Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Notice

Illtyd Pools SSSI Tree and Molinia Management Works 2026-27

  • First published: 25 August 2026
  • Last modified: 25 August 2026
  • Version: N/A
  • Record interest

     

  • This file may not be fully accessible.

  •  

Information icon

Documents for this notice are only available to suppliers who have noted interest.

To access the documents, please click the "Note Interest" button above to add this notice to your Current Notices.

Contents

Summary

OCID:
ocds-kuma6s-168849
Published by:
Brecon Beacons National Park Authority
Authority ID:
AA0501
Publication date:
25 August 2026
Deadline date:
04 September 2026
Notice type:
Contract Notice
Has documents:
Yes
Has SPD:
No
Has Carbon Reduction Plan:
No

Abstract

Bannau Brycheiniog National Park Authority is seeking quotations from suitably experienced contractors to undertake habitat restoration works within the Traeth Mawr and Blaencamlais portions of Illtyd Pools SSSI. The works are intended to reduce the impact of encroaching trees and purple moor grass (Molinia caerulea) on designated wetland, mire and bog habitats. The successful Contractor will be required to undertake at least one pre-work site visit with the client and landowners before works commence. The purpose of the visit will be to confirm site access, identify and agree the detailed actions to be undertaken, identify sensitive areas, agree working methods, and map the specific treatment areas, access routes, dip wells, extraction routes, staging areas and any exclusion zones. The Contractor must provide a simple pre-works map or annotated plan showing the agreed work areas and operational constraints. This must be agreed with the client and landowners before works begin. Tenderers must provide separate priced quotations for each of the following components. Prices should include labour, machinery, mobilisation, access arrangements, materials, supervision, health and safety provision, environmental protection measures, waste handling, and any assumptions or exclusions. Component 1: Felling Trees on Traeth Mawr Fell trees identified for removal from the Traeth Mawr section of Illtyd Pools SSSI. Larger trees are expected to be cut approximately 10 cm above ground level using electric chainsaws or chainsaws using biofuels. Smaller trees and saplings may be removed using low-impact methods such as hand tools, tree poppers or other appropriate equipment agreed with the client. Small trees may be removed as part of the Molinia management strategy if deemed appropriate. Component 2: Immediate Ecoplug Treatment of Cut Stumps on Traeth Mawr Apply Ecoplugs to cut tree stumps immediately after felling, at the recommended dose for the stump diameter. Treatment must be undertaken in accordance with manufacturer guidance, relevant pesticide legislation, operator certification requirements and all environmental safeguards appropriate to an SSSI and peatland setting. Component 3: Removal, Extraction and Chipping of Felled Trees from Traeth Mawr Remove felled woody material from the bog using low-impact methods and the minimum number of trips practicable. Brash and timber should be moved to an agreed staging area outside the SSSI boundary, including the fence-line track to the south where appropriate. Brash is to be chipped for onward use or disposal as agreed with the client. Cut lengths may be stacked outside the SSSI or removed from site, subject to agreement. Component 4: Molinia Management on Traeth Mawr Undertake management of Molinia caerulea on Traeth Mawr using low ground-pressure, wide-tracked equipment such as a PistenBully or similar, and/or bog mats where necessary. The tenderer should specify the proposed method, machinery, ground protection measures and expected treatment area. Molinia mulch is expected to be left in situ unless otherwise agreed. Component 5: Felling and Removal of Selected Trees at Blaencamlais Pool Fell and remove selected trees from Blaencamlais Pool, including trees within the SSSI and around the edge of the floating mat bog. The specific trees to be removed will be identified during the pre-work site visit and mapped before works commence. Works must avoid disturbance to the floating mat, bog surface and associated rare plants. Trees on firmer ground around the edge may be removed using small machinery, chainsaws using electric power or biofuels, tree poppers and hand tools as appropriate. Larger diameter trees at Blaencamlais Pool must be cut approximately 10 cm above ground level and treated immediately with Ecoplugs at the recommended dose, unless otherwise agreed with the client and any relevant consent conditions. Environmental and Operational Requirements All works must be under

Full notice text

CONTRACT NOTICE – NATIONAL

SERVICES

1 Authority Details

1.1

Authority Name and Address


Brecon Beacons National Park Authority

Plas y Ffynnon, Cambrian Way,

Brecon

LD3 7HP

UK

Dr Bradley A Welch

+44 1874624437


http://www.beacons-npa.gov.uk/
https://www.sell2wales.gov.wales/
https://www.sell2wales.gov.wales/

1.2

Address from which documentation may be obtained


Brecon Beacons National Park Authority

Plas y Ffynnon, Cambrian Way,

Brecon

LD3 7HP

UK


+44 1874624437


http://www.beacons-npa.gov.uk/

1.3

Completed documents must be returned to:


Brecon Beacons National Park Authority

Plas y Ffynnon, Cambrian Way,

Brecon

LD3 7HP

UK


+44 1874624437


http://www.beacons-npa.gov.uk/

2 Contract Details

2.1

Title

Illtyd Pools SSSI Tree and Molinia Management Works 2026-27

2.2

Description of the goods or services required

Bannau Brycheiniog National Park Authority is seeking quotations from suitably experienced contractors to undertake habitat restoration works within the Traeth Mawr and Blaencamlais portions of Illtyd Pools SSSI. The works are intended to reduce the impact of encroaching trees and purple moor grass (Molinia caerulea) on designated wetland, mire and bog habitats.

The successful Contractor will be required to undertake at least one pre-work site visit with the client and landowners before works commence. The purpose of the visit will be to confirm site access, identify and agree the detailed actions to be undertaken, identify sensitive areas, agree working methods, and map the specific treatment areas, access routes, dip wells, extraction routes, staging areas and any exclusion zones.

The Contractor must provide a simple pre-works map or annotated plan showing the agreed work areas and operational constraints. This must be agreed with the client and landowners before works begin.

Tenderers must provide separate priced quotations for each of the following components. Prices should include labour, machinery, mobilisation, access arrangements, materials, supervision, health and safety provision, environmental protection measures, waste handling, and any assumptions or exclusions.

Component 1: Felling Trees on Traeth Mawr

Fell trees identified for removal from the Traeth Mawr section of Illtyd Pools SSSI. Larger trees are expected to be cut approximately 10 cm above ground level using electric chainsaws or chainsaws using biofuels. Smaller trees and saplings may be removed using low-impact methods such as hand tools, tree poppers or other appropriate equipment agreed with the client. Small trees may be removed as part of the Molinia management strategy if deemed appropriate.

Component 2: Immediate Ecoplug Treatment of Cut Stumps on Traeth Mawr

Apply Ecoplugs to cut tree stumps immediately after felling, at the recommended dose for the stump diameter. Treatment must be undertaken in accordance with manufacturer guidance, relevant pesticide legislation, operator certification requirements and all environmental safeguards appropriate to an SSSI and peatland setting.

Component 3: Removal, Extraction and Chipping of Felled Trees from Traeth Mawr

Remove felled woody material from the bog using low-impact methods and the minimum number of trips practicable. Brash and timber should be moved to an agreed staging area outside the SSSI boundary, including the fence-line track to the south where appropriate. Brash is to be chipped for onward use or disposal as agreed with the client. Cut lengths may be stacked outside the SSSI or removed from site, subject to agreement.

Component 4: Molinia Management on Traeth Mawr

Undertake management of Molinia caerulea on Traeth Mawr using low ground-pressure, wide-tracked equipment such as a PistenBully or similar, and/or bog mats where necessary. The tenderer should specify the proposed method, machinery, ground protection measures and expected treatment area. Molinia mulch is expected to be left in situ unless otherwise agreed.

Component 5: Felling and Removal of Selected Trees at Blaencamlais Pool

Fell and remove selected trees from Blaencamlais Pool, including trees within the SSSI and around the edge of the floating mat bog. The specific trees to be removed will be identified during the pre-work site visit and mapped before works commence. Works must avoid disturbance to the floating mat, bog surface and associated rare plants. Trees on firmer ground around the edge may be removed using small machinery, chainsaws using electric power or biofuels, tree poppers and hand tools as appropriate.

Larger diameter trees at Blaencamlais Pool must be cut approximately 10 cm above ground level and treated immediately with Ecoplugs at the recommended dose, unless otherwise agreed with the client and any relevant consent conditions.

Environmental and Operational Requirements

All works must be undertaken in a manner appropriate to an SSSI, peatland and wetland setting.

Working methods must minimise ground disturbance, rutting, compaction, contamination and hydrological damage.

Access routes, machinery choice, staging areas and extraction methods must be agreed with the client before works commence.

Biofuels, electric equipment or other low-impact approaches should be used where practicable.

All herbicide use must comply with relevant legislation, product guidance and operator certification requirements.

No material is to be stored, chipped or disposed of within sensitive SSSI habitat unless explicitly agreed.

The Contractor must immediately report any incident, spill, damage to sensitive habitat, or discovery of previously unidentified constraints.

Deliverables

Attendance at one or more pre-work site visits as agreed.

Annotated pre-works map or plan identifying agreed work areas, trees or treatment zones, dip wells, access routes, exclusion zones and staging areas.

Completion of the agreed works under the separately quoted components.

Confirmation of Ecoplug application areas and any relevant pesticide records.

Post-works summary including photographs, confirmation of completed areas, any variations from the agreed plan and recommendations for follow-up management.

Indicative Programme

Works are expected to start on or after 1st October 2026 and be completed by 31st January 2027, subject to consent, weather, ground conditions, Contractor availability and agreement with the client. The notice of intent indicates an anticipated working period of approximately four weeks.

Tender Submission Requirements

Tenderers should submit a written quotation that includes the following information:

Separate prices for each of the five work components listed in Section 4.

A combined total price if all components are awarded together.

Day rates or variation rates for additional works, if applicable.

Proposed methodology, machinery and staffing for each component.

Evidence of relevant experience in SSSI, peatland, wetland, bog, mire or other sensitive habitat works.

Health and safety arrangements, including risk assessments and method statements to be finalised before works commence.

Any near misses, or accidents which occur whilst work is being carried out, should be reported to BBNPA immediately and these will be dealt with in accordance with BBNPA’s procedures. An Accident or near Miss Report Form must be completed for any incidents which occur.

Details of pesticide qualifications and Ecoplug application experience where relevant.

Insurance details, including public liability and employer’s liability cover to a minimum value of £1,000,000 to cover any claims arising from any third party in respect of damage or negligence on their part.

Insurance of all equipment and machinery used by Contractors on site must be the full responsibility of the Contractors.

Proposed programme and availability.

Any assumptions, exclusions, dependencies or access requirements.

NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=168849.

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx.

Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.

2.3

Notice Coding and Classification

77000000 Agricultural, forestry, horticultural, aquacultural and apicultural services
77200000 Forestry services
77210000 Logging services
90710000 Environmental management
90720000 Environmental protection
1024 Powys

2.4

Total quantity or scope of tender

£50,000

3 Conditions for Participation

3.1

Minimum standards and qualification required

Environmental and Operational Requirements

All works must be undertaken in a manner appropriate to an SSSI, peatland and wetland setting.

Working methods must minimise ground disturbance, rutting, compaction, contamination and hydrological damage.

Access routes, machinery choice, staging areas and extraction methods must be agreed with the client before works commence.

Biofuels, electric equipment or other low-impact approaches should be used where practicable.

All herbicide use must comply with relevant legislation, product guidance and operator certification requirements.

No material is to be stored, chipped or disposed of within sensitive SSSI habitat unless explicitly agreed.

The Contractor must immediately report any incident, spill, damage to sensitive habitat, or discovery of previously unidentified constraints.

Indicative Programme

Works are expected to start on or after 1st October 2026 and be completed by 31st January 2027, subject to consent, weather, ground conditions, Contractor availability and agreement with the client. The notice of intent indicates an anticipated working period of approximately four weeks.

Tender Submission Requirements

Tenderers should submit a written quotation that includes the following information:

Separate prices for each of the five work components listed in Section 4.

A combined total price if all components are awarded together.

•Day rates or variation rates for additional works, if applicable.

Proposed methodology, machinery and staffing for each component.

Evidence of relevant experience in SSSI, peatland, wetland, bog, mire or other sensitive habitat works.

Health and safety arrangements, including risk assessments and method statements to be finalised before works commence.

Any near misses, or accidents which occur whilst work is being carried out, should be reported to BBNPA immediately and these will be dealt with in accordance with BBNPA’s procedures. An Accident or near Miss Report Form must be completed for any incidents which occur.

Details of pesticide qualifications and Ecoplug application experience where relevant.

Insurance details, including public liability and employer’s liability cover to a minimum value of £1,000,000 to cover any claims arising from any third party in respect of damage or negligence on their part.

Insurance of all equipment and machinery used by Contractors on site must be the full responsibility of the Contractors.

Proposed programme and availability.

Any assumptions, exclusions, dependencies or access requirements.

Evaluation Considerations

Quotations are expected to be assessed on cost, suitability of proposed methodology, relevant experience, ability to work sensitively within SSSI and peatland conditions, availability within the required programme, health and safety competence, and clarity of assumptions and exclusions as outlined in Table 3 below.

Timetable

Invitation to Tender document sent out 25th August 2026

Tender documents to be returned 4st September 2026 (12:00 noon)

Award of contract 11th September 2026

End of contract 31st January 2027

Invoice deadline 26th February 2027

Tenders that fail to meet essential requirements may be excluded from consideration.

Tenders that fulfil essential requirements will be evaluated on the basis of the weightings detailed below:

Table 4. Evaluation criteria and weightings

Criterion Weighting

Specification Delivery – this will be assessed by whether nor not the specification can be met and the details of methods used 30%

Tender price 40%

Relevant experience 20%

Ability to complete within the time scale 10%

The overall quality score (specification delivery, experience & ability to complete within the time scale) must exceed 60% to pass the quality threshold for this tender. Tenders that fall below this quality threshold will be excluded from scoring process.

4 Administrative Information

4.1

Type of Procedure

Single stage

4.2

Reference number attributed to the notice by the contracting authority

N/a

4.3

Time Limits

Time-limit for receipt of completed tenders
    04-09-2026  Time  12:00

Estimated award date
 11-09-2026

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN  CY 

4.6

Tender Submission Postbox

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx

5 Other Information

5.1

Additional Information

Pre-Tender Questions and Site Visitation

All questions for further information or clarification relating to the brief should be submitted to the Project Officer via Sell2 Wales. Answers will be provided through Sell2Wales where possible.

Traeth Mawr can be viewed readily from the minor road that bisects the common. However, Blaencamlais Pool is privately owned. If contractors wish to view Blaencamlais Pool prior to submitting tender documents, there will be an opportunity for viewing on Wednesday, 26th August 2026 at 10.00 AM. Interested contractors are requested to meet at the National Park Visitor Centre (LD3 8ER) in Libanus at the allotted time. The landowner or their representative will be on hand to provide access to Blaencamlais Pool for you to view and assess the area. There is no obligation to attend, and attendance will not influence the scoring of tender submissions.

(WA Ref:168849)

The buyer considers that this contract is suitable for consortia bidding.

5.2

Additional Documentation

Tree and MoliniaRemoval_Tender_Illtyd Pools SSSI

5.3

Publication date of this notice

 25-08-2026

Coding

Commodity categories

ID Title Parent category
77000000 Agricultural, forestry, horticultural, aquacultural and apicultural services Agriculture and Food
90710000 Environmental management Environmental services
90720000 Environmental protection Environmental services
77200000 Forestry services Agricultural, forestry, horticultural, aquacultural and apicultural services
77210000 Logging services Forestry services

Delivery locations

ID Description
1024 Powys

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

Postbox

The awarding buyer has indicated that it will accept electronic responses to this notice via the Tender Submission Postbox facility.

Submit your tender response electronically in a secure environment.

To create an electronic response please click the "Add to my interest list" button at the top of the page.

For more information on the Postbox Facility please refer to the user guide:

Additional documents

The following additional documents have been attached to this notice. To obtain these documents please select the individual file names below.

Current documents

Documents are restricted until you note interest in this notice. The documents will become publicly available after the response deadline has passed.

There are no documents attached to this document

Replaced documents

There are no previous versions of these documents.


0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.