Contract Award Notice

Supply of Personal Protective Equipment for Healthcare Workers for the Care of Patients with Suspected or Confirmed Novel Coronavirus (Covid-19)

  • First published: 03 July 2020
  • Last modified: 03 July 2020
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
Published by:
Manchester University NHS Foundation Trust
Authority ID:
AA74085
Publication date:
03 July 2020
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

Manchester University NHS Foundation Trust (the ‘Authority’) has awarded a contract to 3D Clean for the supply of personal protective equipment to safeguard the health and lives of the care professionals treating patients with Covid-19.

Explanation

1) The Coronavirus disease (Covid-19) is a serious infectious respiratory disease and its consequences pose a risk to life. The Covid-19 outbreak is a Public Health Emergency of International Concerns as declared by the World Health Organisation on 30 January 2020. The WHO Director General characterised Covid-19 as a pandemic on 11 March 2020, by this stage Europe was the centre of the pandemic.

2) The use of personal protective equipment (PPE) is critical in safeguarding the health and lives of the care professionals treating patients with Covid-19. Delays in procuring the PPE poses a risk to life of those on the front line and the likelihood of significantly increased death toll.

3) In March the NHS experienced severe shortages of PPE, modelling based the trajectory of other European countries forecast the need for significant and extremely rapid increase in the UK PPE capacity. Similar shortfalls in PPE stocks were identified globally. There was immense demand for PPE, requiring the UK government to actively seek and create new supply chains rapidly to meet that demand. In these circumstances, a procurement following the usual timescales under the PCR 2015, including accelerated options, was impossible. PPE manufacturers and supply chains were under immediate and unprecedented global pressure to provide products. A delay in engaging with the market by running a usual procurement process ran the risk of failing to acquire the necessary stock of PPE equipment and presenting a significant risk to life.

4) Manchester University NHS Foundation Trust (MFT) is satisfied the tests permitting use of the negotiated procedure without prior publication (Regulation 32(2)(c)) were met.

A. As far as is strictly necessary:

PPE was identified as strictly necessary to meet anticipated demand on the NHS during the first wave of cases in the UK.

B. There are genuine reasons for extreme urgency:

MFT are responding to Covid-19 immediately because of public health risks presenting a genuine emergency.

C. The events that have led to the need for extreme urgency were unforeseeable:

As the Commission itself confirmed: ‘The current Coronavirus crisis presents an extreme and unforeseeable urgency — precisely for such a situation our European rules enable public buyers to buy within a matter of days, even hours, if necessary.’ (Commissioner Breton, Internal Market, 1 April 2020).

D. It was impossible to comply with the usual timescales in the PCR:

Due to the urgency of the situation there was no time to run an accelerated procurement under the open, restricted or competitive procedures with negotiation that would allow MFT to secure delivery of products, particularly in light of the corresponding delays to timelines associated with securing supply of the PPE equipment.

E. The situation is not attributable to the contracting authority:

MFT has not caused or contributed to the Coronavirus crisis, which justifies the need for extreme urgency.

Full notice text

Contract award notice

Results of the procurement procedure

Section I: Contracting entity

I.1) Name and addresses

Manchester University NHS Foundation Trust

Finance and Procurement Business Unit, Wards 17 and 18, Trafford Hospital

Trafford

M41 5SL

UK

Contact person: Mr Phil Robinson

E-mail: Philip.Robinson@mft.nhs.uk

NUTS: UKD3

Internet address(es)

Main address: www.mft.nhs.uk

Address of the buyer profile: www.mft.nhs.uk

I.4) Type of the contracting authority

Body governed by public law

I.5) Main activity

Health

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Supply of Personal Protective Equipment for Healthcare Workers for the Care of Patients with Suspected or Confirmed Novel Coronavirus (Covid-19)

II.1.2) Main CPV code

33000000

 

II.1.3) Type of contract

Supplies

II.1.4) Short description

Manchester University NHS Foundation Trust (the ‘Authority’) has awarded a contract to 3D Clean for the supply of personal protective equipment to safeguard the health and lives of the care professionals treating patients with Covid-19.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Value excluding VAT: 2 475 000.00  GBP

II.2) Description

II.2.2) Additional CPV code(s)

18410000

33000000

II.2.3) Place of performance

NUTS code:

UKD3

II.2.4) Description of the procurement

Manchester University NHS Foundation Trust (the ‘Authority’) has awarded a contract to 3D Clean for the supply of personal protective equipment to safeguard the health and lives of the care professionals treating patients with Covid-19.

Explanation

1) The Coronavirus disease (Covid-19) is a serious infectious respiratory disease and its consequences pose a risk to life. The Covid-19 outbreak is a Public Health Emergency of International Concerns as declared by the World Health Organisation on 30 January 2020. The WHO Director General characterised Covid-19 as a pandemic on 11 March 2020, by this stage Europe was the centre of the pandemic.

2) The use of personal protective equipment (PPE) is critical in safeguarding the health and lives of the care professionals treating patients with Covid-19. Delays in procuring the PPE poses a risk to life of those on the front line and the likelihood of significantly increased death toll.

3) In March the NHS experienced severe shortages of PPE, modelling based the trajectory of other European countries forecast the need for significant and extremely rapid increase in the UK PPE capacity. Similar shortfalls in PPE stocks were identified globally. There was immense demand for PPE, requiring the UK government to actively seek and create new supply chains rapidly to meet that demand. In these circumstances, a procurement following the usual timescales under the PCR 2015, including accelerated options, was impossible. PPE manufacturers and supply chains were under immediate and unprecedented global pressure to provide products. A delay in engaging with the market by running a usual procurement process ran the risk of failing to acquire the necessary stock of PPE equipment and presenting a significant risk to life.

4) Manchester University NHS Foundation Trust (MFT) is satisfied the tests permitting use of the negotiated procedure without prior publication (Regulation 32(2)(c)) were met.

A. As far as is strictly necessary:

PPE was identified as strictly necessary to meet anticipated demand on the NHS during the first wave of cases in the UK.

B. There are genuine reasons for extreme urgency:

MFT are responding to Covid-19 immediately because of public health risks presenting a genuine emergency.

C. The events that have led to the need for extreme urgency were unforeseeable:

As the Commission itself confirmed: ‘The current Coronavirus crisis presents an extreme and unforeseeable urgency — precisely for such a situation our European rules enable public buyers to buy within a matter of days, even hours, if necessary.’ (Commissioner Breton, Internal Market, 1 April 2020).

D. It was impossible to comply with the usual timescales in the PCR:

Due to the urgency of the situation there was no time to run an accelerated procurement under the open, restricted or competitive procedures with negotiation that would allow MFT to secure delivery of products, particularly in light of the corresponding delays to timelines associated with securing supply of the PPE equipment.

E. The situation is not attributable to the contracting authority:

MFT has not caused or contributed to the Coronavirus crisis, which justifies the need for extreme urgency.

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Award of a contract without prior publication of a call for competition

Justification for selected award procedure:

No tenders or no suitable tenders/requests to participate in response to restricted procedure

Explanation

Award of a contract without prior publication of a call for competition in the Official Journal of the European Union in the cases listed below:

• extreme urgency brought about by events unforeseeable for the contracting authority and in accordance with the strict conditions stated in the directive.

See explanation in II.2.4) regarding award of a contract without prior publication of a call for competition.

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: No

Section V: Award of contract

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

21/04/2020

V.2.2) Information about tenders

Number of tenders received: 1

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

3D Clean

130 old street

London

EC1V 9BD

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : 2 475 000.00  GBP

V.2.5) Information about subcontracting

Section VI: Complementary information

VI.4) Procedures for review

VI.4.1) Review body

Manchester University NHS Foundation Trust

Trafford

UK

VI.5) Date of dispatch of this notice

01/07/2020

Coding

Commodity categories

ID Title Parent category
33000000 Medical equipments, pharmaceuticals and personal care products Materials and Products
18410000 Special clothing Special clothing and accessories

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
Philip.Robinson@mft.nhs.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.