Contract award notice – utilities
Section I: Contracting
entity
I.1) Name and addresses
London Underground Limited (LUL)
5 Endeavour Square
London
E20 1JN
UK
Telephone: +44 2070384000
E-mail: DTUPEngagements@tfl.gov.uk
NUTS: UKI
Internet address(es)
Main address: www.tfl.gov.uk
I.2) Joint procurement
The contract is awarded by a central purchasing body
I.6) Main activity
Urban railway, tramway, trolleybus or bus services
Section II: Object
II.1) Scope of the procurement
II.1.1) Title
High Voltage (HV) Power Framework
II.1.2) Main CPV code
45234000
II.1.3) Type of contract
Works
II.1.4) Short description
Transport for London (TfL) is establishing a dual-supplier framework to support the delivery of the increased HV Power requirements to operate the new Piccadilly line rolling stock and signalling systems. The framework is primarily for the Piccadilly line HV Power requirements with an option to include wider LUL HV Power requirements.
II.1.6) Information about lots
This contract is divided into lots:
No
II.1.7) Total value of the procurement
Lowest offer:
/ Highest offer:
II.2) Description
II.2.2) Additional CPV code(s)
31153000
31158100
31170000
31214000
31300000
31682200
42512300
42961200
44211100
45200000
45314300
45314310
45331000
71321000
71322000
71334000
II.2.3) Place of performance
NUTS code:
UKI
Main site or place of performance:
London
II.2.4) Description of the procurement
The Piccadilly Line Upgrade (PLU) will see the introduction of a new generation of Tube trains, set to reduce journey times, improve safety and transform the customer experience.
A key feature of the PLU is increased HV Power (phases 1 and 2), required to operate the new Piccadilly line rolling stock and signalling systems to permit faster station-to-station run times and higher frequency train services. These works and associated ‘Power On Dates’ are required due to increased power requirements of the new Piccadilly line rolling stock (24TS) and are critical to achieve the associated train roll-out programme.
The works required to be undertaken include a detailed system design and build, consisting of the procurement, supply, construction, installation, terminating, testing and commissioning and handover of the assets and structures necessary to facilitate implementation of the HV Power network upgrade. The substation and HV cable works required to deliver these upgrades are split into two phases, as follows:
Phase 1: all infrastructure upgrade works required to support introduction of the 24TS, and to increase peak Piccadilly line services to 27 trains per hour (TPH);
Phase 2: all infrastructure upgrade works required to support the new Piccadilly line signalling system, and the subsequent increased peak Piccadilly line service to 36TPH.
The Phase 1 scope comprises of 15 substation and switch house upgrades as well as extensive cable upgrades across the power network.
Phase 2 comprises seven substation upgrades, cable upgrades, as well as associated works to increase the nominal voltage from 630V to 750V.
II.2.5) Award criteria
Quality criterion: Technical
/ Weighting: 70
Cost criterion: Commercial
/ Weighting: 30
II.2.11) Information about options
Options:
Yes
Description of options:
The HV Power Framework can be extended by an additional two years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Section IV: Procedure
IV.1) Description
IV.1.1) Type of procedure
Negotiated with call for competition
IV.1.3) Information about a framework agreement or a dynamic purchasing system
The procurement involves the establishment of a framework agreement with a single operator.
IV.1.8) Information about Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement:
Yes
IV.2) Administrative information
IV.2.1) Previous publication concerning this procedure
Notice number in the OJ S:
2018/S 088-198430
IV.2.9) Information about termination of call for competition in the form of a prior information notice
The contracting authority will not award any further contracts based on the above prior information notice
Section V: Award of contract
Contract No: 2344_C_1001
Title: Batch A Framework Contractor
A contract/lot is awarded:
Yes
V.2 Award of contract
V.2.1) Date of conclusion of the contract
19/05/2022
V.2.2) Information about tenders
Number of tenders received: 3
Number of tenders received by electronic means: 3
The contract has been awarded to a group of economic operators:
No
V.2.3) Name and address of the contractor
Balfour Beatty Rail Limited
5 Churchill Place, Canary Wharf
London
UK
NUTS: UKI
The contractor is an SME:
No
V.2.5) Information about subcontracting
Section V: Award of contract
Contract No: 2344_C_1001
Title: Batch B Framework Contractor
A contract/lot is awarded:
Yes
V.2 Award of contract
V.2.1) Date of conclusion of the contract
10/06/2022
V.2.2) Information about tenders
Number of tenders received: 3
The contract has been awarded to a group of economic operators:
No
V.2.3) Name and address of the contractor
UK Power Network Services (Commercial) Limited
Newington House, 237 Southwark Bridge Road
London
UK
NUTS: UKI
The contractor is an SME:
No
V.2.5) Information about subcontracting
Section VI: Complementary information
VI.4) Procedures for review
VI.4.1) Review body
Transport for London
London
UK
Telephone: +44 2070384000
E-mail: DTUPEngagements@tfl.gov.uk
Internet address(es)
URL: https://tfl.gov.uk
VI.4.2) Body responsible for mediation procedures
Transport for London
London
UK
Telephone: +44 2070384000
VI.4.4) Service from which information about the review procedure may be obtained
Transport for London
London
UK
Telephone: +44 2070384000
VI.5) Date of dispatch of this notice
24/06/2022