Contract Notice

Terminal and Amenities Building Expansion

  • First published: 21 June 2022
  • Last modified: 21 June 2022
  • Version: N/A
  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Information icon
You are viewing an expired notice.

Contents

Summary

OCID:
ocds-h6vhtk-03487b
Published by:
London Gateway Port Limited
Authority ID:
AA80648
Publication date:
21 June 2022
Deadline date:
26 July 2022
Notice type:
Contract Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

London Gateway Port Limited is planning to extend the existing Terminal Building and Amenities Building at the Port. The two buildings are located within the operational area of the Port and they shall continue to be occupied and operational during construction stage. Access for people and port vehicles/cranes/equipment to both buildings shall be maintained. The existing Terminal Building (TB) is a steel framed building comprises a four-storey office area located at the centre of the TB. To the north of the TB is a single-storey Internal Mobile Vehicle (IMV) workshop with a two-storey store and to the south is a single-storey Shuttle Carrier (SHC) workshop. The existing Amenities Building (AB) is a three-storey steel framed building that provides toilets, changing rooms/locker facilities, canteen, gym and office. Both of TB and AB have a BREEAM rating of “Very Good” under the NC2011 technical standard.

The Terminal Building extension includes but is not limited to

- a four-storey extension of circa total 1,200 sq.m. floor area to office area;

- two repair bays of one-storey 15m high circa 650 sq.m. floor area to IMV workshop;

- two repair bays of one-storey 20m high circa 650 sq.m. floor area to SHC workshop;

- an overhead crane to the external repair bays;

- an oil storage extension;

- a new grease pit;

- extension of existing climate controlled room;

- modification of existing office areas.

The Amenities Building extension includes but is not limited to

- a three-storey extension of circa total 600 sq.m. floor area to the east of the Amenities Building.

The tentative commencement of site works will be October 2022. The time for completion of the works is 8 months.

Full notice text

Contract notice – utilities

Section I: Contracting entity

I.1) Name and addresses

London Gateway Port Limited

No 1 London Gateway

Stanford-le-hope

SS17 9DY

UK

Contact person: Oluchi Nwaiwu

Telephone: +44 1375648441

E-mail: oluchi.nwaiwu@dpworld.com

NUTS: UKH32

Internet address(es)

Main address: https://dpworld.tejari.com

I.3) Communication

The procurement documents are available for unrestricted and full direct access, free of charge at:

https://dpworld.tejari.com


Additional information can be obtained from the abovementioned address


Tenders or requests to participate must be sent electronically to:

https://dpworld.tejari.com


Tenders or requests to participate must be sent to the abovementioned address


I.6) Main activity

Port-related activities

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Terminal and Amenities Building Expansion

Reference number: C4506

II.1.2) Main CPV code

45000000

 

II.1.3) Type of contract

Works

II.1.4) Short description

London Gateway Port Limited is planning to extend the existing Terminal Building and Amenities Building at the Port. The two buildings are located within the operational area of the Port and they shall continue to be occupied and operational during construction stage. Access for people and port vehicles/cranes/equipment to both buildings shall be maintained. The existing Terminal Building (TB) is a steel framed building comprises a four-storey office area located at the centre of the TB. To the north of the TB is a single-storey Internal Mobile Vehicle (IMV) workshop with a two-storey store and to the south is a single-storey Shuttle Carrier (SHC) workshop. The existing Amenities Building (AB) is a three-storey steel framed building that provides toilets, changing rooms/locker facilities, canteen, gym and office. Both of TB and AB have a BREEAM rating of “Very Good” under the NC2011 technical standard.

The Terminal Building extension includes but is not limited to

- a four-storey extension of circa total 1,200 sq.m. floor area to office area;

- two repair bays of one-storey 15m high circa 650 sq.m. floor area to IMV workshop;

- two repair bays of one-storey 20m high circa 650 sq.m. floor area to SHC workshop;

- an overhead crane to the external repair bays;

- an oil storage extension;

- a new grease pit;

- extension of existing climate controlled room;

- modification of existing office areas.

The Amenities Building extension includes but is not limited to

- a three-storey extension of circa total 600 sq.m. floor area to the east of the Amenities Building.

The tentative commencement of site works will be October 2022. The time for completion of the works is 8 months.

II.1.6) Information about lots

This contract is divided into lots: No

II.2) Description

II.2.2) Additional CPV code(s)

45210000

II.2.3) Place of performance

NUTS code:

UKH32

II.2.4) Description of the procurement

London Gateway Port Limited is planning to extend the existing Terminal Building and Amenities Building at the Port. The two buildings are located within the operational area of the Port and they shall continue to be occupied and operational during construction stage. Access for people and port vehicles/cranes/equipment to both buildings shall be maintained. The existing Terminal Building (TB) is a steel framed building comprises a four-storey office area located at the centre of the TB. To the north of the TB is a single-storey Internal Mobile Vehicle (IMV) workshop with a two-storey store and to the south is a single-storey Shuttle Carrier (SHC) workshop. The existing Amenities Building (AB) is a three-storey steel framed building that provides toilets, changing rooms/locker facilities, canteen, gym and office. Both of TB and AB have a BREEAM rating of “Very Good” under the NC2011 technical standard.

The Terminal Building extension includes but is not limited to

- a four-storey extension of circa total 1,200 sq.m. floor area to office area;

- two repair bays of one-storey 15m high circa 650 sq.m. floor area to IMV workshop;

- two repair bays of one-storey 20m high circa 650 sq.m. floor area to SHC workshop;

- an overhead crane to the external repair bays;

- an oil storage extension;

- a new grease pit;

- extension of existing climate controlled room;

- modification of existing office areas.

The Amenities Building extension includes but is not limited to

- a three-storey extension of circa total 600 sq.m. floor area to the east of the Amenities Building.

The tentative commencement of site works will be October 2022. The time for completion of the works is 8 months.

II.2.5) Award criteria

Price is not the only award criterion and all criteria are stated only in the procurement documents

II.2.7) Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 8

This contract is subject to renewal: No

II.2.10) Information about variants

Variants will be accepted: No

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Restricted procedure

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

IV.2) Administrative information

IV.2.2) Time limit for receipt of tenders or requests to participate

Date: 26/07/2022

Local time: 23:59

IV.2.3) Estimated date of dispatch of invitations to tender or to participate to selected candidates

Date: 08/08/2022

IV.2.4) Languages in which tenders or requests to participate may be submitted

EN

IV.2.6) Minimum time frame during which the tenderer must maintain the tender

Duration in months: 9 (from the date stated for receipt of tender)

Section VI: Complementary information

VI.1) Information about recurrence

This is a recurrent procurement: No

VI.2) Information about electronic workflows

Electronic ordering will be used

Electronic invoicing will be accepted

Electronic payment will be used

VI.4) Procedures for review

VI.4.1) Review body

London Gateway Port Limited

No 1 London Gateway

Stanford-le-hope

SS17 9DY

UK

E-mail: oluchi.nwaiwu@dpworld.com

VI.5) Date of dispatch of this notice

20/06/2022

Coding

Commodity categories

ID Title Parent category
45210000 Building construction work Works for complete or part construction and civil engineering work
45000000 Construction work Construction and Real Estate

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
oluchi.nwaiwu@dpworld.com
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.