Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

UK4

ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role

  • First published: 19 August 2026
  • Last modified: 19 August 2026
  • Version: N/A
  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Information icon
You are viewing an expired notice.

Contents

Summary

OCID:
ocds-h6vhtk-06de5f
Published by:
The Pirbright Institute
Authority ID:
AA28260
Publication date:
19 August 2026
Deadline date:
24 September 2026
Notice type:
UK4
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

This opportunity (“Contract”) is for a single supplier to provide:1. Civil Works and CDM Principal Designer/Principal Contractor Role for the ISO11 Fumigation Lobby Replacement Project.2. Conversion of Structural Engineer’s drawings to Construction Drawings.3. Liaison with Local Authority to ensure compliance with Building Control. This will include providing drawings and information as required by the Local Authority and hosting them during site visits. Fees for Building Control will be paid for by The Pirbright Institute.4. Construction of a Temporary Biocontainment Wall which will allow the area to be externalised from ISO11 to enable construction works to take place. The wall shall provide a bioseal between the working area and the contained area. Suppliers must allow for works carried out close to this wall to be carried out with care and attention to prevent damage to the wall.5. Strip out of existing fumigation chamber and autoclave.6. Remove door between G48 & G44 (ISO8), brick up and render.7. Remove the external door in G62, brick up and render.8. Create opening into G49/G62 area after temporary containment barrier is in place. 9. Create new loading area in G49 / G62 area. This will include making good the floors, walls and ceiling to the same standards as ISO11 to maintain sealability. Remove and make good any raised door threshold so that there is smooth access to the fumigation lobby for pallet trucks.10. Create space for new Fumigation Lobby and construct flooring inside Fumigation chamber to match with the flooring in ISO11 and ensure the threshold in and out of the fumigation lobby is flush to the floor so pallet trucks can access without any obstacles.11. Remove current double doors in G51, brick up and render.12. Create new opening to G51 and supply/install new double doors with SR4 security rating.13. Create new unloading area in G51 with double door entry from the external hard standing (currently underneath the staircase). Walls and ceilings to be rendered and painted with wipeable paint for hygienic areas. Floor to be constructed to same standard as internal flooring to match that of the fumigation chamber to ensure unobstructed access to pallet trucks.14. Remove and replace external staircase to allow forklift truck access to room G51 and maintain access to the first-floor plantroom. 15. Replace double doors to first floor plantroom and decorate.16. The supplier is to make allowance to liaise with the fumigation lobby supplier to ensure they have the details to integrate the new fumigation lobby into the refurbished area.17. The supplier shall allow for covered skip for metal and construction waste to be stored on site for 6 months quarantine before disposing off site.18. The Pirbright Institute would also like to obtain an option cost to refurbish room G44, so that it can become part of ISO11. The supplier is to allow for upgrade the flooring to the same standard as ISO11 so that there is unobstructed access between G44 & G48 areas, walls and ceiling to be refurbished to ensure they maintain sealability. The works in 6 will apply to the door in G44 between G40 and G47 if this option is ordered.19. The supplier is to provide CDM Principal Designer and Principal Contractor Role for the entire project. Details of this are shown in ITT Part 1 - Appendix 1 - Civil & CDM Scope of Works.20. On completion, an O&M is to be submitted which provides details of works from design to completion. This shall include as built drawings and Building Control Completion Certificates.

Full notice text

Scope

Procurement description

This opportunity (“Contract”) is for a single supplier to provide:

1. Civil Works and CDM Principal Designer/Principal Contractor Role for the ISO11 Fumigation Lobby Replacement Project.

2. Conversion of Structural Engineer’s drawings to Construction Drawings.

3. Liaison with Local Authority to ensure compliance with Building Control. This will include providing drawings and information as required by the Local Authority and hosting them during site visits. Fees for Building Control will be paid for by The Pirbright Institute.

4. Construction of a Temporary Biocontainment Wall which will allow the area to be externalised from ISO11 to enable construction works to take place. The wall shall provide a bioseal between the working area and the contained area. Suppliers must allow for works carried out close to this wall to be carried out with care and attention to prevent damage to the wall.

5. Strip out of existing fumigation chamber and autoclave.

6. Remove door between G48 & G44 (ISO8), brick up and render.

7. Remove the external door in G62, brick up and render.

8. Create opening into G49/G62 area after temporary containment barrier is in place.

9. Create new loading area in G49 / G62 area. This will include making good the floors, walls and ceiling to the same standards as ISO11 to maintain sealability. Remove and make good any raised door threshold so that there is smooth access to the fumigation lobby for pallet trucks.

10. Create space for new Fumigation Lobby and construct flooring inside Fumigation chamber to match with the flooring in ISO11 and ensure the threshold in and out of the fumigation lobby is flush to the floor so pallet trucks can access without any obstacles.

11. Remove current double doors in G51, brick up and render.

12. Create new opening to G51 and supply/install new double doors with SR4 security rating.

13. Create new unloading area in G51 with double door entry from the external hard standing (currently underneath the staircase). Walls and ceilings to be rendered and painted with wipeable paint for hygienic areas. Floor to be constructed to same standard as internal flooring to match that of the fumigation chamber to ensure unobstructed access to pallet trucks.

14. Remove and replace external staircase to allow forklift truck access to room G51 and maintain access to the first-floor plantroom.

15. Replace double doors to first floor plantroom and decorate.

16. The supplier is to make allowance to liaise with the fumigation lobby supplier to ensure they have the details to integrate the new fumigation lobby into the refurbished area.

17. The supplier shall allow for covered skip for metal and construction waste to be stored on site for 6 months quarantine before disposing off site.

18. The Pirbright Institute would also like to obtain an option cost to refurbish room G44, so that it can become part of ISO11. The supplier is to allow for upgrade the flooring to the same standard as ISO11 so that there is unobstructed access between G44 & G48 areas, walls and ceiling to be refurbished to ensure they maintain sealability. The works in 6 will apply to the door in G44 between G40 and G47 if this option is ordered.

19. The supplier is to provide CDM Principal Designer and Principal Contractor Role for the entire project. Details of this are shown in ITT Part 1 - Appendix 1 - Civil & CDM Scope of Works.

20. On completion, an O&M is to be submitted which provides details of works from design to completion. This shall include as built drawings and Building Control Completion Certificates.

Main category

Works

Delivery regions

  • UKJ25 - West Surrey

Total value (estimated, excluding VAT)

154166 GBP to 154166GBP

Contract dates (estimated)

06 November 2026, 00:00AM to 05 October 2027, 23:59PM

Contracting authority

THE PIRBRIGHT INSTITUTE

Identification register:

  • GB-COH

Address 1: Pirbright Laboratory Ash Road

Town/City: Woking

Postcode: GU24 0NF

Country: United Kingdom

Website: https://www.pirbright.ac.uk/

Companies House: 00559784

NUTS code: UKJ25

Email: Procurement.department@pirbright.ac.uk

Organisation type: Public undertaking

Procedure

Procedure type

Below threshold - open competition

Is the total value above threshold?

Below threshold

Lots

Divided into 1 lots

Lot number: 1

CPV classifications

  • 45000000 - Construction work
  • 45200000 - Works for complete or part construction and civil engineering work
  • 71247000 - Supervision of building work
  • 71311000 - Civil engineering consultancy services
  • 71311100 - Civil engineering support services
  • 71320000 - Engineering design services
  • 71322000 - Engineering design services for the construction of civil engineering works
  • 79415200 - Design consultancy services
  • 79933000 - Design support services

Delivery regions

  • UKJ25 - West Surrey

Lot value (estimated)

154166 AED Excluding VAT

185000 AED Including VAT

Contract start date (estimated)

06 November 2026, 00:00AM

Contract end date (estimated)

05 October 2027, 23:59PM

Simple description of award criteria

Quality 60% / Price 40%

Participation

Is this procurement reserved for the following groups?

GB-ONS

Submission

Tender submission deadline

23 September 2026, 12:00PM

Enquiry deadline

02 September 2026, 16:00PM

Submission address and any special instructions

https://in-tendhost.co.uk/thepirbrightinstitute/aspx/Home

May tenders be submitted electronically?

Yes

Documents

ID

L-1

Document type

Bidding documents

Description

The ITT Pack can be viewed via https://in-tendhost.co.uk/thepirbrightinstitute/aspx/Home

Coding

Commodity categories

ID Title Parent category
71311000 Civil engineering consultancy services Consultative engineering and construction services
71311100 Civil engineering support services Civil engineering consultancy services
45000000 Construction work Construction and Real Estate
79415200 Design consultancy services Production management consultancy services
79933000 Design support services Specialty design services
71320000 Engineering design services Engineering services
71322000 Engineering design services for the construction of civil engineering works Engineering design services
71247000 Supervision of building work Architectural, engineering and planning services
45200000 Works for complete or part construction and civil engineering work Construction work

Delivery locations

ID Description
There are no delivery locations for this notice.

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.