Contract Notice

Ancillary Fabrication of Spreadable Butter Processing Line

  • First published: 22 June 2026
  • Last modified: 22 June 2026
  • Version: N/A
  • Record interest

     

  • This file may not be fully accessible.

  •  

Contents

Summary

OCID:
ocds-kuma6s-166859
Published by:
Gower View Foods Ltd
Authority ID:
AA88826
Publication date:
22 June 2026
Deadline date:
06 July 2026
Notice type:
Contract Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
Yes

Abstract

Stainless Steel Fabrication and Installation Support Works for Spreadable Butter Production Facility Requirement Gower View Foods Ltd seeks quotations for the provision of stainless-steel fabrication, equipment installation support works, guarding, and associated mechanical installation services required for the integration of a new spreadable butter production facility. The successful contractor shall provide all labour, materials, fabrication, lifting equipment, installation services, testing, and commissioning support necessary to facilitate the safe and effective installation of the production line. Scope of Works 1. Equipment Offloading and Positioning The successful contractor shall: • Offload delivered equipment from transport vehicles. • Provide all necessary lifting and handling equipment. • Move and position equipment within the designated production area. • Align equipment in accordance with the agreed production line layout. • Undertake final positioning and adjustment prior to commissioning. Equipment to be installed includes, but is not limited to: • Stainless-steel conveyors • Tote bin lift • Z-blade blender • Butter trolley system • Butter pump • Vertical butter silo refurbishment and installation • Spreadable butter processing plant • Pipework serving the tub filling machine • Metal detector • Case packer • CIP system • Steam boiler • Chilled water plant 2. Equipment Integration and Height Modifications The successful contractor shall: • Assess equipment interface heights and installation requirements. • Design and fabricate supports, stands, brackets, and adjustment structures as necessary. • Modify equipment elevations to ensure continuous product flow throughout the production process. • Achieve correct alignment between all process equipment and conveyors. 3. Stainless-Steel Transition Fabrication The scope shall include the design, manufacture, and installation of stainless-steel transition components required to achieve automatic product transfer between equipment. Fabricated items may include: • Product transfer chutes. • Transition hoppers. • Interface sections. • Support brackets and mounting structures. • Ancillary stainless-steel fabrication necessary to connect process equipment. All transitions shall be designed to: • Facilitate automatic product flow. • Minimise product loss and contamination risks. • Support hygienic cleaning and maintenance. • Integrate effectively with existing and new equipment. 4. Z-Blade Blender Support Stand The successful contractor shall: • Design, manufacture, and install a new stainless-steel box-section support stand for the Z-blade blender. • Ensure the stand provides adequate structural support and operational stability. • Design the stand to achieve the required working height and integration with adjacent equipment. • Construct the stand using food-grade stainless steel suitable for wash-down environments. 5. Safety Guarding The scope shall include the supply and installation of machinery guarding required to ensure safe operation of the production line. Guarding shall comprise: • Stainless-steel box-section framework. • 25 mm stainless-steel welded mesh infill panels. • Access doors and removable sections where required for maintenance and cleaning. • Secure fixing systems. • Compliance with applicable machinery safety requirements. The contractor shall: • Manufacture all guarding. • Install guarding in its final operating position. • Ensure access arrangements are practical and safe. • Coordinate guarding layouts with equipment operation and maintenance requirements. 6. Lifting and Installation Equipment The successful contractor shall provide all lifting and handling equipment necessary to complete the installation, including: • Forklift trucks. • Machinery skates. • Toe jacks. • Lifting accessories. • Any additional equipment required for safe handling and positioning of machinery. 7. Fabri

Full notice text

CONTRACT NOTICE – NATIONAL

SUPPLIES

1 Authority Details

1.1

Authority Name and Address


Gower View Foods Ltd

Plot 3, Heol Ty Newydd,

Carmarthenshire

SA14 6RF

UK

Adam Davies

+44 1269846958

adam@gowerviewfoods.co.uk


https://www.sell2wales.gov.wales
https://www.sell2wales.gov.wales

1.2

Address from which documentation may be obtained


Gower View Foods Ltd

Plot 3, Heol Ty Newydd,

Carmarthenshire

SA14 6RF

UK

Adam Davies

+44 1269846958

adam@gowerviewfoods.co.uk

1.3

Completed documents must be returned to:


Gower View Foods Ltd

Plot 3, Heol Ty Newydd,

Carmarthenshire

SA14 6RF

UK


+44 1269846958


2 Contract Details

2.1

Title

Ancillary Fabrication of Spreadable Butter Processing Line

2.2

Description of the goods or services required

Stainless Steel Fabrication and Installation Support Works for Spreadable Butter Production Facility

Requirement

Gower View Foods Ltd seeks quotations for the provision of stainless-steel fabrication, equipment installation support works, guarding, and associated mechanical installation services required for the integration of a new spreadable butter production facility.

The successful contractor shall provide all labour, materials, fabrication, lifting equipment, installation services, testing, and commissioning support necessary to facilitate the safe and effective installation of the production line.

Scope of Works

1. Equipment Offloading and Positioning

The successful contractor shall:

• Offload delivered equipment from transport vehicles.

• Provide all necessary lifting and handling equipment.

• Move and position equipment within the designated production area.

• Align equipment in accordance with the agreed production line layout.

• Undertake final positioning and adjustment prior to commissioning.

Equipment to be installed includes, but is not limited to:

• Stainless-steel conveyors

• Tote bin lift

• Z-blade blender

• Butter trolley system

• Butter pump

• Vertical butter silo refurbishment and installation

• Spreadable butter processing plant

• Pipework serving the tub filling machine

• Metal detector

• Case packer

• CIP system

• Steam boiler

• Chilled water plant

2. Equipment Integration and Height Modifications

The successful contractor shall:

• Assess equipment interface heights and installation requirements.

• Design and fabricate supports, stands, brackets, and adjustment structures as necessary.

• Modify equipment elevations to ensure continuous product flow throughout the production process.

• Achieve correct alignment between all process equipment and conveyors.

3. Stainless-Steel Transition Fabrication

The scope shall include the design, manufacture, and installation of stainless-steel transition components required to achieve automatic product transfer between equipment.

Fabricated items may include:

• Product transfer chutes.

• Transition hoppers.

• Interface sections.

• Support brackets and mounting structures.

• Ancillary stainless-steel fabrication necessary to connect process equipment.

All transitions shall be designed to:

• Facilitate automatic product flow.

• Minimise product loss and contamination risks.

• Support hygienic cleaning and maintenance.

• Integrate effectively with existing and new equipment.

4. Z-Blade Blender Support Stand

The successful contractor shall:

• Design, manufacture, and install a new stainless-steel box-section support stand for the Z-blade blender.

• Ensure the stand provides adequate structural support and operational stability.

• Design the stand to achieve the required working height and integration with adjacent equipment.

• Construct the stand using food-grade stainless steel suitable for wash-down environments.

5. Safety Guarding

The scope shall include the supply and installation of machinery guarding required to ensure safe operation of the production line.

Guarding shall comprise:

• Stainless-steel box-section framework.

• 25 mm stainless-steel welded mesh infill panels.

• Access doors and removable sections where required for maintenance and cleaning.

• Secure fixing systems.

• Compliance with applicable machinery safety requirements.

The contractor shall:

• Manufacture all guarding.

• Install guarding in its final operating position.

• Ensure access arrangements are practical and safe.

• Coordinate guarding layouts with equipment operation and maintenance requirements.

6. Lifting and Installation Equipment

The successful contractor shall provide all lifting and handling equipment necessary to complete the installation, including:

• Forklift trucks.

• Machinery skates.

• Toe jacks.

• Lifting accessories.

• Any additional equipment required for safe handling and positioning of machinery.

7. Fabrication Standards

All fabricated items shall:

• Be manufactured from food-grade stainless steel.

• Be suitable for use within a dairy and food manufacturing environment.

• Incorporate hygienic design principles.

• Include smooth, cleanable surfaces and appropriate weld finishes.

• Be resistant to routine cleaning and wash-down procedures.

8. Installation and Commissioning Support

The successful contractor shall:

• Install all fabricated components.

• Support equipment integration activities.

• Undertake final adjustments and alignment.

• Assist with commissioning activities where required.

• Rectify any defects identified during installation or commissioning.

9. Health, Safety and Compliance

All works shall comply with:

• Health and Safety at Work legislation.

• Provision and Use of Work Equipment Regulations (PUWER).

• Machinery safety requirements.

• Food industry hygiene standards.

• Applicable British and European standards.

Quotation Requirements

Suppliers shall provide:

• A detailed description of the proposed fabrication and installation works.

• Details of materials and fabrication methods.

• Relevant experience within food manufacturing environments.

• Programme and lead time for completion.

• Total cost including fabrication, labour, lifting equipment, installation, and commissioning support.

• Warranty details for fabricated items and workmanship.

Site Location

Works will be undertaken at Gower View Foods Ltd, Cross Hands, Carmarthenshire, Wales.

NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=166859.

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx.

Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.

2.3

Notice Coding and Classification

42000000 Industrial machinery
42200000 Machinery for food, beverage and tobacco processing and associated parts
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)

2.4

Total quantity or scope of tender

Request for total job, one of.

3 Conditions for Participation

3.1

Minimum standards and qualification required

Supply of new equipment only.

4 Administrative Information

4.1

Type of Procedure

Single stage

4.2

Reference number attributed to the notice by the contracting authority

N/a

4.3

Time Limits

Time-limit for receipt of completed tenders
    06-07-2026  Time  12:00

Estimated award date
 31-07-2026

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN 

4.6

Tender Submission Postbox

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx

5 Other Information

5.1

Additional Information

(WA Ref:166859)

5.2

Additional Documentation

5.3

Publication date of this notice

 22-06-2026

Coding

Commodity categories

ID Title Parent category
42000000 Industrial machinery Technology and Equipment
42200000 Machinery for food, beverage and tobacco processing and associated parts Industrial machinery

Delivery locations

ID Description
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
adam@gowerviewfoods.co.uk
Admin contact:
adam@gowerviewfoods.co.uk
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

Postbox

The awarding buyer has indicated that it will accept electronic responses to this notice via the Tender Submission Postbox facility.

Submit your tender response electronically in a secure environment.

To create an electronic response please click the "Add to my interest list" button at the top of the page.

For more information on the Postbox Facility please refer to the user guide:

Q&A

Ask the buyer any questions you may have relating to this notice. To ask the buyer a question or questions please click the "View Questions and Answers" button.


0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.