Contract Award Notice

SHDF Retro Consultant

  • First published: 24 March 2023
  • Last modified: 24 March 2023
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-039608
Published by:
The Riverside Group
Authority ID:
AA24832
Publication date:
24 March 2023
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The Riverside Group (TRG) have made a significant commitment to improving the energy

efficiency of our homes. We have a target of bringing all our homes up to a minimum of EPC

Band C by 2030 and to net zero carbon by 2050. We aim to :

? reduce the contribution to climate change that our homes make,

? protect our residents from rising energy costs

? enable our residents to heat their homes to guideline temperatures

? improve indoor air quality

? eliminate damp and mould.

TRG have applied for SHDF funding to take 1100 properties up to EPC Band C. We have

carried out a number of surveys already, some of which found properties were already at a C

and this is informing our data improvement. The project consists of approximately:

? London ? 150 (1 tranche)

? Carlisle ? 150 (1 tranche)

? Liverpool ? 800 (3 / 4 tranches)

The size of each tranche and distribution between the areas will be refined as surveys are

returned.

Whilst the driver for this project is to deliver SHDF funding, TRG will be taking an area based

approach so may include properties that are funded through other sources or where works

are minor, funded solely by TRG. If we are unsuccessful in SHDF funding, we will still proceed

with a project at approximately 50% and we will work with you to scope this ?fallback?

project so that resources are not wasted on work that may not be taken forward.

Given the SHDF timescales some activities will happen concurrently. For example, we will

expect to move to immediately surveying properties, at the same time, you will review our

wider eligible properties to produce a total survey list.

Similarly, surveys will still be taking place as our contractor mobilises in March and April and

there will be an opportunity to work with the contractor at this stage.

We will stagger the start of tranches in discussion with the contractor and in response to

resident engagement.

Full notice text

Contract award notice

Results of the procurement procedure

Section I: Contracting entity

I.1) Name and addresses

The Riverside Group

2 Estuary Boulevard, Estuary Commerce Park

Speke

L24 8RF

UK

E-mail: Procurement@riverside.org.uk

NUTS: UKD72

Internet address(es)

Main address: www.riverside.org.uk

Address of the buyer profile: https://riversource.wax-live.com/S2C/

I.4) Type of the contracting authority

Body governed by public law

I.5) Main activity

Housing and community amenities

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

SHDF Retro Consultant

II.1.2) Main CPV code

71314300

 

II.1.3) Type of contract

Services

II.1.4) Short description

This consultant appointment is key to that and we are looking for a consultant who truly

wants to work collaboratively with us to share knowledge and support us in increasing our inhouse

capabilities through a flexible approach. As we recruit staff and refine the project,

needs may change and we will have open dialogue with you about progress from both sides,

as well as any change in scope and approach.

Given the scale of the assessments being delivered, we expect to see economies of scale,

particularly as the area based approach should mean repetition of very similar properties and

the ability to reduce travel times by carrying out surveys in constrained area within a single

day.

As Retrofit Coordination requires regular on-site presence we will work with you at the

earliest stages to develop our programme and identify those tranches to go first which will

require an external RC to help you to resource this.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Value excluding VAT: 815 200.00  GBP

II.2) Description

II.2.3) Place of performance

NUTS code:

UKD7

UKI

UKD1


Main site or place of performance:

London 150 (1 tranche)

Carlisle 150 (1 tranche)

Liverpool 800 (3/4 tranches)

II.2.4) Description of the procurement

The Riverside Group (TRG) have made a significant commitment to improving the energy

efficiency of our homes. We have a target of bringing all our homes up to a minimum of EPC

Band C by 2030 and to net zero carbon by 2050. We aim to :

? reduce the contribution to climate change that our homes make,

? protect our residents from rising energy costs

? enable our residents to heat their homes to guideline temperatures

? improve indoor air quality

? eliminate damp and mould.

TRG have applied for SHDF funding to take 1100 properties up to EPC Band C. We have

carried out a number of surveys already, some of which found properties were already at a C

and this is informing our data improvement. The project consists of approximately:

? London ? 150 (1 tranche)

? Carlisle ? 150 (1 tranche)

? Liverpool ? 800 (3 / 4 tranches)

The size of each tranche and distribution between the areas will be refined as surveys are

returned.

Whilst the driver for this project is to deliver SHDF funding, TRG will be taking an area based

approach so may include properties that are funded through other sources or where works

are minor, funded solely by TRG. If we are unsuccessful in SHDF funding, we will still proceed

with a project at approximately 50% and we will work with you to scope this ?fallback?

project so that resources are not wasted on work that may not be taken forward.

Given the SHDF timescales some activities will happen concurrently. For example, we will

expect to move to immediately surveying properties, at the same time, you will review our

wider eligible properties to produce a total survey list.

Similarly, surveys will still be taking place as our contractor mobilises in March and April and

there will be an opportunity to work with the contractor at this stage.

We will stagger the start of tranches in discussion with the contractor and in response to

resident engagement.

II.2.5) Award criteria

Quality criterion: Quality / Weighting: 40

Price / Weighting:  60

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Open procedure

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2023/S 000-000590

Section V: Award of contract

Title: SHDF Retro Consultant

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

23/03/2023

V.2.2) Information about tenders

Number of tenders received: 11

Number of tenders received from tenderers from EU Member States: 0

Number of tenders received from tenderers from non-EU Member States: 0

Number of tenders received by electronic means: 11

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Constructive Thinking Studio Limited

Liverpool Science Park, 131 Mount Pleasant

Liverpool

L3 5TF

UK

NUTS: UKD72

The contractor is an SME: Yes

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : 815 200.00  GBP

V.2.5) Information about subcontracting

Section VI: Complementary information

VI.4) Procedures for review

VI.4.1) Review body

The Royal Court of Justice

The Strand

London

UK

VI.5) Date of dispatch of this notice

23/03/2023

Coding

Commodity categories

ID Title Parent category
71314300 Energy-efficiency consultancy services Energy and related services

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
Procurement@riverside.org.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.