Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Award Notice

CONTRACT FOR STAGE 3B MARINE CIVILS AND RECLAMATION TO THE DOVER WESTERN DOCKS

  • First published: 10 December 2023
  • Last modified: 10 December 2023
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-037da3
Published by:
Dover Harbour Board
Authority ID:
AA20783
Publication date:
10 December 2023
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

DWDR Stage 3B Marine Civils and Reclamation, consists of infilling the old Granville Dock, Tidal Basin marinas, and the Wick Channel, to create approx. 10 hectares of Port land for future development.

Works cannot commence until the New Marina has been opened and the various stakeholders have transitioned across to the New Marina, which is expected to occur by Q3 2023.

This Contract is anticipated to commence on site in early 2024.

Works to include;

- Decommissioning of marina services (LV, potable water, and comms).

- Removal of old pontoons.

- Extracting / cutting off old pontoon restraint piles.

- Removal of old redundant greenheart timber fendering.

- Deck removal, stripping of rock armour, pile extraction / cutting-off on North Pier.

- Removal of concrete grillage, stripping of rock armour on South Pier.

- Wellington Dock quay wall structure inc. dredging and anchorage.

- Wick Channel quay wall structure inc. dredging and anchorage.

- Decommissioning of Granville Dock lock gates.

- Decommissioning of Wellington Dock lock gates.

- Decommissioning of Union St Swingbridge, including a temporary diversion of Union Street to keep it open to cargo HGVs during the decommissioning works.

- Extension of Southern Water outfall in Tidal Basin.

- Connecting to existing storm water drainage and providing a strategy for storm water drainage across the reclamation.

- Connecting to existing foul drainage and providing foul drainage across the site.

- Connecting to existing HV / LV networks and providing HV / LV across the site.

- Connecting to existing comms networks and providing comms across the site.

- Re-routing of services currently under the Wellington Dock lock pit (Union Street Swingbridge).

- Reclamation of Granville Dock, Tidal Basin and Wick Channel inc. surcharge to accelerate consolidation. The reclamation material will not be sourced via the Goodwin Sands. The Employer has no preference to the source of the reclamation material so long as it complies with the specification in the ITN.

- Heavy duty pavement along the Wick Channel.

- Extension of Union Street extending to Lord Warden Square.

- Highway Construction Union Street from the Swingbridge to the A20 Prince of Wales junction.

- Mothballing of the old marina office.

- Mothballing of the old RNLI station.

- Mothballing of the old Tug Haven building.

Full notice text

Contract award notice – utilities

Section I: Contracting entity

I.1) Name and addresses

Dover Harbour Board

Harbour House, Marine Parade

DOVER

CT179BU

UK

Contact person: Kieran Epps

Telephone: +44 1304240400

E-mail: kieran.epps@portofdover.com

NUTS: UKJ44

Internet address(es)

Main address: www.portofdover.com

I.6) Main activity

Port-related activities

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

CONTRACT FOR STAGE 3B MARINE CIVILS AND RECLAMATION TO THE DOVER WESTERN DOCKS

II.1.2) Main CPV code

45000000

 

II.1.3) Type of contract

Works

II.1.4) Short description

DWDR Stage 3B Marine Civils and Reclamation, consists of infilling the old Granville Dock, Tidal Basin marinas, and the Wick Channel, to create approx. 10 hectares of Port land for future development.

Works to include, reclamation, marine civil engineering and utilities.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Lowest offer:   / Highest offer:  

II.2) Description

II.2.2) Additional CPV code(s)

44212383

45111000

45112300

45232450

45233100

45244000

45315100

45351000

II.2.3) Place of performance

NUTS code:

UKJ44


Main site or place of performance:

Port of Dover

II.2.4) Description of the procurement

DWDR Stage 3B Marine Civils and Reclamation, consists of infilling the old Granville Dock, Tidal Basin marinas, and the Wick Channel, to create approx. 10 hectares of Port land for future development.

Works cannot commence until the New Marina has been opened and the various stakeholders have transitioned across to the New Marina, which is expected to occur by Q3 2023.

This Contract is anticipated to commence on site in early 2024.

Works to include;

- Decommissioning of marina services (LV, potable water, and comms).

- Removal of old pontoons.

- Extracting / cutting off old pontoon restraint piles.

- Removal of old redundant greenheart timber fendering.

- Deck removal, stripping of rock armour, pile extraction / cutting-off on North Pier.

- Removal of concrete grillage, stripping of rock armour on South Pier.

- Wellington Dock quay wall structure inc. dredging and anchorage.

- Wick Channel quay wall structure inc. dredging and anchorage.

- Decommissioning of Granville Dock lock gates.

- Decommissioning of Wellington Dock lock gates.

- Decommissioning of Union St Swingbridge, including a temporary diversion of Union Street to keep it open to cargo HGVs during the decommissioning works.

- Extension of Southern Water outfall in Tidal Basin.

- Connecting to existing storm water drainage and providing a strategy for storm water drainage across the reclamation.

- Connecting to existing foul drainage and providing foul drainage across the site.

- Connecting to existing HV / LV networks and providing HV / LV across the site.

- Connecting to existing comms networks and providing comms across the site.

- Re-routing of services currently under the Wellington Dock lock pit (Union Street Swingbridge).

- Reclamation of Granville Dock, Tidal Basin and Wick Channel inc. surcharge to accelerate consolidation. The reclamation material will not be sourced via the Goodwin Sands. The Employer has no preference to the source of the reclamation material so long as it complies with the specification in the ITN.

- Heavy duty pavement along the Wick Channel.

- Extension of Union Street extending to Lord Warden Square.

- Highway Construction Union Street from the Swingbridge to the A20 Prince of Wales junction.

- Mothballing of the old marina office.

- Mothballing of the old RNLI station.

- Mothballing of the old Tug Haven building.

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Negotiated with call for competition

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: No

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2022/S 000-030664

Section V: Award of contract

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

21/11/2023

V.2.2) Information about tenders

The contract has been awarded to a group of economic operators: No

V.2.5) Information about subcontracting

Section VI: Complementary information

VI.4) Procedures for review

VI.4.1) Review body

High Court of England & Wales

London

UK

VI.5) Date of dispatch of this notice

08/12/2023

Coding

Commodity categories

ID Title Parent category
45000000 Construction work Construction and Real Estate
45233100 Construction work for highways, roads Construction, foundation and surface works for highways, roads
45111000 Demolition, site preparation and clearance work Building demolition and wrecking work and earthmoving work
45232450 Drainage construction works Ancillary works for pipelines and cables
45315100 Electrical engineering installation works Electrical installation work of heating and other electrical building-equipment
45112300 Infill and land-reclamation work Excavating and earthmoving work
44212383 Lock gates Structural products and parts except prefabricated buildings
45244000 Marine construction works Construction work for water projects
45351000 Mechanical engineering installation works Mechanical installations

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
kieran.epps@portofdover.com
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.