Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Award Notice

Construction Works Framework (East Region)

  • First published: 20 December 2019
  • Last modified: 20 December 2019
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
Published by:
Highways England
Authority ID:
AA38103
Publication date:
20 December 2019
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

Temporary traffic management

The lot will cover the supply of materials, plant and labour for the following: (but not limited to):

— mobilisation,

— early contractor involvement,

— management network occupancy,

— community,

— contingency,

— design installation, maintenance and removal of temporary traffic management,

— installation, maintenance and removal of temporary safety barrier systems,

— installation, maintenance and removal of temporary speed enforcement systems,

— Installation, maintenance and removal of temporary CCTV systems,

— management of breakdown recovery services,

— installation, maintenance and removal of temporary road markings and road studs,

— removal of existing road markings and road studs,

— principal contractor,

— deliver incident response (rapid response).

East Area location to include the counties of Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk, Suffolk.

Highways England may also use this framework to deliver works in any other HE operational area as a contingent measure.

Full notice text

Contract award notice

Results of the procurement procedure

Section I: Contracting entity

I.1) Name and addresses

Highways England

Woodlands, Manton Lane

Bedford

MK41 7LW

UK

E-mail: Alison.Perry@highwaysengland.co.uk

NUTS: UKH24

Internet address(es)

Main address: www.highwaysengland.co.uk

I.4) Type of the contracting authority

National or federal agency/office

I.5) Main activity

General public services

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Construction Works Framework (East Region)

II.1.2) Main CPV code

45233100

 

II.1.3) Type of contract

Works

II.1.4) Short description

HE has a requirement to deliver construction works to maintain, repair and renew the Strategic Road Network (SRN) with the HE East region. CWF will be made up of a number of different contractors from different specialist areas who will work together to deliver network improvement and maintenance schemes within the east region. The framework will cover but is not limited to road lighting and electrical, general civils, technology, landscaping and ecology, road marking and studs, road restraint systems and fencing, drainage and geotechnical, temporary traffic management, structures and structural services and other similar duties. HE may also use this framework to deliver works in any other areas as a contingency. The length of the contract is 54 months which includes a 6 month mobilisation period.

II.1.6) Information about lots

This contract is divided into lots: Yes

II.1.7) Total value of the procurement

Value excluding VAT: 340 000 000.00  GBP

II.2) Description

Lot No: Within AD this is referred to as Lot 11

II.2.1) Title

Temporary Traffic Management

II.2.2) Additional CPV code(s)

34923000

34928100

34928110

34928300

34970000

34972000

45213310

45233100

45233120

45233121

45233141

45233150

45233280

45316210

45316212

45316213

45340000

50000000

50200000

50230000

50232000

50232200

63712000

63712200

63712700

63712710

71322000

71322500

II.2.3) Place of performance

NUTS code:

UK

II.2.4) Description of the procurement

Temporary traffic management

The lot will cover the supply of materials, plant and labour for the following: (but not limited to):

— mobilisation,

— early contractor involvement,

— management network occupancy,

— community,

— contingency,

— design installation, maintenance and removal of temporary traffic management,

— installation, maintenance and removal of temporary safety barrier systems,

— installation, maintenance and removal of temporary speed enforcement systems,

— Installation, maintenance and removal of temporary CCTV systems,

— management of breakdown recovery services,

— installation, maintenance and removal of temporary road markings and road studs,

— removal of existing road markings and road studs,

— principal contractor,

— deliver incident response (rapid response).

East Area location to include the counties of Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk, Suffolk.

Highways England may also use this framework to deliver works in any other HE operational area as a contingent measure.

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Lot No: Within AD this is referred to as Lot 9

II.2.2) Additional CPV code(s)

45233120

45233121

45233141

50200000

50230000

63712000

II.2.3) Place of performance

NUTS code:

UK

II.2.4) Description of the procurement

Road restraint and fencing

The lot covers the following activities (but not limited to):

— mobilisation,

— early contractor involvement,

— management network occupancy,

— community,

— contingency,

— installation and removal of road restraint systems (vehicle and pedestrian),

— installation and removal of highway fencing and environmental barrier,

— temporary works,

— principal contractor,

— welfare facilities,

— deliver incident response (rapid response),

— push tests of existing and new road restraint systems.

East Area location to include the counties of Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk, Suffolk.

Highways England may also use this framework to deliver works in any other HE operational area as a contingent measure.

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Lot No: Within AD this is referred to as Lot 8

II.2.2) Additional CPV code(s)

45233120

45233121

45233141

50200000

50230000

63712000

II.2.3) Place of performance

NUTS code:

UK

II.2.4) Description of the procurement

Road markings and road studs

The lot covers supply of materials, plant and labour for the following (but not limited to):

— mobilisation,

— early contractor involvement,

— management network occupancy,

— community,,

— contingency,

— highway road markings,

— road studs,

— installation and removal of temporary road markings and road studs,

— anti-skid systems,

— principal contractor,

— welfare facilities,

— deliver incident response (rapid response).

The scope may also include rapid response.

East Area location to include the counties of Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk, Suffolk.

Highways England may also use this framework to deliver works in any other HE operational area as a contingent measure.

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Lot No: Within AD this is referred to as Lot 4

II.2.2) Additional CPV code(s)

45233120

45233121

45233141

50200000

50230000

63712000

II.2.3) Place of performance

NUTS code:

UK

II.2.4) Description of the procurement

Road lighting

The lot covers the supply of materials, plant and labour for the following (but not limited to):

— mobilisation,

— early contractor involvement,

— management network occupancy,

— community,

— contingency,

— road lighting,

— illuminated signs and other highway electrical equipment,

— principal contractor,

— welfare facilities,

— deliver incident response (rapid response).

The scope may also include carrying out the duties of the M&R contract and emergency response.

East Area location to include the counties of Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk, Suffolk.

Highways England may also use this framework to deliver works in any other HE operational area as a contingent measure.

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Lot No: Within AD this is referred to as Lot 6

II.2.2) Additional CPV code(s)

45233120

45233121

45233141

50200000

50230000

63712000

II.2.3) Place of performance

NUTS code:

UK

II.2.4) Description of the procurement

Technology

The lot covers the supply of materials, plant and labour for the following (but not limited to):

— mobilisation,

— early contractor involvement,

— management network occupancy,

— community,

— contingency

— construction of highway technology works including the supply and installation of specialist technology equipment,

— installation, removal and commissioning of traffic signal equipment, safety cameras and CCTV equipment,

— principal contractor,

— welfare facilities,

— deliver incident response (rapid response).

East Area location to include the counties of Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk, Suffolk.

Highways England may also use this framework to deliver works in any other HE operational area as a contingent measure.

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Lot No: Within AD this is referred to as Lot 5

II.2.2) Additional CPV code(s)

45233120

45233121

45233141

50200000

50230000

63712000

II.2.3) Place of performance

NUTS code:

UK

II.2.4) Description of the procurement

General civils, drainage and geotechnical

The lot covers the supply of materials, plant and labour to carry out construction and removal activities for the following:(but not limited to):

— mobilisation,

— early contractor involvement,

— management network occupancy,

— community,

— contingency,

— ducting,

— kerbing,

— footways,

— modular paving,

— brick/block/stonework,

— foundations and piling,

— retaining walls,

— demolition,

— earthworks,

— temporary works,

— non-illuminated traffic signs and posts,

— site clearance and landscaping,

— asbestos removal (planned),

— earthwork stabilisation,

— counterfort drains and soil nailing,

— ground anchors,

— slope netting (rock and soil),

— rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete,

— ‘Innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil,

— principal contractor,

— welfare facilities,

— deliver Incident Response (Rapid Response) traffic signs and posts,

— construction and removal of drainage and manhole/catch pits,

— renewal or recycling of filter drain material,

— renewal and repair of pipes and pipe lining,

— renewal of ditches, swales, ponds and any other vegetative treatment systems,

— control and disposal of contaminated material,

— CCTV surveys,

— crack sealing,

— pavement joint repair,

— jetting and mechanical clearance of drains and soakaways,

— installation, removal and renewal of flow control equipment in storm-flow or attenuation systems, and

— installation, removal and renewal of any other drainage ancillary items including petrol interceptors.

The scope may also include carrying out the duties of the M&R contract and emergency response.

East Area location to include the counties of Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk, Suffolk.

Highways England may also use this framework to deliver works in any other HE operational area as a contingent measure.

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Lot No: Within Ad this is referred to as Lot 7

II.2.2) Additional CPV code(s)

45233120

45233121

45233141

50200000

50230000

63712000

II.2.3) Place of performance

NUTS code:

UK

II.2.4) Description of the procurement

Landscape and ecology

The lot covers supply of materials, plant and labour for the following (but not limited to):

— mobilisation,

— early contractor involvement,

— Management Network Occupancy,

— community,

— contingency,

— weed control,

— wildlife control,

— ground preparation,

— site clearance,

— seeding,

— turfing,

— planting,

— watering,

— tree and shrub maintenance,

— management of waterbodies and any other special ecological measures,

— principal contractor,

— welfare facilities.

East Area location to include the counties of Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk, Suffolk.

Highways England may also use this framework to deliver works in any other HE operational area as a contingent measure.

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Lot No: Within AD this is referred to as Lot 13

II.2.2) Additional CPV code(s)

45233120

45233121

45233141

50200000

50230000

63712000

II.2.3) Place of performance

NUTS code:

UK

II.2.4) Description of the procurement

Structures, structural services and expansion joints

The lot covers the supply of materials, plant and labour for the following (but not limited to):

— mobilisation,

— early contractor involvement,

— management network occupancy,

— community,

— contingency,

— application of painting systems including specialist corrosion protection systems,

— installation, maintenance and removal of any temporary works required to ensure a safe method of working in relation to the service provided,

— installation of, and repair works to, highway structures waterproofing systems including testing of existing waterproofing systems,

— repair of concrete on highway structures including structural concrete works,

— bridge repair and strengthening works (structural and non-structural),

— installation and commissioning of cathodic protection systems,

— installation and commissioning of remote monitoring systems,

— installation and repair of bridge parapets,

— installation and repair of bridge bearings,

— installation of, and repair works to, highway structures expansions joints,

— principal contractor,

— welfare facilities,

— deliver incident response (rapid response).

East Area location to include the counties of Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk, Suffolk.

Highways England may also use this framework to deliver works in any other HE operational area as a contingent measure.

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Restricted procedure

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

Section V: Award of contract

Lot No: 4

Title: Road lighting

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 4

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Carnell

Penkridge

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 5

Title: General civils

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 5

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Eurovia

Cheshunt

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 5

Title: General civils

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 5

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Carnell

Penkridge

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 6

Title: Technology

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 6

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Mway

Rotherham

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 7

Title: Landscaping & ecology

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 5

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Ainsty Timber Marketing

Boroughbridge

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 7

Title: Landscaping & ecology

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 5

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Ground Control

Billericay

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 8

Title: Road markings

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 3

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

WJ South

Milton Keynes

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 8

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 3

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Colas

Newcastle-upon-Tyne

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 9

Title: Road restraints

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 3

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

HW Martin (Fencing)

Alfreton

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 9

Title: Road Restraints

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 3

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Colas

Newcastle-upon-Tyne

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 11

Title: Temporary Traffic Management

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 5

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Chevron

Thame

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 11

Title: Temporary Traffic Management

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 5

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

HW Martin Traffic Management

Blackwell

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 13

Title: Structures

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 5

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

John Graham

Peterborough

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section V: Award of contract

Lot No: 13

Title: Structures

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

18/12/2019

V.2.2) Information about tenders

Number of tenders received: 5

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

VolkerLaser

Worcester

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : .01  GBP

V.2.5) Information about subcontracting

Section VI: Complementary information

VI.4) Procedures for review

VI.4.1) Review body

See details at 4.3

See details at 4.3

UK

VI.4.3) Review procedure

Precise information on deadline(s) for review procedures:

Highways England incorporated a minimum 10 day standstill period at the point information on award of the contract was communicated to tenderers. Appeals should be lodged in accordance with the public contract Regs 2015 (SI 2006 No 5) as amended.

VI.5) Date of dispatch of this notice

18/12/2019

Coding

Commodity categories

ID Title Parent category
45213310 Construction work for buildings relating to road transport Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
45233100 Construction work for highways, roads Construction, foundation and surface works for highways, roads
34928100 Crash barriers Road furniture
71322000 Engineering design services for the construction of civil engineering works Engineering design services
71322500 Engineering-design services for traffic installations Engineering design services for the construction of civil engineering works
45233280 Erection of road-barriers Construction, foundation and surface works for highways, roads
45340000 Fencing, railing and safety equipment installation work Building installation work
63712200 Highway operation services Support services for road transport
45316213 Installation of traffic guidance equipment Installation work of illumination and signalling systems
45316212 Installation of traffic lights Installation work of illumination and signalling systems
45316210 Installation of traffic monitoring equipment Installation work of illumination and signalling systems
45233121 Main road construction works Construction, foundation and surface works for highways, roads
50232000 Maintenance services of public-lighting installations and traffic lights Repair, maintenance and associated services related to roads and other equipment
50000000 Repair and maintenance services Other Services
50200000 Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment Repair and maintenance services
50230000 Repair, maintenance and associated services related to roads and other equipment Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment
34928110 Road barriers Road furniture
45233120 Road construction works Construction, foundation and surface works for highways, roads
34923000 Road traffic-control equipment Road equipment
45233141 Road-maintenance works Construction, foundation and surface works for highways, roads
34928300 Safety barriers Road furniture
63712000 Support services for road transport Support services for land transport
63712700 Traffic control services Support services for road transport
63712710 Traffic monitoring services Support services for road transport
45233150 Traffic-calming works Construction, foundation and surface works for highways, roads
34972000 Traffic-flow measuring system Traffic-monitoring equipment
34970000 Traffic-monitoring equipment Miscellaneous transport equipment and spare parts
50232200 Traffic-signal maintenance services Maintenance services of public-lighting installations and traffic lights

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
Alison.Perry@highwaysengland.co.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.