II.2.2) Additional CPV code(s)
45213320
II.2.3) Place of performance
NUTS code:
UKE41
II.2.4) Description of the procurement
The delivery of the Bradford Forster Square Station redevelopment. The specific activities that are required by the contractor throughout Stage 1 include but are not limited to:
— principal designer and principal contractor duties,
— assembly of all necessary pre-construction information,
— identification, coordination and accommodation of the interests of impacted authorities and utilities providers,
— design and design management,
— design assurance, checking and certification,
— design submissions and procedures,
— Stage 2 construction methodology planning and sequencing,
— Stage 2 temporary works planning and sequencing,
— concept value engineering,
— project cost establishment and maintenance,
— identification and coordination of all necessary land and premises acquisition,
— obtaining all necessary permissions, permits, licences and consents from others,
— pre-determination of potential and significant Subcontractors required for Stage 2,
— creation of proposed Subcontractor conditions of contract,
— creation of the quality management policy statement and the contract delivery plan,
— establishment of project/progress meetings,
— establishment of document control procedures,
— reporting and communications,
— provision of any necessary site inspections, surveys and investigations,
— surveying and setting out,
— provision of the contractor’s interim proposals and final proposal for Stage 2.
The specific activities that are required by the contractor throughout Stage 2 include but are not limited to:
— continuation of any indispensable as well as value adding Stage 1 activities,
— construction of the configured solution in accordance with the requirements given in the notice to proceed to Stage 2,
— provision of updates to existing and proposed asset owners on any operational changes,
— provision of all necessary handover information to the employer (some of which to be passed to others as necessary),
— making good and final cleaning of the site following completion,
— demobilisation and removal from site any remaining equipment and unused materials.
II.2.5) Award criteria
Quality criterion: Quality
/ Weighting: 70
Price
/ Weighting:
30
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No