Contract notice
Section I: Contracting
authority
I.1) Name and addresses
Homes England (the name adopted by the Homes and Communities Agency)
Aldgate Tower, 2 Leman Street
London
E1 8FA
UK
Contact person: Mr Carl Slater
Telephone: +44 7823354006
E-mail: carl.slater@aecom.com
NUTS: UKJ28
Internet address(es)
Main address: https://www.gov.uk/government/organisations/homes-england
Address of the buyer profile: https://www.gov.uk/government/organisations/homes-england
I.3) Communication
The procurement documents are available for unrestricted and full direct access, free of charge at:
https://procontract.due-north.com/login
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be sent electronically to:
https://procontract.due-north.com/login
I.4) Type of the contracting authority
National or federal agency/office
I.5) Main activity
Housing and community amenities
Section II: Object
II.1) Scope of the procurement
II.1.1) Title
Homes England — Western Bridge and Link Road
Reference number: DN425510
II.1.2) Main CPV code
65000000
II.1.3) Type of contract
Works
II.1.4) Short description
This work package is the second infrastructure contract package to be let by Homes England for the Northern Arc Project and covers the delivery of approximately 1 100 m of single carriageway road with a corridor width from plot edge to plot edge ranging from 13 m to 19 m and a single span road bridge of 60 m approximate length, over an existing water course (a tributary to the River Adur). The envisaged construction period for the works is 14-16 months.
II.1.6) Information about lots
This contract is divided into lots:
No
II.2) Description
II.2.2) Additional CPV code(s)
45210000
71325000
45233120
45233121
45233128
45221110
45221111
45233124
45233125
45233123
45233226
45233227
71322500
71322300
II.2.3) Place of performance
NUTS code:
UK
II.2.4) Description of the procurement
This work package is the second infrastructure contract package to be let by Homes England for the Northern Arc Project and covers the delivery of approximately 1 100 m of single carriageway road with a corridor width from plot edge to plot edge ranging from 13 m to 19 m and a single span road bridge of 60 m approximate length, over an existing water course (a tributary to the River Adur). The envisaged construction period for the works is 14-16 months.
This second ‘delivery’ section of the principal link road highway for Northern Arc is to the western portion of the site, specifically connecting Jane Murray Way (to the south) via a new roundabout on the A2300 to an agreed coordinated point within the western site area (immediately after a new bridge crossing over a tributary to the River Adur. This second infrastructure work package includes all infrastructure, associated landscape, drainage, utility/utility diversionary works and street lighting works along the highway corridor together with the individual bellmouth connections to future development plots to one/both sides of the new carriageway.
II.2.5) Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 16
This contract is subject to renewal: No
II.2.9) Information about the limits on the number of candidates to be invited
II.2.10) Information about variants
Variants will be accepted:
No
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Section III: Legal, economic, financial and technical information
III.1) Conditions for participation
III.1.2) Economic and financial standing
Selection criteria as stated in the procurement documents
III.1.3) Technical and professional ability
Selection criteria as stated in the procurement documents
III.2) Conditions related to the contract
III.2.3) Information about staff responsible for the performance of the contract
Obligation to indicate the names and professional qualifications of the staff assigned to performing the contract
Section IV: Procedure
IV.1) Description
IV.1.1) Type of procedure
Restricted procedure
IV.1.8) Information about Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement:
Yes
IV.2) Administrative information
IV.2.2) Time limit for receipt of tenders or requests to participate
Date:
30/08/2019
Local time: 17:00
IV.2.3) Estimated date of dispatch of invitations to tender or to participate to selected candidates
Date:
15/11/2019
IV.2.4) Languages in which tenders or requests to participate may be submitted
EN
Section VI: Complementary information
VI.1) Information about recurrence
This is a recurrent procurement:
No
VI.3) Additional information
Tenderers wishing to be considered must register their expression of interest and submit a tender through our eTendering system. If not already registered, you should register at https://procontract.due-north.com/Login
All discussions, meetings, and communications will be conducted in English. The contract will be subject to English law. Tender pricing and payments must be in GBP. This procurement and award are subject to the UK Government transparency arrangements and is subject to the Freedom of information Act 2000. We take a zero-tolerance approach to bribery and corruption see https:// www.gov.uk/government/publications/anti-bribery-and-corruption-policy
Homes England is committed to protecting personal data, see https://www.gov.uk/government/organisations/ homes-england/about/personal-information-charter
All dates are indicative and may be amended.
VI.4) Procedures for review
VI.4.1) Review body
Royal Courts of Justice
the Strand
London
WC2A 2LL
UK
VI.5) Date of dispatch of this notice
30/07/2019