Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

UK6

Rail Replacement System

  • First published: 27 February 2026
  • Last modified: 27 February 2026
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-0604eb
Published by:
Network Rail (High Speed) Limited
Authority ID:
AA85915
Publication date:
27 February 2026
Deadline date:
-
Notice type:
UK6
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The requirement for this procurement is four Rail Replacement Gantries systems for use on the HS1 route. The gantry system must be able to deliver the following requirements and conform to particular interfaces:Key requirements:System must deliver renewals in CP4System must operate in single-bore tunnel environmentSystem must perform rail replacement activities in weeknight shiftSystem must be capable of exchanging both S&C assets and CWRSystem must deliver rail, exchange rails, and collect scrap in the same working shiftKey considerations for interface groups:Permanent way: The track gauge is 1435mm. The rail type is UIC60 (aka CEN60) on mainly ballasted track with twin block sleepers, and ~50km single track on slab track. The maximum installed cant is 160mm. The maximum gradient is 1 in 40 (2.5%). Open sections have a maximum speed of 300km/h, with track centres spaced at 4.5m. The infrastructure is predominantly built to GC gauge. UIC GB+ gauge applies to the Ashford connecting lines on the NR Network. The most restrictive, W6a gauge applies to a small number of locations on NRHS-managed infrastructure.Buildings & Civils:Several tunnels exist on HS1 including twin tunnels under London from Stratford westwards towards St Pancras and eastwards towards Dagenham. Tunnel depth varies between 24m and 50m. The two London tunnels are 7.5km and 10.1km long and split by Stratford International station. Other major tunnels include the 3.1km tunnel under the Thames at Thurrock in Essex and the 3.2km North Downs Tunnel near Maidstone in Kent. HS1 features several major viaducts with three exceeding 1km in length: Medway Viaduct carries the line over the river Medway adjacent to the M2 motorway, Thurrock Viaduct takes the line over the A282 Dartford Crossing and Ashford Viaduct takes the fast lines over Ashford International station. Signalling & Telecoms (S&T):TVM430 in-cab signalling is used across the infrastructure - except at Ashford and St Pancras International stations which are equipped with the KVB train protection system. Electricfication & Plant (E&P):Catenary compliant with the Energy (High Speed) TSI supplies 25kV at 50Hz AC. The contact wire height is 5080mm above rail level except for the Ashford Station platforms where it is at 4680mm minimum.Maintenance Depot:The infrastructure maintenance depot for HS1, Singlewell Infrastructure Maintenance Depot (SIMD), is located at Singlewell, near to Gravesend, Kent. Storage, maintenance and overhaul of the proposed system would need to take place at SIMD. The contract will also includes the provision of training for Network Rail High Speed personnel to operate and maintain the Gantries once they are delivered to site.

Full notice text

Scope

Procurement description

The requirement for this procurement is four Rail Replacement Gantries systems for use on the HS1 route. The gantry system must be able to deliver the following requirements and conform to particular interfaces:

Key requirements:

System must deliver renewals in CP4

System must operate in single-bore tunnel environment

System must perform rail replacement activities in weeknight shift

System must be capable of exchanging both S&C assets and CWR

System must deliver rail, exchange rails, and collect scrap in the same working shift

Key considerations for interface groups:

Permanent way:

The track gauge is 1435mm. The rail type is UIC60 (aka CEN60) on mainly ballasted track with twin block sleepers, and ~50km single track on slab track.

The maximum installed cant is 160mm. The maximum gradient is 1 in 40 (2.5%).

Open sections have a maximum speed of 300km/h, with track centres spaced at 4.5m.

The infrastructure is predominantly built to GC gauge. UIC GB+ gauge applies to the Ashford

connecting lines on the NR Network. The most restrictive, W6a gauge applies to a small number of locations on NRHS-managed infrastructure.

Buildings & Civils:

Several tunnels exist on HS1 including twin tunnels under London from Stratford westwards towards St Pancras and eastwards towards Dagenham. Tunnel depth varies between 24m and 50m. The two London tunnels are 7.5km and 10.1km long and split by Stratford International station. Other major tunnels include the 3.1km tunnel under the Thames at Thurrock in Essex and the 3.2km North Downs Tunnel near Maidstone in Kent.

HS1 features several major viaducts with three exceeding 1km in length: Medway Viaduct carries the line over the river Medway adjacent to the M2 motorway, Thurrock Viaduct takes the line over the A282 Dartford Crossing and Ashford Viaduct takes the fast lines over Ashford International station.

Signalling & Telecoms (S&T):

TVM430 in-cab signalling is used across the infrastructure - except at Ashford and St Pancras

International stations which are equipped with the KVB train protection system.

Electricfication & Plant (E&P):

Catenary compliant with the Energy (High Speed) TSI supplies 25kV at 50Hz AC. The contact wire height is 5080mm above rail level except for the Ashford Station platforms where it is at 4680mm minimum.

Maintenance Depot:

The infrastructure maintenance depot for HS1, Singlewell Infrastructure Maintenance Depot (SIMD), is located at Singlewell, near to Gravesend, Kent. Storage, maintenance and overhaul of the proposed system would need to take place at SIMD.

The contract will also includes the provision of training for Network Rail High Speed personnel to operate and maintain the Gantries once they are delivered to site.

Contracting authority

NETWORK RAIL (HIGH SPEED) LIMITED

Identification register:

  • GB-PPON

Address 1: Waterloo General Offices

Town/City: London

Postcode: SE1 8SW

Country: United Kingdom

Website: http://www.networkrail.co.uk/

Public Procurement Organisation Number: PPWG-4728-MXTL

NUTS code: UKI45

Email: George.Fenning@networkrail.co.uk

Organisation type: Public authority - sub-central government

Supplier

Geismar Rail Industry Technologies & Services SAS

Identification register:

  • GB-PPON

Address 1: 5. rue d'Altkirch

Town/City: Colmar

Postcode: 68006

Country: France

Public Procurement Organisation Number: PBLW-6435-NQHP

NUTS code: FR

Email: v.quillien@geismar.com

Type:

  • Large

Procedure

Procedure type

Direct award

Is this procurement under a special regime?

Utilities

Contract

Rail Replacement System

ID: 1

Status: Pending

Related lots

1

Date the contract will be signed (estimated)

11 March 2026, 23:59PM

Value

5271500 EUR Excluding VAT

6325800 EUR Including VAT

Main category

Goods

CPV classifications

  • 42414310 - Mobile lifting frames

Is the total value above threshold?

Above threshold

Contract dates (estimated)

12 March 2026, 00:00AM to 16 March 2028, 23:59PM

Suppliers

  • GB-PPON-PBLW-6435-NQHP

Coding

Commodity categories

ID Title Parent category
42414310 Mobile lifting frames Cranes, mobile lifting frames and works trucks fitted with a crane

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.