Contract Notice

Architectural and Design Services for Forth Valley College, New Falkirk Campus.

  • First published: 12 February 2015
  • Last modified: 12 February 2015
  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Information icon
You are viewing an expired notice.

Contents

Summary

OCID:
Published by:
Forth Valley College
Authority ID:
AA36567
Publication date:
12 February 2015
Deadline date:
13 March 2015
Notice type:
Contract Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

Background to Procurement Process:

Forth Valley College (the College)has received approval from the Scottish Government to progress their proposed New Falkirk Headquarter Campus (NFHC) from approved Outline Business Case (OBC) to post completion on site.

The College will be appointing a Technical Advisory Team under a Scottish Futures Trust Framework Agreement which shall cover a number of disciplines.

The College requires a separate procurement exercise for the appointment of an Architect to provide Architectural and Design Services for it's new Falkirk Campus. The College shall follow an OJEU restricted procurement process.

On appointment of the Technical Advisory Team, it is anticipated that the Technical Advisor (Project Manager) will lead the evaluation of the OJEU restricted procurement process for the Architectural and Design Services. The successful supplier in the tender process for the Architectural and Design Services shall be appointed as a sub-consultant to the Technical Advisory Team.

Background to Project:

The College's Strategic Plan 2014-2018 outlines our mission statement as: ‘Making Learning Work'.

This is supported by 6 strategic objectives as noted below:

(a) Creating a superb environment for learning;

(b) Cultivating a vibrant learning organisation where learners develop skills, achieve qualifications valued by industry and progress seamlessly;

(c) Instilling an energy and passion for our people, celebrating success and innovation;

(d) Leading as a business that is a champion for governance, financial control and balanced risk taking;

(e) Enhancing our position as the business and community partner of choice;

(f) Delivering a whole system approach. Simply effective, efficient and consistent.

The College are well progressed in delivering the ‘Creating a superb environment for learning' strategic objective with, as noted above, the opening of two new state-of-the-art, award winning campuses in Alloa and Stirling, in 2011 and 2012 respectively, providing high quality and modern learning environments for our students.

This objective will be fully met when the third and final phase at the Falkirk campus is delivered, matching or exceeding the quality of that already in place at Alloa and Stirling.

The New Falkirk Headquarters Campus (NFHC) is to be located on the previous 10.87 acre Forth Valley College Middlefield Campus site, along with an additional section of land (4.8 acres) to the East. The site is located on Grangemouth Road, FK2 9AD. The NFHC will replace the current Forth Valley College Falkirk Campus previously occupying both sides of Middlefield Road and built in 1963.

The project funding has been set at 58 300 000 GBP +VAT (total of 70 000 000 GBP inclusive of VAT) and will be delivered using the Scottish Futures Trusts NPD revenue funded model.

A Project Programme has been developed as part of the Outline Business Case (OBC), for all stages until the completion of the works and is included in the redacted copy of the OBC. While the Project Programme is for OBC purposes only and now requires to be updated, it does meet the College's requirements for a commencement of works on Site in November 2016, completion of the construction phase in October 2018 and occupation by the College no later than December 2018.

Service Requirements — Role of Architect:

The role of the Architect shall have a broad range of responsibilities under the Technical Advisor Contract. The following provides a brief overview:

1. Following appointment of the Architect to the Framework Member, the preparation of Developed design; including:

(a) 1:1250 Site layout with levels;

(b) 1:500 Block Departmental Plans on agreed SoA;

(c) 1:200 at A1 Floor Plans, Sections, Elevations with levels;

(d) 3D computer generated visuals;

(e) 1:50 at A3 room layout plans; and

(f) full

Full notice text

CONTRACT NOTICE – OFFICIAL JOURNAL

Section I: Contracting Authority

I.1)

Name, Address and Contact Point(s)


Forth Valley College

Grangemouth Road

Falkirk

FK2 9AD

UK

Finance — Procurement Section

Angela Van Gelder

+44 1413313331

avangelder@apuc-scot.ac.uk


www.forthvalley.ac.uk

http://www.publiccontractsscotland.gov.uk/ShowProfile.aspx?ID=AA00451

www.publiccontractsscotland.gov.uk

www.publiccontractsscotland.gov.uk
Checked box
Unchecked box
Checked box
Unchecked box
Checked box
Unchecked box

I.2)

Type of contracting Authority and Main Activity or Activities

Unchecked box
Unchecked box
Unchecked box
Unchecked box
Checked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Checked box
No

Section II: Object of the Contract

II.1)

Description

II.1.1)

Title attributed to the contract by the contracting authority

Architectural and Design Services for Forth Valley College, New Falkirk Campus.

II.1.2(a))

Type of works contract

II.1.2(b))

Type of supplies contract

II.1.2(c))

Type of service contract

12

II.1.2)

Main site or location of works, place of delivery or performance

Forth Valley College, Falkirk, Scotland.



UK

II.1.3)

This notice involves

Checked box
Unchecked box
Unchecked box

II.1.4)

Information on framework agreement (if applicable)

Unchecked box
Unchecked box

Number of participants to the framework agreement envisaged

Duration of the framework agreement

Justification for a framework agreement the duration of which exceeds four years

Estimated total value of purchases for the entire duration of the framework agreement

Frequency and value of the contracts to be awarded

II.1.5)

Short description of the contract or purchase(s)

Background to Procurement Process:

Forth Valley College (the College)has received approval from the Scottish Government to progress their proposed New Falkirk Headquarter Campus (NFHC) from approved Outline Business Case (OBC) to post completion on site.

The College will be appointing a Technical Advisory Team under a Scottish Futures Trust Framework Agreement which shall cover a number of disciplines.

The College requires a separate procurement exercise for the appointment of an Architect to provide Architectural and Design Services for it's new Falkirk Campus. The College shall follow an OJEU restricted procurement process.

On appointment of the Technical Advisory Team, it is anticipated that the Technical Advisor (Project Manager) will lead the evaluation of the OJEU restricted procurement process for the Architectural and Design Services. The successful supplier in the tender process for the Architectural and Design Services shall be appointed as a sub-consultant to the Technical Advisory Team.

Background to Project:

The College's Strategic Plan 2014-2018 outlines our mission statement as: ‘Making Learning Work'.

This is supported by 6 strategic objectives as noted below:

(a) Creating a superb environment for learning;

(b) Cultivating a vibrant learning organisation where learners develop skills, achieve qualifications valued by industry and progress seamlessly;

(c) Instilling an energy and passion for our people, celebrating success and innovation;

(d) Leading as a business that is a champion for governance, financial control and balanced risk taking;

(e) Enhancing our position as the business and community partner of choice;

(f) Delivering a whole system approach. Simply effective, efficient and consistent.

The College are well progressed in delivering the ‘Creating a superb environment for learning' strategic objective with, as noted above, the opening of two new state-of-the-art, award winning campuses in Alloa and Stirling, in 2011 and 2012 respectively, providing high quality and modern learning environments for our students.

This objective will be fully met when the third and final phase at the Falkirk campus is delivered, matching or exceeding the quality of that already in place at Alloa and Stirling.

The New Falkirk Headquarters Campus (NFHC) is to be located on the previous 10.87 acre Forth Valley College Middlefield Campus site, along with an additional section of land (4.8 acres) to the East. The site is located on Grangemouth Road, FK2 9AD. The NFHC will replace the current Forth Valley College Falkirk Campus previously occupying both sides of Middlefield Road and built in 1963.

The project funding has been set at 58 300 000 GBP +VAT (total of 70 000 000 GBP inclusive of VAT) and will be delivered using the Scottish Futures Trusts NPD revenue funded model.

A Project Programme has been developed as part of the Outline Business Case (OBC), for all stages until the completion of the works and is included in the redacted copy of the OBC. While the Project Programme is for OBC purposes only and now requires to be updated, it does meet the College's requirements for a commencement of works on Site in November 2016, completion of the construction phase in October 2018 and occupation by the College no later than December 2018.

Service Requirements — Role of Architect:

The role of the Architect shall have a broad range of responsibilities under the Technical Advisor Contract. The following provides a brief overview:

1. Following appointment of the Architect to the Framework Member, the preparation of Developed design; including:

(a) 1:1250 Site layout with levels;

(b) 1:500 Block Departmental Plans on agreed SoA;

(c) 1:200 at A1 Floor Plans, Sections, Elevations with levels;

(d) 3D computer generated visuals;

(e) 1:50 at A3 room layout plans; and

(f) full room data sheets.

2. Review room data sheets (including room environmental data, room design character and schedule of components by room) prepared for the College and finalise into a reference design format.

3. Prepare Standard 1:50 Room layouts using ADB 3D for College sign off.

4. Assist the College with equipment interface responsibilities derived from room schedule of components.

5. Prepare reference design report identifying gaps in reference design, in particular room data sheet development.

6. Prepare architectural specification to current/future programme standards including:

(a) Accessibility statement;

(b) Fire strategy;

(c) Community Stakeholder consultation report;

(d) Town Planning Consultation report;

(e) Building Control Consultation report;

(f) Police Secure by Design Consultation report;

(g) CDM hazard identification;

(h) BREEAM statement;

(i) Carbon Reduction Statement; and

(j) Access and maintenance statement.

Note: This is not an exhaustive list and further detail shall be provided at tender stage.

Further Information:

Further particulars on the project are provided in the Pre Qualification Questionnaire.

Note: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at http://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=335230

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at http://www.publiccontractsscotland.gov.uk/sitehelp/help_guides.aspx

Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.

II.1.6)

Common Procurement Vocabulary (CPV)

71200000

II.1.7)

Contract covered by the Government Procurement Agreement (GPA)

Checked box

II.1.8)

Division into lots

No

II.1.9)

Will variants be accepted

No

II.2)

Quantity or Scope of the Contract

II.2.1)

Total quantity or scope

As noted in the short contract description, Forth Valley College is progressing a separate procurement process for Architectural and Design Services for it's new Falkirk Campus. The successful supplier shall be appointed as a sub-consultant to the Technical Advisory Team. The contract is expected to commence in June 2015. Occupation is expected in December 2018 with Architectural and Design Services required to the stage of post completion. Key stages are detailed in the Pre Qualification Questionnaire.

2 000 0002 400 000
GBP

II.2.2)

Options

Provisional timetable for recourse to these options

Number of possible renewals

In the case of renewable supplies or service contracts, estimated time frame for subsequent contracts

Section III: Legal, Economic, Financial and Technical Information

III.1)

Conditions Relating to the Contract

III.1.1)

Deposits and guarantees required

These shall be stated in the Invitation to Tender Document.

III.1.2)

Main Terms of financing and payment and/or reference to the relevant provisions

These shall be stated in the Invitation to Tender Document.

III.1.3)

Legal form to be taken by the grouping of suppliers, contractors or service providers to whom the contract is to be awarded

Jointly and severally liable.

III.1.4)

Other particular conditions to which the performance of the contract is subject

Conditions for participation are set out in the Pre Qualification Questionnaire.

III.2)

Conditions for Participation

III.2.1)

Personal situation of economic operators, including requirements relating to enrolment on professional or trade registers


Conditions for participation are set out in the Pre Qualification Questionnaire.

III.2.2)

Economic and financial capacity


Conditions for participation are set out in the Pre Qualification Questionnaire.



Applicants must have an annual minimum turnover of 1 500 000 GBP to participate in the competition.


III.2.3)

Technical capacity




Conditions for participation are set out in the Pre Qualification Questionnaire.


III.2.4)

Reserved contracts

Unchecked box
Unchecked box

III.3)

Conditions Specific to Service Contracts

III.3.1)

Is provision of the service reserved to a specific profession?

Yes

Architects you would propose to undertake this work must be registered with the Architects Registration Board in the UK or an equivalent regulatory body within the EU.

III.3.2)

Will legal entities be required to state the names and professional qualifications of the personnel responsible for the execution of the service?

Yes

Section IV: Procedure

IV.1)

Type of Procedure


Unchecked box Checked box
Unchecked box Unchecked box
Unchecked box Unchecked box

Justification for the choice of accelerated procedure

IV.1.1)

Have candidates already been selected?

No

IV.1.2)

Limitations on the number of operators who will be invited to tender or to participate

5

Objective criteria for choosing the limited number of candidates

Tenderers are required to complete a Pre Qualification Questionnaire. The minimum standards and selection criteria are set out in the Pre Qualification Questionnaire.

IV.1.3)

Reduction of the number of operators during the negotiation or dialogue

Unchecked box

IV.2)

Award Criteria

No


Yes

No

IV.2.2)

An electronic auction will be used

No

IV.3 Administrative Information

IV.3.1)

Reference number attributed to the notice by the contracting authority

EST-015

IV.3.2)

Previous publication(s) concerning the same contract

Unchecked box
Unchecked box


Other previous publications

IV.3.3)

Conditions for obtaining specifications and additional documents



 


IV.3.4)

Time-limit for receipt of tenders or requests to participate

 13-03-2015  12:00

IV.3.5)

Date of dispatch of invitations to tender or to participate to selected candidates

 30-03-2015

IV.3.6)

Language or languages in which tenders or requests to participate can be drawn up

Checked box    

IV.3.7)

Minimum time frame during which the tenderer must maintain the tender 

IV.3.8)

Conditions for opening tenders





Section VI: Other Information

VI.1)

Indicate whether this procurement is a recurrent one and the Estimated timing for further notices to be published


VI.2)

Does the contract relate to a Project/Programme financed by Community Funds?

No



VI.3)

Additional Information

Value:

Project value in II.2.1) is estimated only.

PQQ Returns:

Tenderers are required to submit three hard copy submissions to:

Executive Office, Forth Valley College, Stirling Campus, Drip Road, Stirling, FK8 1SE

An electronic Pre Qualification Questionnaire Response is also required to be submitted to the PCS Postbox by the closing date and time — 12:00 pm on Friday, 13.3.2015.

Clarification Questions:

Any clarification questions must be submitted through the PCS Portal. Questions shall be responded to through the Portal. The closing date for submission of clarification questions relating to the Pre Qualification Questionnaire shall be 17:00 on Friday, 27.2.2015. The College shall respond to all questions by 17:00 on Thursday, 5.3.2015.

Process Administration:

APUC Ltd is administering the procurement process on behalf of Forth Valley College. The contact for this procurement is:

Angela Van Gelder, Senior Procurement Manager, APUC Ltd.

Tel No +44 1413313331;

Mobile +44 7500051214.

E-Mail avangelder@apuc-scot.ac.uk

(SC Ref: 335230).

VI.4)

Procedures for appeal

VI.4.1)

Body responsible for appeal procedures










Body responsible for mediation procedures










VI.4.2)

Lodging of appeals

Forth Valley College will incorporate a period of 10 calendar day Standstill Period following electronic notification (minimum of 15 calendar days for any other means of communication) to unsuccessful applicants of the award decision. An economic operator that suffers, or risks suffering, loss or damage attributable to a breach of duty under the Public Contracts (Scotland) Regulations 2012 (SSI 12/88) is able to bring proceedings in the Sheriff Court or the Court of Session.

VI.4.3)

Service from which information about the lodging of appeals may be obtained










VI.5)

Dispatch date of this Notice

 10-02-2015

Coding

Commodity categories

ID Title Parent category
71200000 Architectural and related services Architectural, construction, engineering and inspection services

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
avangelder@apuc-scot.ac.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.