Contract award notice
Results of the procurement procedure
Section I: Contracting
entity
I.1) Name and addresses
Caledonian Maritime Assets Ltd (Utility)
Municipal Buildings, Fore Street
Port Glasgow
PA14 5EQ
UK
Contact person: George McGregor
Telephone: +44 1475749920
E-mail: george.mcgregor@cmassets.co.uk
Fax: +44 1475745109
NUTS: UKM83
Internet address(es)
Main address: http://www.cmassets.co.uk
Address of the buyer profile: https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA12082
I.2) Joint procurement
The contract is awarded by a central purchasing body
I.4) Type of the contracting authority
Other: Pasenger Transport
I.5) Main activity
Other: Ferry Transport
Section II: Object
II.1) Scope of the procurement
II.1.1) Title
Lochaline Aligning Structure Replacement
Reference number: CMAL0183
II.1.2) Main CPV code
45244000
II.1.3) Type of contract
Works
II.1.4) Short description
The project will consist of the replacement of the existing timber alignment structure with a new continuous twin wall sheet pile alignment structure with a single layer of tie rods.
II.1.6) Information about lots
This contract is divided into lots:
No
II.1.7) Total value of the procurement
Lowest offer:
3 054 197.98
GBP/ Highest offer:
3 807 000.00
GBP
II.2) Description
II.2.2) Additional CPV code(s)
45244000
II.2.3) Place of performance
NUTS code:
UKM63
Main site or place of performance:
Lochaline
II.2.4) Description of the procurement
Lochaline Ferry Terminal is located within the Morvern area on the Ardnamurchan peninsula on the West coast of Scotland and owned by Caledonian Maritime Assets Ltd (CMAL). A regular ferry service operates between the slipway at Lochaline and Fishnish on the Isle of Mull. The existing aligning structure at Lochaline is believed to have originally been constructed in the early 1970’s. The structure comprises a series of timber piles at 2,1 m centres with longitudinal walings and raking timber struts to the rear of every other pile. The structure has been upgraded
Several times in the past including the addition of an inner dolphin circa 1980 and the construction of the outer dolphin in 1998. The vessels operating on this route have increased in size considerably since the structure was first built and consequently the structure is now continuously being damaged through “normal use”. It is therefore considered to have reached the end of its serviceable design life.
Project Scope
The project will consist of the replacement of the existing timber alignment structure with a new continuous twin wall sheet pile alignment structure with a single layer of tie rods. The existing alignment structure will be demolished in 14,5 m long sections commencing from the landward end. Temporary braced piles will be driven at the seaward end of each cell to protect the works from the ferry during construction of the new facility. The new structure will be built some 2 m behind the existing berthing line and will consist of 8 cells. The new alignment structure will be protected by QME 600 CO element type fenders (or similar). The recently constructed access walkway linking the current inner dolphin to the outer dolphin will be demolished once the new alignment structure is constructed. A new, independent, open, piled infill structure will be constructed to link the new alignment structure with the outer dolphin whilst accommodating the crew access gangway. Other works included within the scope are:
(a) upgrading and extension of slipway;
(b) provision of a power supply for a hybrid ferry charging point;
(c) upgrading of the lighting throughout the site (includes marshalling, etc.);
(d) increasing the size of the marshalling area;
(e) new through road including passenger drop off and parking.
II.2.5) Award criteria
Quality criterion: Quality and technical ability
/ Weighting: 60
Price
/ Weighting:
40
II.2.11) Information about options
Options:
Yes
Description of options:
Tenderers as per the instruction in the ITT document suggest fully priced up alternative proposals.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Section IV: Procedure
IV.1) Description
IV.1.1) Type of procedure
Open procedure
IV.1.8) Information about Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement:
Yes
Section V: Award of contract
Contract No: CMAL0183
A contract/lot is awarded:
Yes
V.2 Award of contract
V.2.1) Date of conclusion of the contract
06/12/2018
V.2.2) Information about tenders
Number of tenders received: 2
Number of tenders received from SMEs: 2
Number of tenders received by electronic means: 2
The contract has been awarded to a group of economic operators:
No
V.2.3) Name and address of the contractor
George Leslie Ltd
Blackbyres Road, Barrhead
Glasgow
G78 1DU
UK
Telephone: +44 141881118
Fax: +44 141881118
NUTS: UKM6
The contractor is an SME:
Yes
V.2.4) Information on value of the contract/lot (excluding VAT)
Total value of the contract/lot:
: 3 054 197.98
GBP
V.2.5) Information about subcontracting
Section VI: Complementary information
VI.3) Additional information
Lochaline Ferry Terminal is located within the Morvern area on the Ardnamurchan peninsula on the West coast of Scotland and owned by Caledonian Maritime Assets Ltd (CMAL). A regular ferry service operates between the slipway at Lochaline and Fishnish on the Isle of Mull. The existing aligning structure at Lochaline is believed to have originally been constructed in the early 1970’s. The structure comprises a series of timber piles at 2,1 m centres with longitudinal walings and raking timber struts to the rear of every other pile. The structure has been upgraded several times in the past including the addition of an inner dolphin circa 1980 and the construction of the outer dolphin in 1998. The vessels operating on this route have increased in size considerably since the structure was first built and consequently the structure is now continuously being damaged through “normal use”. It is therefore considered to have reached the end of its serviceable design life.
1.2 Project Scope
The project will consist of the replacement of the existing timber alignment structure with a new continuous twin wall sheet pile alignment structure with a single layer of tie rods. The existing alignment structure will be demolished in 14,5 m long sections commencing from the landward end. Temporary braced piles will be driven at the seaward end of each cell to protect the works from the ferry during construction of the new facility. The new structure will be built some 2 m behind the existing berthing line and will consist of 8 cells. The new alignment structure will be protected by QME 600 CO element type fenders (or similar). The recently constructed access walkway linking the current inner dolphin to the outer dolphin will be demolished once the new alignment structure is constructed. A new, independent, open, piled infill structure will be constructed to link the new alignment structure with the outer dolphin whilst accommodating the crew access gangway. Other works included within the scope are:
(a) upgrading and extension of slipway;
(b) provision of a power supply for a hybrid ferry charging point;
(c) upgrading of the lighting throughout the site (includes marshalling, etc.);
(d) increasing the size of the marshalling area;
(e) new through road including passenger drop off and parking.
Important please fully read the technical information supplied with this ITT.
(SC Ref:571160)
VI.4) Procedures for review
VI.4.1) Review body
Caledonian Maritime Assets Ltd (Utility)
Municipal Buildings, Fore Street
Port Glasgow
PA14 5EQ
UK
Telephone: +44 1475749920
Fax: +44 1475745109
Internet address(es)
URL: http://www.cmassets.co.uk
VI.5) Date of dispatch of this notice
24/01/2019