The procurement documents are available for unrestricted and full direct access, free of charge at:
Lot No: 1
II.2.1) Title
Up to £10m Civils
II.2.2) Additional CPV code(s)
43310000
45200000
71311100
71322000
II.2.3) Place of performance
NUTS code:
UK
II.2.4) Description of the procurement
Lot 1- Up to £10m Civils
Characteristics:
• Typically, standalone or enabling works.
• Limited third party interfaces and temporary works.
• Defined, well scoped packages with repeatable delivery characteristics.
Indicative scope may include:
• Substation site clearance and earthworks.
• Foundations for plant (excluding specialist or high risk structures).
• Internal substation roads, hardstanding and drainage.
• Access track construction, strengthening and minor realignments.
• Public road improvements of limited complexity (e.g. passing places, junction tie ins).
• Standard ducting, cabling, troughing and fencing.
• Peatland restoration and environmental mitigation work using established methods.
This lot is also split into 5 regions across Scotland which bidders can apply for one or more of.
II.2.5) Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 96
This contract is subject to renewal: Yes
Description of renewals:
2 years initial term + 6 years of optional extension
II.2.10) Information about variants
Variants will be accepted:
No
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Lot No: 2
II.2.1) Title
Over £10m Civils
II.2.2) Additional CPV code(s)
43310000
45200000
71322000
II.2.3) Place of performance
NUTS code:
UK
II.2.4) Description of the procurement
Lot 2- Over £10m Civils
Characteristics:
1. Multi disciplinary, interfacing or staged works.
2. Higher construction, environmental or third party risk.
3. Complex temporary works, geotechnical, hydraulic or structural solutions.
4. Integration with live substations or critical transmission assets.
Indicative Scope Includes:
• Complex substation platforms and reinforced foundations.
• Complex/lengthy access track construction, strengthening and realignments.
• Bridges, retaining walls, culverts and major public road realignments.
• Flood defence schemes involving sheet piling, flood walls, pumping stations and storage.
• Watercourse diversions, culvert upgrades and return period capacity improvements.
• High risk peatland restoration and slope stability works.
• Resilient substation adaptations including elevation of existing plant and equipment.
• Works requiring significant statutory interfaces, stakeholder coordination or technical approvals.
II.2.5) Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 96
This contract is subject to renewal: Yes
Description of renewals:
3 years initial term + 5 years extension
II.2.10) Information about variants
Variants will be accepted:
No
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Lot No: 3
II.2.1) Title
Buildings & Infrastructure
II.2.2) Additional CPV code(s)
45210000
45213200
II.2.3) Place of performance
NUTS code:
UK
II.2.4) Description of the procurement
Lot 3- Buildings & Infrastructure
This lot covers the design, management, construction, testing and completion of Buildings and Infrastructure projects with the scope including but not limited to:
Buildings
• Storage buildings, training school facilities, accommodation and welfare facilities
• Office buildings
• Upgrades, refurbishments, and extensions to existing.
• Internal fit out works to new and existing buildings, including partitions, raised access floors, finishes, cable management systems, containment, and earthing and bonding.
• Mechanical and electrical fit out of building services within new and existing buildings.
• Replacement of RAAC roof structures were identified
Design Management and Development
• Establish and manage a suitably qualified design team covering all design and construction aspects of the project.
• Undertake surveys necessary to complete the project.
• Carry out gap analysis and value engineering, as appropriate.
• Develop, complete, and manage design, including managing responses to planning conditions.
• Prepare interim and final RIBA Stage 4 drawings and reports.
• Complete room data sheets and room layouts.
• Prepare and maintain the BIM model for design and construction, including updating any RIBA Stage 3 information produced by others.
Planning, Programming and Coordination
• Develop the Construction Phase Plan and detailed programme.
• Attend and lead a project kick off meeting to agree deliverable stages and key milestones.
• Assist with coordination alongside the Project Manager, Project Sponsors, and stakeholder engagement activities.
• Support utility investigations and statutory enquiries.
• Prepare planning application deliverables, including DAS, DIAs, visualisations’, noise studies, CTMPs, designs
Enabling and Construction Works
• Undertake any enabling works identified, including service diversion works.
• Prepare design and specifications, coordinating SSEN T fit out, IT, and OT designs and incorporating these into the Works Information.
Health, Safety, Environment and Sustainability
• Fulfil all duties required of the Main Contractor under CDM Regulations, supporting other duty holders as required.
• Complete SSEN T Gate process documentation, including but not limited to:
- Design Risk Management Index (DRMI)
- Hazard Identification Workshops (Design HAZID, Construction HAZCON, Operational HAZOP)
- Project safety reviews and reports
• Develop carbon and sustainability assessments
• Prepare Environmental Management Plans, Environmental and Biodiversity Net Gain reports.
Training School Specific Infrastructure
• Delivery of offline electrical substation works including substation, associated control, AIS and GIS buildings and OHL works
II.2.5) Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 96
This contract is subject to renewal: Yes
Description of renewals:
3 years initial term + 5 years optional extension
II.2.10) Information about variants
Variants will be accepted:
No
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Lot No: 4
II.2.1) Title
OHL Pole Construction
II.2.2) Additional CPV code(s)
45232210
II.2.3) Place of performance
NUTS code:
UK
II.2.4) Description of the procurement
Lot 4- OHL Pole Construction
This lot covers the design, management, construction, testing and completion of overhead line pole-based transmission works, typically at 132kV but capable of supporting higher voltages where specified.
Indicative scope includes, but is not limited to:
Design and engineering
• Detailed design of pole foundations, assemblies and interfaces.
• Temporary works design associated with pole installation.
• Design development to support constructability, safety and environmental compliance.
Pre construction and enabling works
• Surveys, setting out and ground investigations.
• Access provision, compounds, crane pads and working areas.
• Coordination with land access, wayleaves and stakeholder requirements.
Construction
• Installation of wood, steel or composite poles.
• Construction of pole foundations, including reinforced concrete, embedded or piled solutions where required.
• Pole erection, alignment and stability works.
• Installation of crossarms, insulators, fittings and associated hardware.
• Conductor stringing, tensioning, sagging and clipping.
• Installation of earth wires, fibre or auxiliary equipment where specified.
• Removal, replacement or modification of existing pole structures where required.
• Tie ins to existing overhead lines and interfaces with substations or transition structures.
Testing, commissioning and completion
• Inspection and testing required to demonstrate compliance with the Works Information.
• Support to commissioning activities defined in the PSWI.
• As built records, data capture and handover documentation.
II.2.5) Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 96
This contract is subject to renewal: Yes
Description of renewals:
5 years initial term + 3 years of optional extensions
II.2.10) Information about variants
Variants will be accepted:
No
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Lot No: 5
II.2.1) Title
OHL Tower Construction
II.2.2) Additional CPV code(s)
45232210
II.2.3) Place of performance
NUTS code:
UK
II.2.4) Description of the procurement
Lot 5- OHL Tower Construction
This lot covers the design, management, construction, testing and completion of lattice tower and steel structure overhead line transmission works, typically at 132kV, 275kV and 400kV.
Indicative scope includes, but is not limited to:
Design and engineering
• Detailed design of tower foundations and structural interfaces.
• Temporary works design for excavation support, lifts and erection activities.
• Design risk management and constructability reviews.
Pre construction and enabling works
• Surveys, ground investigation and setting out.
• Access tracks, temporary works areas, crane pads and compounds.
• Environmental mitigation and land management measures.
Construction
• Construction of tower foundations, including piled, reinforced concrete and specialist foundations.
• Tower steelwork delivery, assembly and erection.
• Installation of insulators, fittings and tower accessories.
• Conductor stringing, tensioning and clipping.
• Removal, replacement or modification of existing towers.
• Overhead line realignments, deviations and rebuilds.
• Interfaces with live assets, outages and system constraints where defined in the PSWI.
Testing, commissioning and completion
• Structural inspection, verification and testing.
• Support to system testing and commissioning activities.
• Production of as built documentation and asset data.
II.2.5) Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 96
This contract is subject to renewal: Yes
Description of renewals:
5 years initial term + 3 years optional extension
II.2.10) Information about variants
Variants will be accepted:
No
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Lot No: 6
II.2.1) Title
Underground Cable Construction
II.2.2) Additional CPV code(s)
31321300
45231400
45314310
II.2.3) Place of performance
NUTS code:
UK
II.2.4) Description of the procurement
Lot 6- UGC Construction
This lot covers the design, management, construction, testing and completion of underground cable (UGC) transmission works 132kv and above.
Indicative scope includes, but is not limited to:
Design and engineering
• Detailed design of cable routes, trenching, ducts, joint bays and interfaces.
• Temporary works and traffic management design.
• Coordination with consents, planning conditions and third party interfaces.
Pre construction and enabling works
• Surveys, trial holes and utilities investigations.
• Access, compounds, traffic management and enabling civils.
• Environmental protection and mitigation measures.
Construction
• Trenching and excavation.
• Duct installation, bedding and backfill.
• Construction of joint bays and termination compounds.
• Cable pulling, installation and protection.
• Installation of joints and terminations where within Contractor capability and scope.
• Interface works with substations and overhead line transitions.
• Surface reinstatement, agricultural reinstatement and environmental restoration.
Testing, commissioning and completion
• Cable testing, verification and commissioning support.
• Production of as built drawings, GIS data and handover records.
II.2.5) Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 96
This contract is subject to renewal: Yes
Description of renewals:
5 years initial term + 3 years of optional extensions
II.2.10) Information about variants
Variants will be accepted:
No
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No