NRW All Wales Mountain Bike Trail and Maintenance Framework

  • First published: 23 June 2026
  • Last modified: 23 June 2026
  • Version: 1
  • Record interest

     

  • This file may not be fully accessible.

  •  

Contents

Summary

OCID:
ocds-h6vhtk-06ba93
Published by:
Natural Resources Wales
Authority ID:
AA0110
Publication date:
23 June 2026
Deadline date:
-
Notice type:
UK1
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots.

Lot 1 – Mountain Bike Trail Maintenance Works

Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to:

• Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor.

• Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk.

• Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager.

• Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure.

• Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities.

• Emergency call-out works, including outside normal working hours (09:00–17:00, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements.

Lot 2 – Mountain Bike Trail Design and Construction

Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include:

• Detailed trail design.

• Securing all necessary permissions, approvals, consents and licences required for project delivery.

• Corridor clearance and construction of trails to the specification and grading requirements defined by the Client.

• Testing, commissioning and certification that the completed works are fit for purpose.

• Formal handover of completed trails and associated documentation to the Client.

Full notice text

Scope

Procurement reference

NRW55737

Procurement description

NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots.

Lot 1 – Mountain Bike Trail Maintenance Works

Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to:

• Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor.

• Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk.

• Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager.

• Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure.

• Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities.

• Emergency call-out works, including outside normal working hours (09:00–17:00, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements.

Lot 2 – Mountain Bike Trail Design and Construction

Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include:

• Detailed trail design.

• Securing all necessary permissions, approvals, consents and licences required for project delivery.

• Corridor clearance and construction of trails to the specification and grading requirements defined by the Client.

• Testing, commissioning and certification that the completed works are fit for purpose.

• Formal handover of completed trails and associated documentation to the Client.

Main category

Works

Delivery regions

  • UKL - Wales

Total value (estimated)

2000000.00 GBP Excluding VAT

2400000.00 GBP Including VAT

Contract dates (estimated)

04 January 2027, 00:00AM to 03 January 2031, 23:59PM

Is a framework being established?

Yes

Contracting authority

Natural Resources Wales

Identification register:

  • GB-PPON

Address 1: Welsh Government Offices Cathays Park

Town/City: Cardiff

Postcode: CF10 3NQ

Country: United Kingdom

Website: http://naturalresourceswales.gov.uk

Public Procurement Organisation Number: PBBR-3628-MPRN

Contact name: Emma L Brown

Email: Emma.L.Brown@cyfoethnaturiolcymru.gov.uk

Organisation type: Public authority - central government

Devolved regulations that apply: Wales

Procedure

Procedure type

Open procedure

Is the total value above threshold?

Above threshold

Lots

Divided into 1 lots

Lot number: 1

CPV classifications

  • 45236290 - Repair work on recreational areas
  • 45233160 - Paths and other metalled surfaces

Delivery regions

  • UKL - Wales

Sustainability

Small and medium-sized enterprises (SME)

Contract start date (estimated)

04 January 2027, 00:00AM

Contract end date (estimated)

03 January 2031, 23:59PM

Submission

Publication date of tender notice (estimated)

03 August 2026

Coding

Commodity categories

ID Title Parent category
45233160 Paths and other metalled surfaces Construction, foundation and surface works for highways, roads
45236290 Repair work on recreational areas Flatwork

Delivery locations

ID Description
100 UK - All

About the buyer

Main contact:
n/a
Admin contact:
n/a
Technical contact:
n/a
Other contact:
n/a

Further information

Date Details

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.