Demolition works at the recently acquired ex Warwick Chemicals site have been completed. As this site was once a chemical production site, process pipework was protruding through many of the buildings which now require re-cladding. These buildings include P1, G2, P6, P5, W4, P7.
The Port of Mostyn is seeking a qualified contractor to undertake the recladding and restoration of various buildings.
The scope includes but is not limited to:
- Site preparation and access management;
- Compliance with all relevant regulations;
- Removal and disposal of existing cladding and skylights which require replacing;
- Removal and disposal of damaged purlins, flashing & guttering;
- Supply and install new cladding and skylights;
- Supply and install new purlins, flashing & guttering;
- Supply and install new roller shutter doors to gable ends where required;
- Duration – 36 weeks.
The NEC4 Option A Contract standard terms and conditions will be used for this project.
|