Lot No: 1
II.2.1) Title
South West and Midlands (≤ GBP 100 million)
II.2.2) Additional CPV code(s)
66000000
66518100
71000000
71300000
71311000
71312000
71322000
71322500
71356200
71356300
71500000
71530000
73110000
73210000
73300000
73420000
79110000
79415200
79418000
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
South West and Midlands, England
II.2.4) Description of the procurement
Provision of TA services for the delivery of RIS 2 (https://www.gov.uk/government/collections/road-investment-strategy-post-2020) schemes with a client budget of less than or equal to £100m in the South West and Midlands regions.
There will be 1 tenderer appointed to this lot but they are not guaranteed any work or specific schemes from this tender process. Schemes allocated to this lot will be issued through a direct award to the successful tenderer for this lot or in circumstances specified in the procurement documents tendered as a mini-competition which may include the suppliers appointed to all lots. The successful tenderer for this lot may also have opportunities to win additional schemes in the rest of England in the circumstances specified in the procurement documents. Please note that the award of a scheme at PCF stage 1 does not guarantee it will proceed to PCF stage 7; a scheme can be withdrawn at any PCF stage in line with Highways England's governance procedures.
TAs will undertake the following:
During PCF Stage 1 & 2
Identify options that address the objectives stated in the Client Scheme Requirements
Develop options that comply with legislation and policy, through HE's preferred project delivery methodology (Project Control Framework(PCF), to take to public consultation
Preferred options should be deliverable, affordable and provide value for money when whole life of asset is taken into account
Undertake and record an appraisal of the performance of scheme options against key metrics with high technical assurance
Identify maintenance activities and designated fund opportunities that could be delivered during the project
Consider customer impacts arising during the enhancement and operation of the improved asset
Deliver effective stakeholder engagement and public consultation to enable a Preferred Route Announcement
Complete the schemes High Level Requirements
Facilitate, oversee and optimise the transition from Options phase to Development Phases
Realise and improve productivity and continually improve the value for money for the TA services;
Fully engage with the Regional Sustainable Improvement Hub(s), the National Community of TAs and Centre(s) of Excellence.
During PCF Stages 3 to 7
Assure against the High Level Requirements allocated to the Delivery Integration Partner (DIP) and be custodians of the preferred route intent;
Oversee and optimise the transition between PCF stage 2 and 3;
Assure the basis of the marginal gain calculations when the DIP maintains or improves the investment baseline (measured via marginal cost benefit analysis);
Support the Employer in agreement of the Budget;
Continually improve the value for money of the TA Services;
Fully engage with the Regional Centre(s) of Excellence and the National Community of TA's;
Through high quality, right first time, service delivery, support the DIP's delivery of efficiency and predictability;
Assure the DIP's delivery of successful outcomes for PCF Stages 3 to 7; and
Assure and support transition of schemes from the DIP into Operations Directorate (OD) through to completion of SGAR 7
During PCF Stages 6 & 7
Undertake the role of Supervisor to the DIP (please note the DIP is an NEC 4 based contract); and
Provide assurance for other design services that are to be completed.
Highways England will not allow a TA for a scheme to also be the DIP (framework) Principal Designer for any given scheme. A Market Share rule will be applied to the value of work any one TA can undertake during the framework. This value is £78m which represents 30 % of the overall framework value.
II.2.5) Award criteria
Price
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
Highways England reserves the right to transfer any unallocated value between lots to fund additional schemes in different geographical areas therefore when considering potential value of work which may be won by a successful technical adviser tenderers should consider the total expected value of the framework as well as of the relevant lot.
Lot No: 2
II.2.1) Title
South East and East (≤ £100m)
II.2.2) Additional CPV code(s)
66000000
66518100
71000000
71300000
71311000
71312000
71322000
71322500
71356200
71356300
71500000
71530000
73110000
73210000
73300000
73420000
79110000
79415200
79418000
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
South East and East, England
II.2.4) Description of the procurement
Provision of TA services for the delivery of RIS 2 (https://www.gov.uk/government/collections/road-investment-strategy-post-2020) schemes with a client budget of greater than £100m in the South East and East regions.
There will be 1 tenderer appointed to this lot but they are not guaranteed any work or specific schemes from this tender process. Schemes allocated to this lot will be issued through a direct award to the successful tenderer for this lot or in circumstances specified in the procurement documents tendered as a mini-competition which may include the suppliers appointed to all lots. The successful tenderer for this lot may also have opportunities to win additional schemes in the rest of England in the circumstances specified in the procurement documents. Please note that the award of a scheme at PCF stage 1 does not guarantee it will proceed to PCF stage 7; a scheme can be withdrawn at any PCF stage in line with Highways England's governance procedures.
TAs will undertake the following:
During PCF Stage 1 & 2
Identify options that address the objectives stated in the Client Scheme Requirements
Develop options that comply with legislation and policy, through HE's preferred project delivery methodology (Project Control Framework(PCF), to take to public consultation
Preferred options should be deliverable, affordable and provide value for money when whole life of asset is taken into account
Undertake and record an appraisal of the performance of scheme options against key metrics with high technical assurance
Identify maintenance activities and designated fund opportunities that could be delivered during the project
Consider customer impacts arising during the enhancement and operation of the improved asset
Deliver effective stakeholder engagement and public consultation to enable a Preferred Route Announcement
Complete the schemes High Level Requirements
Facilitate, oversee and optimise the transition from Options phase to Development Phases
Realise and improve productivity and continually improve the value for money for the TA services;
Fully engage with the Regional Sustainable Improvement Hub(s), the National Community of TAs and Centre(s) of Excellence.
During PCF Stages 3 to 7
Assure against the High Level Requirements allocated to the Delivery Integration Partner (DIP) and be custodians of the preferred route intent;
Oversee and optimise the transition between PCF stage 2 and 3;
Assure the basis of the marginal gain calculations when the DIP maintains or improves the investment baseline (measured via marginal cost benefit analysis);
Support the Employer in agreement of the Budget;
Continually improve the value for money of the TA Services;
Fully engage with the Regional Centre(s) of Excellence and the National Community of TA's;
Through high quality, right first time, service delivery, support the DIP's delivery of efficiency and predictability;
Assure the DIP's delivery of successful outcomes for PCF Stages 3 to 7; and
Assure and support transition of schemes from the DIP into Operations Directorate (OD) through to completion of SGAR 7
During PCF Stages 6 & 7
Undertake the role of Supervisor to the DIP (please note the DIP is an NEC 4 based contract); and
Provide assurance for other design services that are to be completed.
Highways England will not allow a TA for a scheme to also be the DIP (framework) Principal Designer for any given scheme. A Market Share rule will be applied to the value of work any one TA can undertake during the framework. This value is £78m which represents 30 % of the overall framework value.
II.2.5) Award criteria
Price
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
Highways England reserves the right to transfer any unallocated value between lots to fund additional schemes in different geographical areas therefore when considering potential value of work which may be won by a successful Technical Adviser Tenderers should consider the total expected value of the Framework as well as of the relevant lot.
Lot No: 3
II.2.1) Title
North East and North West (≤ £100m)
II.2.2) Additional CPV code(s)
66000000
66518100
71000000
71300000
71311000
71312000
71322000
71322500
71356200
71356300
71500000
71530000
73110000
73210000
73300000
73420000
79110000
79415200
79418000
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
North East and North West, England
II.2.4) Description of the procurement
Provision of TA services for the delivery of RIS 2 (https://www.gov.uk/government/collections/road-investment-strategy-post-2020) schemes with a client budget of less than or equal to £100m in the North East and North West regions.
There will be 1 tenderer appointed to this lot but they are not guaranteed any work or specific schemes from this tender process. Schemes allocated to this lot will be issued through a direct award to the successful tenderer for this lot or in circumstances specified in the procurement documents tendered as a mini-competition which may include the suppliers appointed to all lots. The successful tenderer for this lot may also have opportunities to win additional schemes in the rest of England in the circumstances specified in the procurement documents. Please note that the award of a scheme at PCF stage 1 does not guarantee it will proceed to PCF stage 7; a scheme can be withdrawn at any PCF stage in line with Highways England's governance procedures.
TAs will undertake the following:
During PCF Stage 1 & 2
Identify options that address the objectives stated in the Client Scheme Requirements
Develop options that comply with legislation and policy, through HE's preferred project delivery methodology (Project Control Framework(PCF), to take to public consultation
Preferred options should be deliverable, affordable and provide value for money when whole life of asset is taken into account
Undertake and record an appraisal of the performance of scheme options against key metrics with high technical assurance
Identify maintenance activities and designated fund opportunities that could be delivered during the project
Consider customer impacts arising during the enhancement and operation of the improved asset
Deliver effective stakeholder engagement and public consultation to enable a Preferred Route Announcement
Complete the schemes High Level Requirements
Facilitate, oversee and optimise the transition from Options phase to Development Phases
Realise and improve productivity and continually improve the value for money for the TA services;
Fully engage with the Regional Sustainable Improvement Hub(s), the National Community of TAs and Centre(s) of Excellence.
During PCF Stages 3 to 7
Assure against the High Level Requirements allocated to the Delivery Integration Partner (DIP) and be custodians of the preferred route intent;
Oversee and optimise the transition between PCF stage 2 and 3;
Assure the basis of the marginal gain calculations when the DIP maintains or improves the investment baseline (measured via marginal cost benefit analysis);
Support the Employer in agreement of the Budget;
Continually improve the value for money of the TA Services;
Fully engage with the Regional Centre(s) of Excellence and the National Community of TA's;
Through high quality, right first time, service delivery, support the DIP's delivery of efficiency and predictability;
Assure the DIP's delivery of successful outcomes for PCF Stages 3 to 7; and
Assure and support transition of schemes from the DIP into Operations Directorate (OD) through to completion of SGAR 7
During PCF Stages 6 & 7
Undertake the role of Supervisor to the DIP (please note the DIP is an NEC 4 based contract); and
Provide assurance for other design services that are to be completed.
Highways England will not allow a TA for a scheme to also be the DIP (framework) Principal Designer for any given scheme. A Market Share rule will be applied to the value of work any one TA can undertake during the framework. This value is £78m which represents 30 % of the overall framework value.
II.2.5) Award criteria
Price
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
Highways England reserves the right to transfer any unallocated value between lots to fund additional schemes in different geographical areas therefore when considering potential value of work which may be won by a successful Technical Adviser Tenderers should consider the total expected value of the Framework as well as of the relevant lot.
Lot No: 4
II.2.1) Title
South West & Midlands (> £100m)
II.2.2) Additional CPV code(s)
66000000
66518100
71000000
71300000
71311000
71312000
71322000
71322500
71356200
71356300
71500000
71530000
73110000
73210000
73300000
73420000
79110000
79415200
79418000
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
South West & Midlands, England
II.2.4) Description of the procurement
Provision of TA services for the delivery of RIS 2 (https://www.gov.uk/government/collections/road-investment-strategy-post-2020) schemes with a client budget of greater than £100m in the South West & Midlands regions.
There will be 1 tenderer appointed to this lot but they are not guaranteed any work or specific schemes from this tender process. Schemes allocated to this lot will be issued through a direct award to the successful tenderer for this lot or in circumstances specified in the procurement documents tendered as a mini-competition which may include the suppliers appointed to all lots. The successful tenderer for this lot may also have opportunities to win additional schemes in the rest of England in the circumstances specified in the procurement documents. Please note that the award of a scheme at PCF stage 1 does not guarantee it will proceed to PCF stage 7; a scheme can be withdrawn at any PCF stage in line with Highways England's governance procedures.
TAs will undertake the following:
During PCF Stage 1 & 2
Identify options that address the objectives stated in the Client Scheme Requirements
Develop options that comply with legislation and policy, through HE's preferred project delivery methodology (Project Control Framework(PCF), to take to public consultation
Preferred options should be deliverable, affordable and provide value for money when whole life of asset is taken into account
Undertake and record an appraisal of the performance of scheme options against key metrics with high technical assurance
Identify maintenance activities and designated fund opportunities that could be delivered during the project
Consider customer impacts arising during the enhancement and operation of the improved asset
Deliver effective stakeholder engagement and public consultation to enable a Preferred Route Announcement
Complete the schemes High Level Requirements
Facilitate, oversee and optimise the transition from Options phase to Development Phases
Realise and improve productivity and continually improve the value for money for the TA services;
Fully engage with the Regional Sustainable Improvement Hub(s), the National Community of TAs and Centre(s) of Excellence.
During PCF Stages 3 to 7
Assure against the High Level Requirements allocated to the Delivery Integration Partner (DIP) and be custodians of the preferred route intent;
Oversee and optimise the transition between PCF stage 2 and 3;
Assure the basis of the marginal gain calculations when the DIP maintains or improves the investment baseline (measured via marginal cost benefit analysis);
Support the Employer in agreement of the Budget;
Continually improve the value for money of the TA Services;
Fully engage with the Regional Centre(s) of Excellence and the National Community of TA's;
Through high quality, right first time, service delivery, support the DIP's delivery of efficiency and predictability;
Assure the DIP's delivery of successful outcomes for PCF Stages 3 to 7; and
Assure and support transition of schemes from the DIP into Operations Directorate (OD) through to completion of SGAR 7
During PCF Stages 6 & 7
Undertake the role of Supervisor to the DIP (please note the DIP is an NEC 4 based contract); and
Provide assurance for other design services that are to be completed.
Highways England will not allow a TA for a scheme to also be the DIP (framework) Principal Designer for any given scheme. A Market Share rule will be applied to the value of work any one TA can undertake during the framework. This value is £78m which represents 30 % of the overall framework value.
II.2.5) Award criteria
Price
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
Highways England reserves the right to transfer any unallocated value between lots to fund additional schemes in different geographical areas therefore when considering potential value of work which may be won by a successful Technical Adviser Tenderers should consider the total expected value of the Framework as well as of the relevant lot.
Lot No: 5
II.2.1) Title
South East and East (> £100m)
II.2.2) Additional CPV code(s)
66000000
66518100
71000000
71300000
71311000
71312000
71322000
71322500
71356200
71356300
71500000
71530000
73110000
73210000
73300000
73420000
79110000
79415200
79418000
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
South East and East, England
II.2.4) Description of the procurement
Provision of TA services for the delivery of RIS 2 (https://www.gov.uk/government/collections/road-investment-strategy-post-2020) schemes with a client budget of greater than £100m in the South East and East regions.
There will be 1 tenderer appointed to this lot but they are not guaranteed any work or specific schemes from this tender process. Schemes allocated to this lot will be issued through a direct award to the successful tenderer for this lot or in circumstances specified in the procurement documents tendered as a mini-competition which may include the suppliers appointed to all lots. The successful tenderer for this lot may also have opportunities to win additional schemes in the rest of England in the circumstances specified in the procurement documents. Please note that the award of a scheme at PCF stage 1 does not guarantee it will proceed to PCF stage 7; a scheme can be withdrawn at any PCF stage in line with Highways England's governance procedures.
TAs will undertake the following:
During PCF Stage 1 & 2
Identify options that address the objectives stated in the Client Scheme Requirements
Develop options that comply with legislation and policy, through HE's preferred project delivery methodology (Project Control Framework(PCF), to take to public consultation
Preferred options should be deliverable, affordable and provide value for money when whole life of asset is taken into account
Undertake and record an appraisal of the performance of scheme options against key metrics with high technical assurance
Identify maintenance activities and designated fund opportunities that could be delivered during the project
Consider customer impacts arising during the enhancement and operation of the improved asset
Deliver effective stakeholder engagement and public consultation to enable a Preferred Route Announcement
Complete the schemes High Level Requirements
Facilitate, oversee and optimise the transition from Options phase to Development Phases
Realise and improve productivity and continually improve the value for money for the TA services;
Fully engage with the Regional Sustainable Improvement Hub(s), the National Community of TAs and Centre(s) of Excellence.
During PCF Stages 3 to 7
Assure against the High Level Requirements allocated to the Delivery Integration Partner (DIP) and be custodians of the preferred route intent;
Oversee and optimise the transition between PCF stage 2 and 3;
Assure the basis of the marginal gain calculations when the DIP maintains or improves the investment baseline (measured via marginal cost benefit analysis);
Support the Employer in agreement of the Budget;
Continually improve the value for money of the TA Services;
Fully engage with the Regional Centre(s) of Excellence and the National Community of TA's;
Through high quality, right first time, service delivery, support the DIP's delivery of efficiency and predictability;
Assure the DIP's delivery of successful outcomes for PCF Stages 3 to 7; and
Assure and support transition of schemes from the DIP into Operations Directorate (OD) through to completion of SGAR 7
During PCF Stages 6 & 7
Undertake the role of Supervisor to the DIP (please note the DIP is an NEC 4 based contract); and
Provide assurance for other design services that are to be completed.
Highways England will not allow a TA for a scheme to also be the DIP (framework) Principal Designer for any given scheme. A Market Share rule will be applied to the value of work any one TA can undertake during the framework. This value is £78m which represents 30 % of the overall framework value.
II.2.5) Award criteria
Price
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
Highways England reserves the right to transfer any unallocated value between lots to fund additional schemes in different geographical areas therefore when considering potential value of work which may be won by a successful Technical Adviser Tenderers should consider the total expected value of the Framework as well as of the relevant lot.
Lot No: 6
II.2.1) Title
North East and North West (> £100m)
II.2.2) Additional CPV code(s)
66000000
66518100
71000000
71300000
71311000
71312000
71322000
71322500
71356200
71356300
71500000
71530000
73110000
73210000
73300000
73420000
79110000
79415200
79418000
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
North East and North West, England
II.2.4) Description of the procurement
Provision of TA services for the delivery of RIS 2 (https://www.gov.uk/government/collections/road-investment-strategy-post-2020) schemes with a client budget of greater than £100m in the North East and North West regions.
There will be 1 tenderer appointed to this lot but they are not guaranteed any work or specific schemes from this tender process. Schemes allocated to this lot will be issued through a direct award to the successful tenderer for this lot or in circumstances specified in the procurement documents tendered as a mini-competition which may include the suppliers appointed to all lots. The successful tenderer for this lot may also have opportunities to win additional schemes in the rest of England in the circumstances specified in the procurement documents. Please note that the award of a scheme at PCF stage 1 does not guarantee it will proceed to PCF stage 7; a scheme can be withdrawn at any PCF stage in line with Highways England's governance procedures.
TAs will undertake the following:
During PCF Stage 1 & 2
Identify options that address the objectives stated in the Client Scheme Requirements
Develop options that comply with legislation and policy, through HE's preferred project delivery methodology (Project Control Framework(PCF), to take to public consultation
Preferred options should be deliverable, affordable and provide value for money when whole life of asset is taken into account
Undertake and record an appraisal of the performance of scheme options against key metrics with high technical assurance
Identify maintenance activities and designated fund opportunities that could be delivered during the project
Consider customer impacts arising during the enhancement and operation of the improved asset
Deliver effective stakeholder engagement and public consultation to enable a Preferred Route Announcement
Complete the schemes High Level Requirements
Facilitate, oversee and optimise the transition from Options phase to Development Phases
Realise and improve productivity and continually improve the value for money for the TA services;
Fully engage with the Regional Sustainable Improvement Hub(s), the National Community of TAs and Centre(s) of Excellence.
During PCF Stages 3 to 7
Assure against the High Level Requirements allocated to the Delivery Integration Partner (DIP) and be custodians of the preferred route intent;
Oversee and optimise the transition between PCF stage 2 and 3;
Assure the basis of the marginal gain calculations when the DIP maintains or improves the investment baseline (measured via marginal cost benefit analysis);
Support the Employer in agreement of the Budget;
Continually improve the value for money of the TA Services;
Fully engage with the Regional Centre(s) of Excellence and the National Community of TA's;
Through high quality, right first time, service delivery, support the DIP's delivery of efficiency and predictability;
Assure the DIP's delivery of successful outcomes for PCF Stages 3 to 7; and
Assure and support transition of schemes from the DIP into Operations Directorate (OD) through to completion of SGAR 7
During PCF Stages 6 & 7
Undertake the role of Supervisor to the DIP (please note the DIP is an NEC 4 based contract); and
Provide assurance for other design services that are to be completed.
Highways England will not allow a TA for a scheme to also be the DIP (framework) Principal Designer for any given scheme. A Market Share rule will be applied to the value of work any one TA can undertake during the framework. This value is £78m which represents 30 % of the overall framework value.
II.2.5) Award criteria
Price
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
Highways England reserves the right to transfer any unallocated value between lots to fund additional schemes in different geographical areas therefore when considering potential value of work which may be won by a successful Technical Adviser Tenderers should consider the total expected value of the Framework as well as of the relevant lot.
The contract has been awarded to a group of economic operators:
Yes
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No