Prior Information Notice

Woodside Development Project

  • First published: 24 June 2023
  • Last modified: 24 June 2023

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-03dc12
Published by:
Merseytravel
Authority ID:
AA26182
Publication date:
24 June 2023
Deadline date:
-
Notice type:
Prior Information Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

Merseytravel: Woodside Ferry Terminal Landing Stage Renewal.

Merseytravel owns and operates the Mersey Ferries Service. Mersey Ferries operates two vessels on the Mersey and three landing stages at Liverpool Pier Head, Wallasey Seacombe, and Birkenhead Woodside.

The current landing stage at Woodside is nearing the end of it’s design life and Merseytravel wishes to replace it with a stage that better fits with the operational demand and utilises best practice in landing stage design.

Operational experience has shown that the preferred solution would be for a smaller landing stage that is retained by piles in preference to the existing chain and anchor system.

We anticipate that a landing stage of 52 meters length by 12 meters width and 3 meters depth (2 meters freeboard) would be adequate for our requirements. A new passenger bridge will be required to link the landing stage to the shore. The passenger bridge will be in the order of 60 meters length with a deck width of 4.5 meters by 3.4 meters clear internal height.

Access to the vessel from the stage will be via power operated gangways (2) as recently installed at Seacombe landing stage.

The berthing face will have a fender system to accommodate both the existing and planned new Mersey ferry vessel. Overall vessel dimensions 50 meters by 12 meters with 1.7 meters freeboard.

8 No Bollards will be required along the berthing face, all will be 60 ton “T” head bollards as fitted to Pier Head and Seacombe landing stages.

Accommodation on the landing stage will be limited to a power distribution room, a housing to accommodate the systems associated with the power gangways and a small open style passenger waiting area.

Merseytravel requires a contractor who can deliver a “Turnkey” project for all marine elements including Design and Build encompassing construction and installation of Piles, Pontoon, including operational equipment, and Passenger bridge.

At this time Merseytravel is seeking to make potential contractors aware of the opportunity and would welcome an early approach to discuss our requirements prior to a formal tender process commencing.

Interested contractors should respond to this notice Via this portal by midday on Friday 7 July 2023.

Full notice text

Prior information notice

This notice is for prior information only

Section I: Contracting authority

I.1) Name and addresses

Merseytravel

1 Mann Island

Liverpool

L3 1BP

UK

Contact person: Procurement Team

E-mail: Procurement@liverpoolcityregion-ca.gov.uk

NUTS: UKD7

Internet address(es)

Main address: http://www.merseytravel.gov.uk/

Address of the buyer profile: http://www.merseytravel.gov.uk/

I.3) Communication

Additional information can be obtained from the abovementioned address


I.4) Type of the contracting authority

Regional or local authority

I.5) Main activity

General public services

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Woodside Development Project

Reference number: DN676121

II.1.2) Main CPV code

45000000

 

II.1.3) Type of contract

Works

II.1.4) Short description

The CA seeks to commission a main contractor to supply and install a new Landing Stage Pontoon, Linkspan Passenger Bridge and a new Piled Restraint System in accordance to consultant tender documentation at Woodside. Also required is the removal and disposal of the existing structures, with all works to be in accordance with planning and marine consents.

II.1.5) Estimated total value

Value excluding VAT: 8 000 000.00  GBP

II.1.6) Information about lots

This contract is divided into lots: No

II.2) Description

II.2.3) Place of performance

NUTS code:

UKD7

II.2.4) Description of the procurement

Merseytravel: Woodside Ferry Terminal Landing Stage Renewal.

Merseytravel owns and operates the Mersey Ferries Service. Mersey Ferries operates two vessels on the Mersey and three landing stages at Liverpool Pier Head, Wallasey Seacombe, and Birkenhead Woodside.

The current landing stage at Woodside is nearing the end of it’s design life and Merseytravel wishes to replace it with a stage that better fits with the operational demand and utilises best practice in landing stage design.

Operational experience has shown that the preferred solution would be for a smaller landing stage that is retained by piles in preference to the existing chain and anchor system.

We anticipate that a landing stage of 52 meters length by 12 meters width and 3 meters depth (2 meters freeboard) would be adequate for our requirements. A new passenger bridge will be required to link the landing stage to the shore. The passenger bridge will be in the order of 60 meters length with a deck width of 4.5 meters by 3.4 meters clear internal height.

Access to the vessel from the stage will be via power operated gangways (2) as recently installed at Seacombe landing stage.

The berthing face will have a fender system to accommodate both the existing and planned new Mersey ferry vessel. Overall vessel dimensions 50 meters by 12 meters with 1.7 meters freeboard.

8 No Bollards will be required along the berthing face, all will be 60 ton “T” head bollards as fitted to Pier Head and Seacombe landing stages.

Accommodation on the landing stage will be limited to a power distribution room, a housing to accommodate the systems associated with the power gangways and a small open style passenger waiting area.

Merseytravel requires a contractor who can deliver a “Turnkey” project for all marine elements including Design and Build encompassing construction and installation of Piles, Pontoon, including operational equipment, and Passenger bridge.

At this time Merseytravel is seeking to make potential contractors aware of the opportunity and would welcome an early approach to discuss our requirements prior to a formal tender process commencing.

Interested contractors should respond to this notice Via this portal by midday on Friday 7 July 2023.

II.3) Estimated date of publication of contract notice:

02/10/2023

Section IV: Procedure

IV.1) Description

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: No

Section VI: Complementary information

VI.5) Date of dispatch of this notice

23/06/2023

Coding

Commodity categories

ID Title Parent category
45000000 Construction work Construction and Real Estate

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
Procurement@liverpoolcityregion-ca.gov.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.