CONTRACT NOTICE – NATIONAL
|
WORKS |
1 Authority Details
|
1.1
|
Authority Name and Address
|
|
Green Cat Renewables |
Stobo House, |
Roslin |
EH25 9RE |
UK |
Nathan Wilson |
+44 1315410060 |
nathan.wilson@greencatrenewables.co.uk |
|
https://www.sell2wales.gov.wales https://www.sell2wales.gov.wales |
|
1.2
|
Address from which documentation may be obtained
As in 1.1
|
1.3
|
Completed documents must be returned to:
As in 1.1
|
2 Contract Details
|
2.1
|
Title
Penrhiw Wind Turbine
|
2.2
|
Description of the goods or services required
Penrhiw Wind Turbine project, being led by the Community Benefit Society YnNi Teg, consists of the construction of a single 800kW turbine. The proposed development site is located near Aberaeron, Ceredigion; the local planning association is the Ceredigion County Council.
The proposed project will consist of the supply, delivery, erection, and commissioning of a refurbished Enercon E48 turbine (77m tip height); as well as the construction of associated access roads, turbine foundations, crane hardstandings, buried cables and a substation building.
NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=153009.
The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx.
Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.
|
2.3
|
Notice Coding and Classification
|
|
|
|
|
09310000 |
|
Electricity |
|
31121320 |
|
Wind turbines |
|
45200000 |
|
Works for complete or part construction and civil engineering work |
|
45315100 |
|
Electrical engineering installation works |
|
71000000 |
|
Architectural, construction, engineering and inspection services |
|
|
|
|
|
1014 |
|
South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion) |
|
2.4
|
Total quantity or scope of tender
Principal contractor and balance of plant, as well as on-site electrical engineering works for a single EWT turbine with a 77m tip height.
|
3 Conditions for Participation
|
3.1
|
Minimum standards and qualification required
The provision of all noted documentation as described in the returnable schedule.
|
4 Administrative Information
|
4.1
|
Type of Procedure
Single stage
|
4.2
|
Reference number attributed to the notice by the contracting authority
N/a
|
4.3
|
Time LimitsTime-limit for receipt of completed tenders
 Â
 01-08-2025
 Time  17:00
Estimated award date  15-08-2025 |
4.5
|
Language or languages in which tenders or requests to participate can be drawn upENÂ
|
4.6
|
Tender Submission Postbox
The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at
https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx |
5 Other Information
|
5.1
|
Additional Information
(WA Ref:153009)
The buyer considers that this contract is suitable for consortia bidding.
|
5.2
|
Additional Documentation
|
|
B7194-1302 - Penrhiw Wind Turbine - Scope V1.1 |
|
B7194-GCR-RD-GA-DR-P-0001_P01 Site Signage |
|
B7914-GCR-DR-GA-DR-P-0001_P01 Drainage Strategy |
|
B7914-GCR-RD-DT-DR-P-0001_P01 Construction Details |
|
B7914-GCR-RD-DT-DR-P-0001_P01 Site Entrance Details |
|
B7914-GCR-RD-SX-DR-P-0001_P01 Site Sections |
|
B7914-GCR-RD-SX-DR-P-0001_P01 Track Sections |
|
B7914-GCR-RD-VL-DR-P-0001_P01 Site Volumes |
|
B7914-GCR-XX-DT-DR-P-0001_P01 Foundation Ducting |
|
B7914-GCR-XX-DT-DR-P-0001_P01 Foundation Earthing |
|
A3L_Penrhiw Fach_Location_v8 |
|
E05770-DWP-Penrhiw Site Layout-V6-20230814-RK |
|
Penrhiw Fach Trial Run R1 27032023 BHO |
|
Penrhiw Planning Inspectorate Decision - 14.01.16 306 3808 |
|
20250416_BiW_SecondWindEnergy_TSA_R03 |
|
Enercon E-48, 50m Hub Height - Elevation Plan |
|
Foundation Formwork Design, E48, 50m tower, With Bouyancy |
|
NEW - Access roads and crane platforms 50m tower |
|
4445371 V3 Variation Letter, Penrhiw Fach, 949kW |
|
CD4445371 V3 - Customer Plan |
|
Connection_Charge_Breakdown_v1_1723508_3 |
|
Penrhiw Fach Curtailment Report |
|
B7194-1302 - Penrhiw Wind Turbine - Progress Reporting V1.0 |
|
B7194-1302 - Penrhiw Wind Turbine - Pre Construction Information V1.1 |
|
5611 Penrhiw GCR GI report |
|
B7194-1302 - Penrhiw Wind Turbine - Service Search Results V1.0 |
|
B7194-1302 - Penrhiw Wind Turbine - Preface V1.2 |
|
B7194-1302 - Penrhiw Wind Turbine - Activity Schedule V1.0 |
|
B7194-1302 - Penrhiw Wind Turbine - Additional Rates V1.0 |
|
B7194-1302 - Penrhiw Wind Turbine - Returnable Schedule V1.0 |
|
Enercon E48 Oerel SWG nameplate |
|
|
5.3
|
Publication date of this notice 04-07-2025 |