Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Award Notice

Subsea Electric Cable Storage

  • First published: 23 July 2020
  • Last modified: 23 July 2020
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
Published by:
Scottish Hydro Electric Power Distribution plc
Authority ID:
AA77960
Publication date:
23 July 2020
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

Scottish Hydro Electric Power Distribution (SHEPD) requires a contractor to store and manage approximately 100 km of uncoilable subsea electric cable of various sizes and voltages. These cables will be used as stock for planned projects and lengths will be called- off from stock on a planned project by project basis. The collection call-offs are likely to be twice per year plus additional unplanned repair requirements, thus requiring easy access to stock for regular collections and restocking. The contractor will be responsible for all movement/unloading/loading and packing/unpacking activities at the storage site and quayside.

The standard sizes and types of cables to be stored are:

— 95 mm 11 kV copper double wire armoured cable,

— 95 mm 33 kV copper double wire armoured cable,

— 185 mm 33 kV copper double wire armoured cable,

— 300 mm 33 kV copper double wire armoured cable,

— 400 mm 33 kV copper double wire armoured cable.

SHEPD also requires a Contractor to receive and safely store a stock of accessories for use on subsea electric cable projects.

A sample of items to be stored are listed below:

— marine cable repair joints,

— onshore transition joints,

— abandonment kits and other cable caps,

— armour clamps and break out kits,

— cable pulling heads,

— fibre chambers and lids,

— fibre splice enclosures and sundries,

— earthing materials (wire, rods and clamps, etc).

SHEPD also requires a contractor to safely and securely manage the held stock of cable and accessories, test and record results for use and reference by the employer and its other contractors.

Full notice text

Contract award notice – utilities

Section I: Contracting entity

I.1) Name and addresses

Scottish Hydro Electric Power Distribution plc

SC213460

Inveralmond House, 200 Dunkeld Road

Perth

PH1 3AQ

UK

Contact person: Adam Gatens

Telephone: +44 7818970198

E-mail: adam.gatens@sse.com

NUTS: UK

Internet address(es)

Main address: www.sse.com

I.6) Main activity

Electricity

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Subsea Electric Cable Storage

Reference number: 9870

II.1.2) Main CPV code

63121100

 

II.1.3) Type of contract

Services

II.1.4) Short description

Storage and management of various sizes, voltages, and lengths of subsea electric cable and associated accessories. These cables will be used as stock for planned projects and lengths will be called-off from stock on a planned project by project basis. Stock may also be required to be called-off at short notice for repair purposes.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Value excluding VAT: 5 663 870.04  GBP

II.2) Description

II.2.3) Place of performance

NUTS code:

UK

II.2.4) Description of the procurement

Scottish Hydro Electric Power Distribution (SHEPD) requires a contractor to store and manage approximately 100 km of uncoilable subsea electric cable of various sizes and voltages. These cables will be used as stock for planned projects and lengths will be called- off from stock on a planned project by project basis. The collection call-offs are likely to be twice per year plus additional unplanned repair requirements, thus requiring easy access to stock for regular collections and restocking. The contractor will be responsible for all movement/unloading/loading and packing/unpacking activities at the storage site and quayside.

The standard sizes and types of cables to be stored are:

— 95 mm 11 kV copper double wire armoured cable,

— 95 mm 33 kV copper double wire armoured cable,

— 185 mm 33 kV copper double wire armoured cable,

— 300 mm 33 kV copper double wire armoured cable,

— 400 mm 33 kV copper double wire armoured cable.

SHEPD also requires a Contractor to receive and safely store a stock of accessories for use on subsea electric cable projects.

A sample of items to be stored are listed below:

— marine cable repair joints,

— onshore transition joints,

— abandonment kits and other cable caps,

— armour clamps and break out kits,

— cable pulling heads,

— fibre chambers and lids,

— fibre splice enclosures and sundries,

— earthing materials (wire, rods and clamps, etc).

SHEPD also requires a contractor to safely and securely manage the held stock of cable and accessories, test and record results for use and reference by the employer and its other contractors.

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Negotiated with call for competition

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: No

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2019/S 214-526408

Section V: Award of contract

Contract No: 10559

Title: Subsea Cable Storage

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

03/07/2020

V.2.2) Information about tenders

Number of tenders received: 2

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Briggs Marine Contractors Ltd

Burntisland

UK

NUTS: UK

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : 5 663 870.00  GBP

V.2.5) Information about subcontracting

Section VI: Complementary information

VI.4) Procedures for review

VI.4.1) Review body

Scottish Hydro Electric Power Distribution plc

Perth

UK

VI.5) Date of dispatch of this notice

20/07/2020

Coding

Commodity categories

ID Title Parent category
63121100 Storage services Storage and retrieval services

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
adam.gatens@sse.com
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.