Description of the contract
Isolation and removal of existing mains cabling from existing Dairy.
Connect the existing Dairy to the existing sites split phase supplier’s facility connection
Installation of additional cabling from new cable joint to new rotary milking parlour intake
position, this cable will be buried underground in a trench with the trench works completed by
the on-site engineers
At the new Rotary palours intake position, there will be an isolation switch fuse and earthing
facility for the new distribution equipment.
A 24way 250a three phase and neutral isobar board has been allowe.
All cabling will be installed in Pvc/swa to each of the positions, with either underground cabling
ducts installed by others, or metal containment supporting the cabling to its required final
position locations
17th Edition Electronic NICEIC Certification on completion of the works
|