Description of the goods or services required
LHC on behalf of the Welsh Procurement Alliance (WPA) seeks to establish a Framework Agreement for Energy Efficiency (Decarbonisation) Measures and Associated Works. The contract is split into 2 main workstreams. Workstream 1 relates to the provision of 21 individual Energy Efficiency (Decarbonisation) Measures and Workstream 2 is open to organisations that have the ability to undertake all the measures from Workstream 1, as well as associated repair works.
Broadly, the Energy Efficiency (Decarbonisation) Measures are grouped under the following categories; Insulation, heating Systems, Control Technologies, Solar, Battery & Electric Vehicle Charging and Heat pumps. Detailed information is provided in the tender documentation.
Workstream 1 will contain the following annual value bands:
• £0 to £750k
• £500k-£1.5m
• £1.5million plus
Applicants can only apply to provide services to two of the three Value Bands stated in Workstream 1 above. There are no value bands for Workstream 2.
The 21 Energy Efficiency measures are as follows and for Workstream 1, Tenderers can pick and choose any of the following measures they wish to bid:
• A – External Wall Insulation
• B – Cavity Wall Insulation
• C – Internal Wall Insulation
• D – Insulation Materials (Loft)
• E – Biomass
• F – Solar PV with Battery storage
• G – Air to Water Heat Pumps
• H – District Heating Interface Units
• I – Traditional Boilers
• K – Rainscreen & Cladding
• L – CHP or CCHP
• M - Gas Absorption Heat Pumps
• N – Boiler Optimisation Technologies
• O – Lighting Controls
• P – EV Charging Infrastructure
• R – Solar Thermal Systems
• S – Building Energy Management Systems
• T – Floor Insulation
• U - Ground Source Heat Pumps
• V – Commercial Boilers
• W – Electric Heaters
|