Contract Award Notice

Hawick Flood Protection Scheme — Main Works

  • First published: 18 June 2020
  • Last modified: 18 June 2020
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
Published by:
Scottish Borders Council
Authority ID:
AA21029
Publication date:
18 June 2020
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The Hawick Flood Protection Scheme (HFPS) will provide a significant benefit to the residents and businesses of Hawick by virtue of alleviating the effects of a major flood event in the River Teviot. The town has suffered from flooding in the recent past, including large numbers of properties inundated in 2005 and 2015, causing significant economic and human adverse effects. The HFPS will comprise the construction of nearly 6 km of entirely new flood defences, the great majority of which are flood defence walls. The walls will generally be sheet pile cored to a depth of between 4 and 12 m below ground level, with reinforced concrete pile cap and stem. Exposed concrete will either be clad in natural stone or finished with a formlined pattern. Around 60 glass panels, each 2.5 m wide and up to 1.4 m deep are to be set into the floodwalls. Approximately 1.8 km of the defences will require to be constructed directly within the watercourse. A short section of embankment will comprise a sheet pile core with locally won granular shoulders. Eight entirely new automatic surface water pumping stations will provide further protection, comprising wet wells up to 6 m deep and 5 m diameter, valve chambers up to 4 m deep and 6 m diameter and GRP kiosks to house the power and control units. The MEICA design for the surface water pumping stations will be the main contractor design element. The discharge capacity of the submersible pumps will vary within each pumping station, with the largest requiring to deliver up to 450 l/s. A ninth pumping station will be required within the Hawick waste water treatment works to assist the works during high flows and flood events, with submersible pumps capable of delivering up to 1100 l/s of storm water. Approximately 275 m and 185 m of new culvert will be required to discharge the Stirches and Boosie Burns respectively into the River Teviot. Requirement to install 9 new single leaf lift hinge floodgates within the flood defences to maintain pedestrian and vehicle access and 2 sets of stop log type demountable barriers are also required. The existing Lawson, Victoria and Mansfield steel truss footbridges will, as a minimum, require to be raised by 1.0 m, 1.0 m and 0.4 m respectively at their current location, comprising new abutments and extension legs welded to the deck supports at midspan. The current preferred option which is currently subject to Sustrans funding confirmation, is to remove the existing bridges from their supports and replace with entirely new steel truss structures at new locations, with deck widths up to 4.0m wide. If Sustrans funding is confirmed, the new bridges will be part of a new 7.0 km combined pedestrian and cycle route throughout Hawick, which will be delivered by this procurement excercise. The replacement bridge option will be the scenario which is to be priced as part of this procurement exercise. Further details of the work description are appended to the ESPD.

Construction of the HFPS will be subject to a number of environmental and pedestrian / traffic management constraints, including restrictions on the time of year when works can be carried out within or adjacent to the river channel in order to reduce the impacts on salmon migration, and restrictions on which roads and footpaths can be closed simultaneously.

The Council are currently carrying out an advance works contract which comprises the diversion of a large number of existing public utilities and the felling of the majority of trees which may be impacted by construction of the project. This procurement exercise will still require the protection and small scale diversion of some public utilities and a small amount of tree felling.

The Council intend to appoint a main contractor to carry out the construction of this project under the terms and conditions of NEC3 (Engineering and Construction Contract) Option A contract.

Full notice text

Contract award notice

Results of the procurement procedure

Section I: Contracting entity

I.1) Name and addresses

Scottish Borders Council

Council Headquarters

Newtown St Boswells

TD6 0SA

UK

Telephone: +44 1835824000

E-mail: procurement@scotborders.gov.uk

Fax: +44 1835825150

NUTS: UK

Internet address(es)

Main address: http://www.scotborders.gov.uk

Address of the buyer profile: https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00394

I.4) Type of the contracting authority

Regional or local authority

I.5) Main activity

Environment

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Hawick Flood Protection Scheme — Main Works

Reference number: SBC/CPS/1595

II.1.2) Main CPV code

45000000

 

II.1.3) Type of contract

Works

II.1.4) Short description

Scottish Borders Council (the Council) intends to take forward a series of flood protection measures in Hawick town centre which will protect over 900 business and residential properties against the effects of the 1 in 75-year flood event in the River Teviot. The works will comprise around 6 km of flood defences walls and embankments, new culverts, surface water pumping stations, Hawick waste water treatment works pumping station, replacement of 3 footbridges and the provision of new landscaping and reinstatement of the riparian corridor. Further details of the proposals, including a list of organisations who have registered an interest in becoming part of the multi layered supply chain that will deliver this project can be found at www.hawickfloodscheme.com.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Value excluding VAT: 52 204 975.18  GBP

II.2) Description

II.2.2) Additional CPV code(s)

45000000

45246000

45246400

45246410

44212382

42131143

45200000

45220000

71300000

45246200

45247212

45247270

45223200

45262640

II.2.3) Place of performance

NUTS code:

UKM91


Main site or place of performance:

Hawick — Scottish Borders TD9.

II.2.4) Description of the procurement

The Hawick Flood Protection Scheme (HFPS) will provide a significant benefit to the residents and businesses of Hawick by virtue of alleviating the effects of a major flood event in the River Teviot. The town has suffered from flooding in the recent past, including large numbers of properties inundated in 2005 and 2015, causing significant economic and human adverse effects. The HFPS will comprise the construction of nearly 6 km of entirely new flood defences, the great majority of which are flood defence walls. The walls will generally be sheet pile cored to a depth of between 4 and 12 m below ground level, with reinforced concrete pile cap and stem. Exposed concrete will either be clad in natural stone or finished with a formlined pattern. Around 60 glass panels, each 2.5 m wide and up to 1.4 m deep are to be set into the floodwalls. Approximately 1.8 km of the defences will require to be constructed directly within the watercourse. A short section of embankment will comprise a sheet pile core with locally won granular shoulders. Eight entirely new automatic surface water pumping stations will provide further protection, comprising wet wells up to 6 m deep and 5 m diameter, valve chambers up to 4 m deep and 6 m diameter and GRP kiosks to house the power and control units. The MEICA design for the surface water pumping stations will be the main contractor design element. The discharge capacity of the submersible pumps will vary within each pumping station, with the largest requiring to deliver up to 450 l/s. A ninth pumping station will be required within the Hawick waste water treatment works to assist the works during high flows and flood events, with submersible pumps capable of delivering up to 1100 l/s of storm water. Approximately 275 m and 185 m of new culvert will be required to discharge the Stirches and Boosie Burns respectively into the River Teviot. Requirement to install 9 new single leaf lift hinge floodgates within the flood defences to maintain pedestrian and vehicle access and 2 sets of stop log type demountable barriers are also required. The existing Lawson, Victoria and Mansfield steel truss footbridges will, as a minimum, require to be raised by 1.0 m, 1.0 m and 0.4 m respectively at their current location, comprising new abutments and extension legs welded to the deck supports at midspan. The current preferred option which is currently subject to Sustrans funding confirmation, is to remove the existing bridges from their supports and replace with entirely new steel truss structures at new locations, with deck widths up to 4.0m wide. If Sustrans funding is confirmed, the new bridges will be part of a new 7.0 km combined pedestrian and cycle route throughout Hawick, which will be delivered by this procurement excercise. The replacement bridge option will be the scenario which is to be priced as part of this procurement exercise. Further details of the work description are appended to the ESPD.

Construction of the HFPS will be subject to a number of environmental and pedestrian / traffic management constraints, including restrictions on the time of year when works can be carried out within or adjacent to the river channel in order to reduce the impacts on salmon migration, and restrictions on which roads and footpaths can be closed simultaneously.

The Council are currently carrying out an advance works contract which comprises the diversion of a large number of existing public utilities and the felling of the majority of trees which may be impacted by construction of the project. This procurement exercise will still require the protection and small scale diversion of some public utilities and a small amount of tree felling.

The Council intend to appoint a main contractor to carry out the construction of this project under the terms and conditions of NEC3 (Engineering and Construction Contract) Option A contract.

II.2.5) Award criteria

Quality criterion: Key Contract Personnel / Weighting: 20

Quality criterion: Project Specific Method Statements / Weighting: 21

Quality criterion: Contractor’s Tender Programme / Weighting: 11

Quality criterion: Risk and Constraint Management / Weighting: 10

Quality criterion: Communication and Public Liaison / Weighting: 10

Quality criterion: Contractor Design Elements / Weighting: 5

Quality criterion: Construction Phase Health & Safety Plan / Weighting: 5

Quality criterion: Subcontractors & Supply Chain / Weighting: 5

Quality criterion: Environmental Acceptability & Sustainability / Weighting: 5

Quality criterion: Tender Presentation / Weighting: 5

Quality criterion: Community Benefits / Weighting: 2

Quality criterion: Fair Work Practices / Weighting: 1

Price / Weighting:  50

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Restricted procedure

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2019/S 058-132930

Section V: Award of contract

Contract No: SBC/CPS/1595

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

08/05/2020

V.2.2) Information about tenders

Number of tenders received: 3

Number of tenders received from SMEs: 0

Number of tenders received from tenderers from EU Member States: 0

Number of tenders received from tenderers from non-EU Member States: 0

Number of tenders received by electronic means: 3

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

McLaughlin & Harvey

15 Trench Road, Mallusk

Newtownabbey

BT36 4TY

UK

NUTS: UKN0

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : 52 204 975.18  GBP

V.2.5) Information about subcontracting

Section VI: Complementary information

VI.3) Additional information

Economic operators may be excluded from this competition if they are in any of the situations referred to in regulation 58 of the Public Contracts (Scotland) Regulations 2015.

Bidders should note that when it is judged by the Council (at their sole discretion) to be appropriate the Council will collaborate with relevant bodies (including Police Scotland) to actively share significant elements of information provided and detailed in this response.

Bidders shall ensure all relevant certificates, insurances etc. are up to date.

If the tender is from a consortium, please note that only one tender from the consortium, nominating a lead organisation (which will be responsible for administration of the contract and in which regard shall also act as the central point for payment purposes), will be accepted. The full names, designations, and current addresses of all members of the consortium and the lead organisation will require to be submitted. In addition all members of the consortium will be required to execute the contract together with all ancillary documentation, evidencing their joint and several liability in respect of the obligations and liabilities of the contract. Aside from the foregoing, it will otherwise generally be for the members of the consortium to sort out their respective liabilities amongst each other.

Once shortlisting has been completed for stage 1 the following documents will be required:

Evidence of your company's insurance certification detailing the required level of insurance as per the levels stated within the contract notice.

A completed copy of the following forms:

Certificate of non collusion, canvassing and declaration

Freedom of information

Non involvement in serious crime declaration.

The Council reserves the right to enter into a negotiated value engineering exercise with suitable tenders if it considers it appropriate.

Should there be an insufficient number of candidates meeting the selection criteria to enable genuine competition then the Council may use a negotiated procedure without further publication of a contract notice.

Any change in circumstance, or change in information provided, following the submission of the ESPD, shall be notified by the tenderer to the Council as soon as practicable. The Council reserves the right to request additional information regarding this change. The Council reserves the right to reject or disqualify a tenderer where there is a change in identity, control, financial standing or other factors impacting on the selection or evaluation process affecting the tender.

The Council reserves the right not to award a contract without liability on its part.

(SC Ref:621597)

VI.4) Procedures for review

VI.4.1) Review body

Jedburgh Sherriff Court and Justice of the Peace Court

Sheriff Court House, Castlegate

Jedburgh

TD8 6AR

UK

VI.4.3) Review procedure

Precise information on deadline(s) for review procedures:

Scottish Borders Council will incorporate a minimum 10 day standstill period at the point of information on the award of the contract is communicated to tenderers. The Public Contract (Scotland) Regulations 2015 (SSI, 2015 No 446) provide for aggrieved parties who have been harmed or at risk of harm by a breach of the rule to take action in the Sheriff Court or Court of Session. A claim for an ineffectiveness order must be made within 30 days of the Contract Award being published on the OJEU or within 30 days of the date to those who expressed an interest in or otherwise bid for the contract were informed of the conclusion of the contract or in any other case within 6 months from the date on which the contract was entered into.

VI.5) Date of dispatch of this notice

17/06/2020

Coding

Commodity categories

ID Title Parent category
45000000 Construction work Construction and Real Estate
45247212 Dam-reinforcement works Construction work for dams, canals, irrigation channels and aqueducts
71300000 Engineering services Architectural, construction, engineering and inspection services
45220000 Engineering works and construction works Works for complete or part construction and civil engineering work
45262640 Environmental improvement works Special trade construction works other than roof works
42131143 Flood-control valves Taps, cocks and valves
45246410 Flood-defences maintenance works River regulation and flood control works
44212382 Floodgates Structural products and parts except prefabricated buildings
45246400 Flood-prevention works River regulation and flood control works
45247270 Reservoir construction works Construction work for dams, canals, irrigation channels and aqueducts
45246000 River regulation and flood control works Construction work for water projects
45246200 Riverbank protection works River regulation and flood control works
45223200 Structural works Structures construction work
45200000 Works for complete or part construction and civil engineering work Construction work

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
procurement@scotborders.gov.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.