The Replacement of Combined Heat and Power (CHP) Sets at The Westgate Leisure Centre, Chichester.
Chichester District Council is looking to engage a suitably qualified and capable contractor to re-instate CHP generating capacity at the Westgate Leisure Centre. The 2 possible options for re-instatement included below are:
Option 1: A Capital Purchase (CAPEX) option, or
Option 2: A discounted energy purchase DEP) option.
Both options based on the full design and installation of the works, including all modifications to heating services, exhaust systems, heat dump systems, gas pipework, electrical services and control systems, etc.
Option 1: CAPEX. Replace the existing sets with a new CHP/s purchased through the contract and owned by the council, including:
— Sizing and designing requirements for a new CHP/s;
— Disconnection and removal from site of existing units and proper and legal disposal of all redundant equipment;
— Installation of new CHP/s;
— Commissioning.
Option 2: DEP. Replace the existing sets with a new CHP/s leased to the council through a DEP agreement, including:
— Sizing and designing requirements for a new CHP/s;
— Disconnection and removal from site of existing units and proper and legal disposal of all redundant equipment;
— Installation of new CHP/s;
— Commissioning.
Option 1 will require a 2 year warranty including a maintenance, monitoring and service agreement package, with a further option to provide a 10 year warranty, maintenance, monitoring and service agreement.
Option 2 will require a 12 year bespoke agreement with the successful Contractor.