Contract Award Notice

North Campus - Industry Hub

  • First published: 08 June 2023
  • Last modified: 08 June 2023
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-0398ae
Published by:
Burnley College
Authority ID:
AA75029
Publication date:
08 June 2023
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

In late 2019, the College carried out a review of the campus and accommodation strategy, leading to a study for a strategic master plan in March 2020. The master plan identified a number of sites on the existing campus, including the teaching building and Sports building extension.

The land to the North of the existing site was identified as the ideal location for an extension to the campus and would provide the College with medium-long term development capacity, the" North Campus" as it has become known.

Instead of simply forming an extended version of the existing campus, the opportunity has been taken to re-think the character of a place for learning. Providing excellent teaching space is a pre-requisite, as is ensuring buildings have a low energy demand with low emissions leading towards net zero carbon is a key objective of the design. In complete contrast to the existing campus is the integration of green landscape space and buildings.

Although close to the town centre with its retail parks and car parks, the North campus is envisaged as a haven with buildings in soft landscape, where proximity to nature becomes part of the student experience at Burnley College.

At the heart of the North Campus is a green space, almost a park with buildings around the perimeter. The need to deal with water has been treated as a positive with storage capacity built into a central lake with swales. This will create a range of distinctive planting zones with various habitats. A linear pedestrian route that will link future buildings defines the eastern edge of the green space, it will also accommodate café and social learning zones that spill out from the ground floors of teaching buildings. From upper floors it is expected that the design of the proposed buildings can take advantage of views towards Pendle and South towards the viaduct.

The central area will include a small sports area to supplement the all-weather pitch on the main campus. This will be provided managed sports provision that will be available for community just as existing facilities are. At the South end of the site a combination of ramp and steps will deal with the change in level between the current and proposed campus.

There is also potential to incorporate a trim trail around the perimeter of the site and incorporate a performance space to the south of the industry hub with permanent seating as a landscape feature.

Between the linear route and the Calder is the future development zone for teaching buildings. This zone stays outside the 8m easement along the river required by the Environment Agency. Whilst there will be access along the river, it is seen as secondary with minimal footfall. It is intended to be a quite space with limited lighting at night

At the North end of the site will be the Industry Hub. The building will terminate the view and create something of a barrier to motorway noise, but as a two storey structure will not block the views of trees beyond. The ground floor social spaces are linked to a south facing external terrace that will have views of the viaduct and townscape beyond.

The scope of the procurement is to appoint a Principal Contractor for the delivery of the North Campus - Industry Hub project. The successful tenderer/contractor awarded such a contract must be fully available to mobilise in early April 2023.

The Contract terms and conditions will be JCT Design & Build Building Contract (2016),with Special Conditions, which are available as part of the ITT.

The College has procured Project Team and Design Services to complete up to RIBA Stage 4.

The following Design Disciplines are proposed to be novated to the Principal Contractor.

• Architect (lead Designer) - ABW Architects

• Landscape Designer - Milieu Landscape Design

• Civil & Structural Engineering Consultants - Waterman Group.

Full notice text

Contract award notice

Results of the procurement procedure

Section I: Contracting entity

I.1) Name and addresses

BURNLEY COLLEGE

10001000

Princess Way

BURNLEY

BB120AN

UK

Contact person: Stuart Arnfield

Telephone: +44 1282733106

E-mail: s.arnfield@burnley.ac.uk

NUTS: UKD46

Internet address(es)

Main address: www.burnley.ac.uk

Address of the buyer profile: www.burnley.ac.uk

I.4) Type of the contracting authority

Body governed by public law

I.5) Main activity

Education

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

North Campus - Industry Hub

Reference number: FTS 001610-2023

II.1.2) Main CPV code

45000000

 

II.1.3) Type of contract

Works

II.1.4) Short description

This project comprises the development of the newly acquired North campus be developed to include: the construction of the new Industry Hub building; as well the construction of new infrastructure and landscaping elements.

The proposed works will be procured through a single stage Design & Build route, based on RIBA Stage 4 Design information.

The Works will be instructed in two phases:

• Phase 1 being the delivery of the infrastructure and landscaping package only; and

• Phase 2 being the delivery of the infrastructure and landscaping package, as well as the a new Industry Hub building.

The proposed works noted under Phase 2, notably the construction of the new Industry Hub building will be dependent upon a successful funding applications.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Value excluding VAT: 10 795 600.00  GBP

II.2) Description

II.2.3) Place of performance

NUTS code:

UKD46


Main site or place of performance:

North Campus of Burnley College, Princess Way, Burnley, BB12 0AN.

II.2.4) Description of the procurement

In late 2019, the College carried out a review of the campus and accommodation strategy, leading to a study for a strategic master plan in March 2020. The master plan identified a number of sites on the existing campus, including the teaching building and Sports building extension.

The land to the North of the existing site was identified as the ideal location for an extension to the campus and would provide the College with medium-long term development capacity, the" North Campus" as it has become known.

Instead of simply forming an extended version of the existing campus, the opportunity has been taken to re-think the character of a place for learning. Providing excellent teaching space is a pre-requisite, as is ensuring buildings have a low energy demand with low emissions leading towards net zero carbon is a key objective of the design. In complete contrast to the existing campus is the integration of green landscape space and buildings.

Although close to the town centre with its retail parks and car parks, the North campus is envisaged as a haven with buildings in soft landscape, where proximity to nature becomes part of the student experience at Burnley College.

At the heart of the North Campus is a green space, almost a park with buildings around the perimeter. The need to deal with water has been treated as a positive with storage capacity built into a central lake with swales. This will create a range of distinctive planting zones with various habitats. A linear pedestrian route that will link future buildings defines the eastern edge of the green space, it will also accommodate café and social learning zones that spill out from the ground floors of teaching buildings. From upper floors it is expected that the design of the proposed buildings can take advantage of views towards Pendle and South towards the viaduct.

The central area will include a small sports area to supplement the all-weather pitch on the main campus. This will be provided managed sports provision that will be available for community just as existing facilities are. At the South end of the site a combination of ramp and steps will deal with the change in level between the current and proposed campus.

There is also potential to incorporate a trim trail around the perimeter of the site and incorporate a performance space to the south of the industry hub with permanent seating as a landscape feature.

Between the linear route and the Calder is the future development zone for teaching buildings. This zone stays outside the 8m easement along the river required by the Environment Agency. Whilst there will be access along the river, it is seen as secondary with minimal footfall. It is intended to be a quite space with limited lighting at night

At the North end of the site will be the Industry Hub. The building will terminate the view and create something of a barrier to motorway noise, but as a two storey structure will not block the views of trees beyond. The ground floor social spaces are linked to a south facing external terrace that will have views of the viaduct and townscape beyond.

The scope of the procurement is to appoint a Principal Contractor for the delivery of the North Campus - Industry Hub project. The successful tenderer/contractor awarded such a contract must be fully available to mobilise in early April 2023.

The Contract terms and conditions will be JCT Design & Build Building Contract (2016),with Special Conditions, which are available as part of the ITT.

The College has procured Project Team and Design Services to complete up to RIBA Stage 4.

The following Design Disciplines are proposed to be novated to the Principal Contractor.

• Architect (lead Designer) - ABW Architects

• Landscape Designer - Milieu Landscape Design

• Civil & Structural Engineering Consultants - Waterman Group.

II.2.5) Award criteria

Quality criterion: Resource Plan / Weighting: 10%

Quality criterion: Programme / Weighting: 20%

Quality criterion: Works Delivery Plan / Weighting: 10%

Quality criterion: Health and Safety / Weighting: 10%

Quality criterion: Environment / Weighting: 5%

Quality criterion: Social Value / Weighting: 5%

Cost criterion: Price / Weighting: 40%

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Open procedure

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: No

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2023/S 000-001610

Section V: Award of contract

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

06/06/2023

V.2.2) Information about tenders

Number of tenders received: 1

Number of tenders received by electronic means: 1

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

John Turner Construction Group

02343739

2 Preston Road, Grimsargh

Preston

PR2 5SD

UK

NUTS: UKD46

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Initial estimated total value of the contract/lot:

Total value of the contract/lot: : 10 795 600.00  GBP

V.2.5) Information about subcontracting

The contract is likely to be subcontracted

Value or proportion likely to be subcontracted to third parties

Value excluding VAT: 8 636 480.00 GBP

Proportion: 80 %

Section VI: Complementary information

VI.4) Procedures for review

VI.4.1) Review body

Royal Courts of Justice

The Strand

London

WC2A2LL

UK

VI.5) Date of dispatch of this notice

07/06/2023

Coding

Commodity categories

ID Title Parent category
45000000 Construction work Construction and Real Estate

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
s.arnfield@burnley.ac.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.