You are invited to submit a tender for Phase 2 Roof Works at Cwrt Rawlin Primary School. The scope of the project is fully described in Appendix 1 but in summary the scope is:
• Pitched Roof Renewal
• All works must be carried out and completed over the Summer period between 20th July – 30th August 2026.
• Renewal of 8NO. existing roof lights.
• Allow for all necessary protection to existing roof areas not included and all internal furnishings, fixtures etc when replacing roof lights. Ensure rooms are cleaned on completion.
• Elevations to be fully scaffolded, must include fixed staircase and internal barrier to floor edge.
• Heras anti climb fencing to be erected around the complete perimeter of the scaffolding, a minimum 1-2m outside base of scaffolding, to provide complete segregation between works and building/school users.
• No Doorways, gates or walkways are to be blocked off during the execution of these works without the prior written consent of the contract administrator.
• To the areas noted on drawing number A001, provide and fit new lightweight roof covering including all new lead valleys, flashings, structural roof battens, breathable under cloak, and all necessary ventilation, etc.
• All to be as the attached technical specification or similar approved.
• Lead to be Code 5 to gutters and valleys with Code 4 to be used everywhere else.
• Form new lead collars and soakers where existing pipework penetrates the roof.
• Removal, safe storage, refit and commission of existing PV/solar panels. See
attached PV Panel fixing detail. Contractor must include for all new compatible brackets, rails, clasps etc.