Contract Award Notice

Lochaline Aligning Structure Replacement

  • First published: 29 January 2019
  • Last modified: 29 January 2019
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
Published by:
Caledonian Maritime Assets Ltd (Utility)
Authority ID:
AA40119
Publication date:
29 January 2019
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

Lochaline Ferry Terminal is located within the Morvern area on the Ardnamurchan peninsula on the West coast of Scotland and owned by Caledonian Maritime Assets Ltd (CMAL). A regular ferry service operates between the slipway at Lochaline and Fishnish on the Isle of Mull. The existing aligning structure at Lochaline is believed to have originally been constructed in the early 1970’s. The structure comprises a series of timber piles at 2,1 m centres with longitudinal walings and raking timber struts to the rear of every other pile. The structure has been upgraded

Several times in the past including the addition of an inner dolphin circa 1980 and the construction of the outer dolphin in 1998. The vessels operating on this route have increased in size considerably since the structure was first built and consequently the structure is now continuously being damaged through “normal use”. It is therefore considered to have reached the end of its serviceable design life.

Project Scope

The project will consist of the replacement of the existing timber alignment structure with a new continuous twin wall sheet pile alignment structure with a single layer of tie rods. The existing alignment structure will be demolished in 14,5 m long sections commencing from the landward end. Temporary braced piles will be driven at the seaward end of each cell to protect the works from the ferry during construction of the new facility. The new structure will be built some 2 m behind the existing berthing line and will consist of 8 cells. The new alignment structure will be protected by QME 600 CO element type fenders (or similar). The recently constructed access walkway linking the current inner dolphin to the outer dolphin will be demolished once the new alignment structure is constructed. A new, independent, open, piled infill structure will be constructed to link the new alignment structure with the outer dolphin whilst accommodating the crew access gangway. Other works included within the scope are:

(a) upgrading and extension of slipway;

(b) provision of a power supply for a hybrid ferry charging point;

(c) upgrading of the lighting throughout the site (includes marshalling, etc.);

(d) increasing the size of the marshalling area;

(e) new through road including passenger drop off and parking.

Full notice text

Contract award notice

Results of the procurement procedure

Section I: Contracting entity

I.1) Name and addresses

Caledonian Maritime Assets Ltd (Utility)

Municipal Buildings, Fore Street

Port Glasgow

PA14 5EQ

UK

Contact person: George McGregor

Telephone: +44 1475749920

E-mail: george.mcgregor@cmassets.co.uk

Fax: +44 1475745109

NUTS: UKM83

Internet address(es)

Main address: http://www.cmassets.co.uk

Address of the buyer profile: https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA12082

I.2) Joint procurement

The contract is awarded by a central purchasing body

I.4) Type of the contracting authority

Other: Pasenger Transport

I.5) Main activity

Other: Ferry Transport

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Lochaline Aligning Structure Replacement

Reference number: CMAL0183

II.1.2) Main CPV code

45244000

 

II.1.3) Type of contract

Works

II.1.4) Short description

The project will consist of the replacement of the existing timber alignment structure with a new continuous twin wall sheet pile alignment structure with a single layer of tie rods.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Lowest offer: 3 054 197.98  GBP/ Highest offer: 3 807 000.00  GBP

II.2) Description

II.2.2) Additional CPV code(s)

45244000

II.2.3) Place of performance

NUTS code:

UKM63


Main site or place of performance:

Lochaline

II.2.4) Description of the procurement

Lochaline Ferry Terminal is located within the Morvern area on the Ardnamurchan peninsula on the West coast of Scotland and owned by Caledonian Maritime Assets Ltd (CMAL). A regular ferry service operates between the slipway at Lochaline and Fishnish on the Isle of Mull. The existing aligning structure at Lochaline is believed to have originally been constructed in the early 1970’s. The structure comprises a series of timber piles at 2,1 m centres with longitudinal walings and raking timber struts to the rear of every other pile. The structure has been upgraded

Several times in the past including the addition of an inner dolphin circa 1980 and the construction of the outer dolphin in 1998. The vessels operating on this route have increased in size considerably since the structure was first built and consequently the structure is now continuously being damaged through “normal use”. It is therefore considered to have reached the end of its serviceable design life.

Project Scope

The project will consist of the replacement of the existing timber alignment structure with a new continuous twin wall sheet pile alignment structure with a single layer of tie rods. The existing alignment structure will be demolished in 14,5 m long sections commencing from the landward end. Temporary braced piles will be driven at the seaward end of each cell to protect the works from the ferry during construction of the new facility. The new structure will be built some 2 m behind the existing berthing line and will consist of 8 cells. The new alignment structure will be protected by QME 600 CO element type fenders (or similar). The recently constructed access walkway linking the current inner dolphin to the outer dolphin will be demolished once the new alignment structure is constructed. A new, independent, open, piled infill structure will be constructed to link the new alignment structure with the outer dolphin whilst accommodating the crew access gangway. Other works included within the scope are:

(a) upgrading and extension of slipway;

(b) provision of a power supply for a hybrid ferry charging point;

(c) upgrading of the lighting throughout the site (includes marshalling, etc.);

(d) increasing the size of the marshalling area;

(e) new through road including passenger drop off and parking.

II.2.5) Award criteria

Quality criterion: Quality and technical ability / Weighting: 60

Price / Weighting:  40

II.2.11) Information about options

Options: Yes

Description of options:

Tenderers as per the instruction in the ITT document suggest fully priced up alternative proposals.

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Open procedure

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

Section V: Award of contract

Contract No: CMAL0183

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

06/12/2018

V.2.2) Information about tenders

Number of tenders received: 2

Number of tenders received from SMEs: 2

Number of tenders received by electronic means: 2

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

George Leslie Ltd

Blackbyres Road, Barrhead

Glasgow

G78 1DU

UK

Telephone: +44 141881118

Fax: +44 141881118

NUTS: UKM6

The contractor is an SME: Yes

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : 3 054 197.98  GBP

V.2.5) Information about subcontracting

Section VI: Complementary information

VI.3) Additional information

Lochaline Ferry Terminal is located within the Morvern area on the Ardnamurchan peninsula on the West coast of Scotland and owned by Caledonian Maritime Assets Ltd (CMAL). A regular ferry service operates between the slipway at Lochaline and Fishnish on the Isle of Mull. The existing aligning structure at Lochaline is believed to have originally been constructed in the early 1970’s. The structure comprises a series of timber piles at 2,1 m centres with longitudinal walings and raking timber struts to the rear of every other pile. The structure has been upgraded several times in the past including the addition of an inner dolphin circa 1980 and the construction of the outer dolphin in 1998. The vessels operating on this route have increased in size considerably since the structure was first built and consequently the structure is now continuously being damaged through “normal use”. It is therefore considered to have reached the end of its serviceable design life.

1.2 Project Scope

The project will consist of the replacement of the existing timber alignment structure with a new continuous twin wall sheet pile alignment structure with a single layer of tie rods. The existing alignment structure will be demolished in 14,5 m long sections commencing from the landward end. Temporary braced piles will be driven at the seaward end of each cell to protect the works from the ferry during construction of the new facility. The new structure will be built some 2 m behind the existing berthing line and will consist of 8 cells. The new alignment structure will be protected by QME 600 CO element type fenders (or similar). The recently constructed access walkway linking the current inner dolphin to the outer dolphin will be demolished once the new alignment structure is constructed. A new, independent, open, piled infill structure will be constructed to link the new alignment structure with the outer dolphin whilst accommodating the crew access gangway. Other works included within the scope are:

(a) upgrading and extension of slipway;

(b) provision of a power supply for a hybrid ferry charging point;

(c) upgrading of the lighting throughout the site (includes marshalling, etc.);

(d) increasing the size of the marshalling area;

(e) new through road including passenger drop off and parking.

Important please fully read the technical information supplied with this ITT.

(SC Ref:571160)

VI.4) Procedures for review

VI.4.1) Review body

Caledonian Maritime Assets Ltd (Utility)

Municipal Buildings, Fore Street

Port Glasgow

PA14 5EQ

UK

Telephone: +44 1475749920

Fax: +44 1475745109

Internet address(es)

URL: http://www.cmassets.co.uk

VI.5) Date of dispatch of this notice

24/01/2019

Coding

Commodity categories

ID Title Parent category
45244000 Marine construction works Construction work for water projects

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
george.mcgregor@cmassets.co.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information