Description of the contract
Description of the goods or services required
Minesto has developed a 500kW tidal power plant in form of a “flying” kite tethered to the sea bottom.
The 100kW Kite (Power generator) will be connected to the Faro Island Grid at 0,4kV (POC, Point of connection).
A Converter station shall control the torque at the Squirrel Cage induction generator by controlling voltage and frequency. At the grid side it shall be able to fulfil Grid Code requirements.
The Onshore Control Station system is to be divided in three separate sub systems.
1. Converter System - Converter equipment, 230V supply, energy meter and measuring devises.
2. MV System –2kV switch, earthing switch, transformer and measuring devises. NOT INCLUDED IN THIS TENDER
3. Control & UPS System – 230V supply, distribution of UPS power (to the Kite and other sensitive equipment such as MCCB control, relay protection and HMI), HMI and generator control system. NOT INCLUDED IN THIS TENDER
NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web.
The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx.
Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.
|