Contract award notice
Results of the procurement procedure
Section I: Contracting
entity
I.1) Name and addresses
United Kingdom Atomic Energy Authority
Culham Science Centre
Abingdon
OX14 3DB
UK
Contact person: Leonard Torsu
Telephone: +44 1235466904
E-mail: leonard.torsu@ukaea.uk
NUTS: UKJ14
Internet address(es)
Main address: https://www.gov.uk/government/organisations/uk-atomic-energy-authority
Address of the buyer profile: https://www.gov.uk/government/organisations/uk-atomic-energy-authority
I.4) Type of the contracting authority
Ministry or any other national or federal authority, including their regional or local subdivisions
I.5) Main activity
Other: Fusion research
Section II: Object
II.1) Scope of the procurement
II.1.1) Title
The Systems Architecture, Control System Design and Integration of a Tritium Processing Plant
Reference number: T/JP031/18
II.1.2) Main CPV code
42664000
II.1.3) Type of contract
Services
II.1.4) Short description
UKAEA invites proposals from suppliers for systems integrators. UKAEA is developing a Hydrogen 3 Advanced Technology: H3AT facility. The system integrator is expected to take responsibility for the integration of the plant design, design of control systems for the integrated plant, integration of the sub-systems for the plant and for inactive commissioning and handover of the integrated plant together with training of the client’s operational staff, to be delivered in accordance with the UK Governments ‘Soft Landings’ approach.
II.1.6) Information about lots
This contract is divided into lots:
No
II.1.7) Total value of the procurement
Lowest offer:
4 972 489.00
GBP/ Highest offer:
9 173 015.00
GBP
II.2) Description
II.2.2) Additional CPV code(s)
38900000
38540000
38970000
42150000
42151000
42152000
42152200
45214630
II.2.3) Place of performance
NUTS code:
UK
UKJ14
Main site or place of performance:
The site will at UKAEA, Abingdon, Oxfordshire, OX14 3DB, ENGLAND.
II.2.4) Description of the procurement
Requirement
UKAEA is developing a Hydrogen 3 Advanced Technology: H3AT facility. The system integrator is expected to take responsibility for the integration of the plant design, design of control systems for the integrated plant, integration of the sub-systems for the plant and, for inactive commissioning and handover of the integrated plant together with training of the client’s operational staff, to be delivered in accordance with the UK Governments ‘Soft Landings’ approach.
Background to requirement
UKAEA is to developing Hydrogen 3 Advanced Technology: H3AT facility, opening in 2021. The heart of the H3AT facility will be a fusion relevant 100g tritium processing loop comprising storage beds, a distribution system, impurity processing system, isotope separation system and systems to detritiate water and air. These will service a flexible suite of enclosures and glove boxes to allow a broad range of tests and experiments. The facility will also contain a dedicated area to develop materials detritiation processes.
The purpose of the H3AT facility is to support development of new technologies for tritium handling and the simulation of operation of tritium plant fusion reactors. The integrated systems design for the scaled tritium processing plant is the basis for the requirement and is the subject of this PQQ and the resulting Invitation to Tender: ITT.
Description of the procurement process
The innovation partnership process: INP will be established in successive phases aiming at the development and subsequent purchase of services and/or works/supplies to deliver the H3AT facility to agreed performance levels and costs.
This procurement is likely to be a multi-stage event under the INP procedure. The initial element of the process includes awarding multiple concept design contracts to provide proof of concept’s designs proposed. Subsequent to the concept design stage, we will either extend the initial design contracts for further iterations of more detailed designs or will award a Professional Service Contract (PSC) for the system integrator. This PSC will be for the system’s design at the plant level, system’s integration of the plant including their interfaces and performance, design and supply of the integrated control system for the plant operation.
II.2.5) Award criteria
Price
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Section IV: Procedure
IV.1) Description
IV.1.1) Type of procedure
Innovation partnership
IV.1.8) Information about Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement:
Yes
IV.2) Administrative information
IV.2.1) Previous publication concerning this procedure
Notice number in the OJ S:
2018/S 134-305918
IV.2.9) Information about termination of call for competition in the form of a prior information notice
The contracting authority will not award any further contracts based on the above prior information notice
Section V: Award of contract
Contract No: 2032210 and 2032211
Title: The Systems Architecture, Control System Design and Integration of a Tritium Processing Plant
A contract/lot is awarded:
Yes
V.2 Award of contract
V.2.1) Date of conclusion of the contract
18/07/2019
V.2.2) Information about tenders
Number of tenders received: 3
Number of tenders received from SMEs: 1
Number of tenders received from tenderers from EU Member States: 0
Number of tenders received from tenderers from non-EU Member States: 0
Number of tenders received by electronic means: 0
The contract has been awarded to a group of economic operators:
No
V.2.3) Name and address of the contractor
DBD Ltd
03118924
Warrington
WA3 6GA
UK
NUTS: UKD61
The contractor is an SME:
Yes
V.2.4) Information on value of the contract/lot (excluding VAT)
Initial estimated total value of the contract/lot:
Total value of the contract/lot:
Lowest offer:
4 972 489.00
GBP
/ Highest offer:
9 173 015.00
GBP
V.2.5) Information about subcontracting
The contract is likely to be subcontracted
Section VI: Complementary information
VI.4) Procedures for review
VI.4.1) Review body
United Kingdom Atomic Energy Authority
Abingdon
OX14 3DB
UK
VI.5) Date of dispatch of this notice
22/07/2019