Prior Information Notice

Modifications to Henderson Dry Dock at the Port of Immingham

  • First published: 02 August 2023
  • Last modified: 02 August 2023

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-03ec1f
Published by:
Associated British Ports
Authority ID:
AA20591
Publication date:
02 August 2023
Deadline date:
-
Notice type:
Prior Information Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The aim of this project is to increase the draft of vessels can be accommodated in Henderson Dry Dock. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works including shoring of the HDD (Henderson Dry Dock) walls and cofferdam. Site establishment and preparations. Construction Works - Installing a cofferdam to the front of the Dry Dock; - Pumping out the Dry Dock; - Install temporary works to restrain dry dock walls - Remove and dispose of the remaining sediment to the base of the dry dock; - Break out and remove sill; - Increase the depth of the dry dock by approximately 1m by means of breaking out or planning concrete; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Associated mooring / quay furniture - Removal of cofferdam and other temporary works; - Performance monitoring of the new structure including undertaking surveys during the defects period.

Full notice text

Prior information notice

This notice is for prior information only

Section I: Contracting authority

I.1) Name and addresses

Associated British Ports

25 Bedford Street

London

WC2E 9ES

UK

Contact person: Group Procurement

E-mail: procurement@abports.co.uk

NUTS: UKE13

Internet address(es)

Main address: https://in-tendhost.co.uk/abp/aspx/Tenders/Current

Address of the buyer profile: https://in-tendhost.co.uk/abp/aspx/Tenders/Current

I.3) Communication

Additional information can be obtained from the abovementioned address


I.4) Type of the contracting authority

Other: Utility

I.5) Main activity

Other: Port Operator

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Modifications to Henderson Dry Dock at the Port of Immingham

II.1.2) Main CPV code

45240000

 

II.1.3) Type of contract

Works

II.1.4) Short description

Procurement of the Principal Contractor for the design and construction of works to modify Henderson Dry Dock, remove RORO (Roll On Roll Off) ramps, partially demolish the sill and undertake remodelling works required to the quay. Please respond to this PIN by email to procurement@abports.co.uk

II.1.6) Information about lots

This contract is divided into lots: Yes

II.2) Description

Lot No: 1

II.2.1) Title

Modifications to Henderson Dry Dock at the Port of Immingham Including Increasing the Depth

II.2.2) Additional CPV code(s)

45240000

45244000

45241100

45241400

45213342

II.2.3) Place of performance

NUTS code:

UKE13


Main site or place of performance:

Port of Immingham

II.2.4) Description of the procurement

The aim of this project is to increase the draft of vessels can be accommodated in Henderson Dry Dock. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works including shoring of the HDD (Henderson Dry Dock) walls and cofferdam. Site establishment and preparations. Construction Works - Installing a cofferdam to the front of the Dry Dock; - Pumping out the Dry Dock; - Install temporary works to restrain dry dock walls - Remove and dispose of the remaining sediment to the base of the dry dock; - Break out and remove sill; - Increase the depth of the dry dock by approximately 1m by means of breaking out or planning concrete; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Associated mooring / quay furniture - Removal of cofferdam and other temporary works; - Performance monitoring of the new structure including undertaking surveys during the defects period.

Lot No: 2

II.2.1) Title

Modifications to Henderson Dry Dock at the Port of Immingham Excluding Works Associated with Increasing the Depth

II.2.2) Additional CPV code(s)

45240000

45244000

45241100

45241400

45213342

II.2.3) Place of performance

NUTS code:

UKE13

II.2.4) Description of the procurement

The aim of this project is to modify Henderson Dry Dock to meet business requirements without increasing the depth. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works. Site establishment and preparations. Construction Works - Install temporary works to allow breaking out of sill; - Break out and remove sill; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back Dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Removal of temporary works;- Associated mooring / quay furniture

II.3) Estimated date of publication of contract notice:

05/09/2023

Section IV: Procedure

IV.1) Description

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: No

Section VI: Complementary information

VI.5) Date of dispatch of this notice

01/08/2023

Coding

Commodity categories

ID Title Parent category
45240000 Construction work for water projects Works for complete or part construction and civil engineering work
45241400 Dock construction work Harbour construction works
45244000 Marine construction works Construction work for water projects
45241100 Quay construction work Harbour construction works
45213342 Ro-ro terminal construction work Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
procurement@abports.co.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.