A77 Maybole Bypass

  • First published: 10 June 2019
  • Last modified: 10 June 2019
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
Published by:
Transport Scotland
Authority ID:
AA20202
Publication date:
10 June 2019
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

Transport Scotland on behalf of the Scottish Ministers have appointed Wills Bros Civil Engineering Limited (WBCEL) to design and build the A77 Maybole Bypass in South Ayrshire, (the ‘Contract’). It is intended that the contract will include the design and construction of the works. The construction will last approximately 24 months, followed by a 5-year period of maintenance for landscaping and defect rectification.

The contract has been entered into between the Scottish Ministers and WBCEL.

The contract terms and conditions are based upon Transport Scotland's bespoke design and build contract.

The scope of the works will include, but not be limited to:

— design and construction of single carriageway (S2) bypass including roundabouts at tie-ins with existing A77,

— design and construction of associated structures including overbridges, underbridges, underpass and culverts,

— design and construction of new side roads associated with the bypass,

— diversionary works for statutory undertakings,

— environmental and landscaping mitigation measures,

— construction of a Sustainable Drainage System (SuDS) including retention basins and swales,

— stopping up of existing direct accesses and alternative provision made with alternative new means of access,

— traffic management,

— accommodation works, and

— all other works associated with a trunk road improvement.

Project Bank Account

The project will operate a mandatory Project Bank Account (PBA), a project specific account ring fenced with effective Trust status, for payment of the contractor and his supply chain. The account shall be opened by the Scottish Ministers with the Royal Bank of Scotland under the banking services framework defined at:

http://www.gov.scot/Topics/Government/Procurement/directory/pscontractcentgovt/BankingServices and in addition the PBA shall satisfy the minimum requirements for an effectively constituted Trust under Scots law. The use of a PBA by the WBCEL shall be a contractual requirement. Any sub-contractors for which it is agreed shall not be paid through the PBA shall be entitled to payment according to the prompt payment provisions provided within the contract.

Full notice text

Contract award notice

Results of the procurement procedure

Section I: Contracting entity

I.1) Name and addresses

Transport Scotland

Buchanan House, 58 Port Dundas Road

Glasgow

G4 0HF

UK

Telephone: +44 1412727100

E-mail: Chris.carroll@transport.gov.scot

Fax: +44 1412727272

NUTS: UKM82

Internet address(es)

Main address: http://www.transport.gov.scot

Address of the buyer profile: http://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00099

I.2) Joint procurement

The contract is awarded by a central purchasing body

I.4) Type of the contracting authority

National or federal agency/office

I.5) Main activity

Other: Transport

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

A77 Maybole Bypass

Reference number: TS/MTRIPS/WKS/2017/05

II.1.2) Main CPV code

45233100

 

II.1.3) Type of contract

Works

II.1.4) Short description

Design, construction, completion and maintenance of new 5 km (approximately) single carriageway (S2) bypass to the north-west of Maybole with roundabouts at the tie-ins to the existing A77, 2 overbridges, 1 underbridge and an underpass.

Works include, but are not limited to bridges, structures, fencing, drainage, earthworks, road pavement, road signs and markings, road restraint systems, accommodation works, lighting, public utilities diversions, accommodation works, environmental mitigation and a 5 year maintenance period for landscaping and defect rectification following completion. The successful tenderer will not be required to carry out cyclic maintenance.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Value excluding VAT: 28 931 322.95  GBP

II.2) Description

II.2.2) Additional CPV code(s)

45221220

45221111

45233120

45233124

45233125

45233226

45233128

45233140

II.2.3) Place of performance

NUTS code:

UKM94

II.2.4) Description of the procurement

Transport Scotland on behalf of the Scottish Ministers have appointed Wills Bros Civil Engineering Limited (WBCEL) to design and build the A77 Maybole Bypass in South Ayrshire, (the ‘Contract’). It is intended that the contract will include the design and construction of the works. The construction will last approximately 24 months, followed by a 5-year period of maintenance for landscaping and defect rectification.

The contract has been entered into between the Scottish Ministers and WBCEL.

The contract terms and conditions are based upon Transport Scotland's bespoke design and build contract.

The scope of the works will include, but not be limited to:

— design and construction of single carriageway (S2) bypass including roundabouts at tie-ins with existing A77,

— design and construction of associated structures including overbridges, underbridges, underpass and culverts,

— design and construction of new side roads associated with the bypass,

— diversionary works for statutory undertakings,

— environmental and landscaping mitigation measures,

— construction of a Sustainable Drainage System (SuDS) including retention basins and swales,

— stopping up of existing direct accesses and alternative provision made with alternative new means of access,

— traffic management,

— accommodation works, and

— all other works associated with a trunk road improvement.

Project Bank Account

The project will operate a mandatory Project Bank Account (PBA), a project specific account ring fenced with effective Trust status, for payment of the contractor and his supply chain. The account shall be opened by the Scottish Ministers with the Royal Bank of Scotland under the banking services framework defined at:

http://www.gov.scot/Topics/Government/Procurement/directory/pscontractcentgovt/BankingServices and in addition the PBA shall satisfy the minimum requirements for an effectively constituted Trust under Scots law. The use of a PBA by the WBCEL shall be a contractual requirement. Any sub-contractors for which it is agreed shall not be paid through the PBA shall be entitled to payment according to the prompt payment provisions provided within the contract.

II.2.5) Award criteria

Quality criterion: The tenderer’s approach to: scheme management; stakeholder engagement; environmental impact mitigation; and traffic management measures / Weighting: 30 %

Cost criterion: Final tenders will be assessed against evaluation criteria to determine the most economically advantageous submission. Further information will be included in the tender documents. / Weighting: 70 %

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Competitive dialogue

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2017/S 167-343003

Section V: Award of contract

Contract No: TS/MTRIPS/WKS/2017/05

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

12/04/2019

V.2.2) Information about tenders

Number of tenders received: 3

Number of tenders received from SMEs: 1

Number of tenders received from tenderers from EU Member States: 0

Number of tenders received from tenderers from non-EU Member States: 0

Number of tenders received by electronic means: 0

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Wills Bros Civil Engineering Ltd

Maxim 3, Maxim Business Park

Motherwell

ML1 4WQ

UK

Telephone: +44 1698479230

Fax: +44 1698479230

NUTS: UK

The contractor is an SME: Yes

V.2.4) Information on value of the contract/lot (excluding VAT)

Initial estimated total value of the contract/lot:

Total value of the contract/lot: : 28 931 322.95  GBP

V.2.5) Information about subcontracting

Section VI: Complementary information

VI.3) Additional information

(SC Ref:583510)

VI.4) Procedures for review

VI.4.1) Review body

Transport Scotland

Buchanan House, 58 Port Dundas Road

Glasgow

G4 0HF

UK

Telephone: +44 1412727100

Fax: +44 1412727272

Internet address(es)

URL: http://www.transport.gov.scot

VI.5) Date of dispatch of this notice

05/06/2019

Coding

Commodity categories

ID Title Parent category
45233226 Access road construction work Construction, foundation and surface works for highways, roads
45233100 Construction work for highways, roads Construction, foundation and surface works for highways, roads
45221220 Culverts Construction work for bridges and tunnels, shafts and subways
45221111 Road bridge construction work Construction work for bridges and tunnels, shafts and subways
45233120 Road construction works Construction, foundation and surface works for highways, roads
45233125 Road junction construction work Construction, foundation and surface works for highways, roads
45233140 Roadworks Construction, foundation and surface works for highways, roads
45233128 Roundabout construction work Construction, foundation and surface works for highways, roads
45233124 Trunk road construction work Construction, foundation and surface works for highways, roads

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
Chris.carroll@transport.gov.scot
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.