Description of the contract
To supply & erect the following:
Foundations to the parlour & all associated building works
Concrete floors to the parlour area with non-slip carborundum finish
Block work to office, plant room etc.
To supply & fit UPVC doors & windows as required
Loft to all rooms
Fibreglass to walls - 450m2
External & internal concrete panel walls to the collecting yard & cow exit area.
Concrete floor to the collecting yard & cow exit with patterns press non slip finish
External concrete yards - 500m2
Slurry channels 1m x 1m with concrete slat tops to the full width of the building, and to connect to the existing reception pit.
Drainage to collect all wash down water. To be collected in 15,000 litre above ground tank and used for floor washing in the collecting yard & cow exit.
To supply & fit all ducting & water pipes (underground)
All gates for cow exit to form pens & external gates. All gates to be galvanised.
All HSE requirements.
All concrete area to be a minimum of 150mm deep with RC40 concrete
|