|
Does the contract relate to a Project/Programme financed by Community Funds? No
|
VI.3)
|
Additional Information
Potential candidates must prove that they have the resources and capability to deliver this contract on time, within budget, and to meet the client (employer) requirements and expectations.
The contract issued may include Liquidated Damages. Details will be supplied in the tender documents.
|
VI.4)
|
Procedures for appeal
|
VI.4.1)
|
Body responsible for appeal procedures
Tribunal de grande instance de Lille |
|
Lille |
59034 |
FR |
|
+33 320783333 |
|
+33 320783452 |
|
|
Body responsible for mediation procedures
Tribunal de grande instance de Lille |
|
Lille |
59034 |
FR |
|
+33 320783333 |
|
+33 320783452 |
|
VI.4.2)
|
Lodging of appeals
|
VI.4.3)
|
Service from which information about the lodging of appeals may be obtained
Tribunal de grande instance de Lille |
|
Lille |
59034 |
FR |
|
+33 320783333 |
|
+33 320783452 |
|
VI.5)
|
Dispatch date of this Notice 22-04-2017 |
|
ANNEX B
Information About Lots
|
1
Lot UK01: New Platforms on the UK Terminal at Folkestone |
1)
|
Short Description
Project Management mission for Outline and Detailed Design of additional platforms to achieve extra capacity.
|
2)
|
Common Procurement Vocabulary (CPV)
|
|
|
|
71000000 |
|
|
|
|
|
3)
|
Quantity or scope
Lot includes: civil engineering, HV and LV power supply, lighting, signage, video surveillance, access control, communications, fixed equipment and establishing dossiers for statutory compliance.
The work will include feasibility studies, traffic modelling, site investigation, cost estimates and detailed engineering design.
|
4)
|
Indication about different contract dates
|
5)
|
Additional Information about lots
Lots can be awarded separately.
|
ANNEX B
Information About Lots
|
2
Lot UK02: Overbridge Widening on the UK Terminal at Folkestone |
1)
|
Short Description
Project Management mission for Outline and Detailed Design of the widening of the existing Overbridges to achieve extra capacity.
|
2)
|
Common Procurement Vocabulary (CPV)
|
|
|
|
71000000 |
|
|
|
|
|
3)
|
Quantity or scope
Lot includes: civil engineering, HV and LV power supply, lighting, signage, video surveillance, access control, communications, fixed equipment and establishing dossiers for statutory compliance.
The work will include feasibility studies, traffic modelling, site investigation, cost estimates and detailed engineering design.
|
4)
|
Indication about different contract dates
|
5)
|
Additional Information about lots
Lots can be awarded separately.
|
ANNEX B
Information About Lots
|
3
Lot UK03: Front Rake Allocation Area Widening on the UK Terminal |
1)
|
Short Description
Project Management mission for Outline and Detailed Design of the widening of the Front Rake Allocation Lanes area to achieve extra capacity.
|
2)
|
Common Procurement Vocabulary (CPV)
|
|
|
|
71000000 |
|
|
|
|
|
3)
|
Quantity or scope
Lot includes: civil engineering, HV and LV power supply, lighting, signage, video surveillance, access control, communications, fixed equipment and establishing dossiers for statutory compliance.
The work will include feasibility studies, traffic modelling, site investigation, cost estimates and detailed engineering design.
|
4)
|
Indication about different contract dates
|
5)
|
Additional Information about lots
Lots can be awarded separately.
|
|