Contract Award Notice

Mid Cornwall Metro Implementation Agreement

  • First published: 05 March 2024
  • Last modified: 05 March 2024

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-044522
Published by:
Cornwall Council
Authority ID:
AA20540
Publication date:
05 March 2024
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

An Implementation Agreement with respect to the ‘Mid-Cornwall Metro Enhancement Scheme’ to develop infrastructure enhancements aimed at supporting an increase in train services on the Newquay Branch, extending services on to the Cornwall Main Line and on to the Falmouth Branch line.

The work builds on feasibility work and a strategic outline business case (SOBC) for Mid-Cornwall Metro for which £1.5m was awarded to the project through the DfT’s ‘Restoring your Railway’ programme A FBC was submitted by Network rail to DfT at the end of March 2023 with GRIP 3 and 4 activities due to be completed by the summer of 2023.

The Project seeks to enable service levels on the branch line to increase from 8 trains a day in each direction to 1 train per hour between Newquay and Par. This will subsequently support the introduction of an hourly direct service linking the urban centres of Newquay, St Austell, Truro, Penryn and Falmouth. One of the objectives of the Mid-Cornwall Metro scheme is the development, design and delivery of an ‘access for all’ footbridge at Par.

This Agreement covers design services (including detailed design) that shall be undertaken from June 2023 up to completion.

Services

The Services to be provided by Network Rail include:

(a) Services of the Network Rail sponsor and any other supporting resources to provide ongoing contract management, guidance and support relating to the necessary consents and commercial agreements.

(b) Design Services including monitoring progress of detailed design and working drawings.

(c) Project management services and support necessary to manage the efficient and timely completion of the Project.

(d) Services of a Designated Project Engineer and Project Engineers for relevant engineering disciplines.

(e) Attendance at periodic progress meetings and workshops and to regularly report on progress and technical aspects of contract(s) in place to deliver the Works Requirements. Production of reports.

(f) Provision of information that Network Rail has in its possession, and which is reasonably requested by the Customer, or the Customer on behalf of Department for Transport.

(g) Administration and management of Railway Possessions and isolations procedures, scheduling and reporting relating to the Works.

(h) Undertaking surveys.

(i) Undertaking and administration of Commissioning procedures.

(j) Applying for Necessary Consents where Network Rail is responsible for obtaining such consents.

(k) Services of Network Rail resources from liabilities, level crossings and legal teams to support the required closures of level crossings including negotiations with authorised users.

(l) Provision of support to the Customer during statutory processes to extinguish rights for road users over level crossings that are being closed or altered.

(m) Monitor and regularly update estimated costs relating to Regulated Change, including notifying the Customer if the costs are forecast to exceed the estimate specified in Schedule 3, paragraph 4 Estimated Project Cost.

The Works comprise:

(a) Re-instatement of a second platform at Newquay capable of accommodating local services with retention of the existing platform capable of accommodating both local and long-distance services.

(b) Installation of a passing loop on the Newquay branch line capable of accommodating a 10 car IET (Intercity Express Train).

(c) Installation of a suitable signalling system to control the new passing loop at Tregoss Moor and the route into the additional platform at Newquay.

(d) Upgrades/closures to user worked, footpath and level crossings as deemed necessary by risk assessments, and any associated line speed increases through the crossings sections.

(e) Alterations/Closures and downgrades to footpath, user worked and to level crossings in the Trencreek & Chapel areas to support an air rig

Full notice text

Contract award notice

Results of the procurement procedure

Section I: Contracting entity

I.1) Name and addresses

Cornwall Council

County Hall, Treyew Road

Truro

TR1 3AY

UK

Contact person: Mrs Rebecca Riley

E-mail: rebecca.riley@cornwall.gov.uk

NUTS: UKK3

Internet address(es)

Main address: http://www.cornwall.gov.uk

Address of the buyer profile: http://www.cornwall.gov.uk

I.4) Type of the contracting authority

Regional or local authority

I.5) Main activity

General public services

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Mid Cornwall Metro Implementation Agreement

Reference number: DN713623

II.1.2) Main CPV code

45234000

 

II.1.3) Type of contract

Works

II.1.4) Short description

Implementation Agreement with respect to the ‘Mid-Cornwall Metro Enhancement Scheme’ to develop infrastructure enhancements aimed at supporting an increase in train services on the Newquay Branch, extending services on to the Cornwall Main Line and on to the Falmouth Branch line.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Value excluding VAT: 29 178 009.00  GBP

II.2) Description

II.2.2) Additional CPV code(s)

34621000

34632000

34941800

34942000

34942200

34943000

34944000

34945000

34946100

34946110

34946120

34946200

34946230

34946231

45213320

45213321

45213322

45221112

45221122

45221200

45221213

45221242

45234100

45234110

45234111

45234112

45234113

45234114

45234115

45234116

45234120

45234129

45234130

45234140

45234160

45234170

45234180

45235000

45236000

45237000

48140000

50000000

60200000

63711000

66514130

71311230

72212140

II.2.3) Place of performance

NUTS code:

UKK3

II.2.4) Description of the procurement

An Implementation Agreement with respect to the ‘Mid-Cornwall Metro Enhancement Scheme’ to develop infrastructure enhancements aimed at supporting an increase in train services on the Newquay Branch, extending services on to the Cornwall Main Line and on to the Falmouth Branch line.

The work builds on feasibility work and a strategic outline business case (SOBC) for Mid-Cornwall Metro for which £1.5m was awarded to the project through the DfT’s ‘Restoring your Railway’ programme A FBC was submitted by Network rail to DfT at the end of March 2023 with GRIP 3 and 4 activities due to be completed by the summer of 2023.

The Project seeks to enable service levels on the branch line to increase from 8 trains a day in each direction to 1 train per hour between Newquay and Par. This will subsequently support the introduction of an hourly direct service linking the urban centres of Newquay, St Austell, Truro, Penryn and Falmouth. One of the objectives of the Mid-Cornwall Metro scheme is the development, design and delivery of an ‘access for all’ footbridge at Par.

This Agreement covers design services (including detailed design) that shall be undertaken from June 2023 up to completion.

Services

The Services to be provided by Network Rail include:

(a) Services of the Network Rail sponsor and any other supporting resources to provide ongoing contract management, guidance and support relating to the necessary consents and commercial agreements.

(b) Design Services including monitoring progress of detailed design and working drawings.

(c) Project management services and support necessary to manage the efficient and timely completion of the Project.

(d) Services of a Designated Project Engineer and Project Engineers for relevant engineering disciplines.

(e) Attendance at periodic progress meetings and workshops and to regularly report on progress and technical aspects of contract(s) in place to deliver the Works Requirements. Production of reports.

(f) Provision of information that Network Rail has in its possession, and which is reasonably requested by the Customer, or the Customer on behalf of Department for Transport.

(g) Administration and management of Railway Possessions and isolations procedures, scheduling and reporting relating to the Works.

(h) Undertaking surveys.

(i) Undertaking and administration of Commissioning procedures.

(j) Applying for Necessary Consents where Network Rail is responsible for obtaining such consents.

(k) Services of Network Rail resources from liabilities, level crossings and legal teams to support the required closures of level crossings including negotiations with authorised users.

(l) Provision of support to the Customer during statutory processes to extinguish rights for road users over level crossings that are being closed or altered.

(m) Monitor and regularly update estimated costs relating to Regulated Change, including notifying the Customer if the costs are forecast to exceed the estimate specified in Schedule 3, paragraph 4 Estimated Project Cost.

The Works comprise:

(a) Re-instatement of a second platform at Newquay capable of accommodating local services with retention of the existing platform capable of accommodating both local and long-distance services.

(b) Installation of a passing loop on the Newquay branch line capable of accommodating a 10 car IET (Intercity Express Train).

(c) Installation of a suitable signalling system to control the new passing loop at Tregoss Moor and the route into the additional platform at Newquay.

(d) Upgrades/closures to user worked, footpath and level crossings as deemed necessary by risk assessments, and any associated line speed increases through the crossings sections.

(e) Alterations/Closures and downgrades to footpath, user worked and to level crossings in the Trencreek & Chapel areas to support an air right easement agreement between Network Rail and Cornwall Council in relation to the Hendra-Nansledan Overbridge Scheme.

(f) Removal of token system between St Blazey and Goonbarrow to aid reduction in journey times.

To complete the Works, detailed design needs to be completed. Network Rail shall produce:

• An updated indicative programme for design, delivery, hand-back and close-out.

• Confirmed possession strategy for the delivery stages.

• Continued scrutiny of costs to support the Customer’s financial forecasting and budgeting.

• Surveys which include:

• CCTV drainage surveys in Newquay and Tregoss Moor

• Additional topographical surveys and ecological surveys with associated reports including any additional consents required.

• Retaining wall surveys at Newquay railway station.

 A design package including completion of detail design for the following disciplines:

• Track

• Signalling / control systems in association with the panel at Goonbarrow and St Blazey Signal Boxes.

• Telecoms

• Electrical & Plant

• Civils

• Deliverables

• A design package that addresses/mitigates issues around deliverability, costs, and contingencies for potential cost overrun.

• A strategy for delivery and draft implementation agreement for delivery of the works, which will be subject to the governance of both the Customer and Network Rail.

• Estimated cost breakdowns for the infrastructure works required to deliver the Mid Cornwall Metro scheme and the ‘access for all’ footbridge at Par.

• An updated indicative programme for design, delivery, hand-back and close-out.

• Confirmed possession strategy for the delivery stages.

• Estimated cost plan reviewed against the overall cost estimate from the Contractor for PACE 2 to PACE 4, to support the Customer’s financial forecasting and budgeting.

• Surveys which include:

• CCTV drainage surveys in Newquay and Goss Moor;

• Additional topographical surveys and ecological surveys with associated reports including any additional consents required; and,

• Retaining wall surveys at Newquay railway station.

• Detail design for the following disciplines:

• Track

• (ii) Signalling / control systems in association with the panel at Goonbarrow and St Blazey Signal boxes.

• (iii) Telecoms

• (iv) Electrical & Plant

• (v) Civils

• Commence Station Change for alterations at Newquay.

• Commence Network Change

• Commence statutory process relating to level crossing alterations.

Necessary Consents to be obtained by Network Rail

• Network Rail to submit Station Change,

• Network Rail to submit Network Change,

• Network Rail to seek environmental consents

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Award of a contract without prior publication of a call for competition

Justification for selected award procedure:

The works, supplies or services can be provided only by a particular economic operator for the following reason: protection of exclusive rights, including intellectual property rights

Explanation

As the sole owner and operator of the national rail network including all of the network’s assets and liabilities and the land that the railway sits on, Network Rail are afforded exclusive rights over the rail network for the purposes of Regulation 32(2)(b)(iii) of the PCR 2015 and as such the Council have no other reasonable alternative than to award contracts in connection with the rail network to Network Rail.

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

Section V: Award of contract

Contract No: DN713623

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

29/02/2024

V.2.2) Information about tenders

Number of tenders received: 1

Number of tenders received from SMEs: 0

Number of tenders received from tenderers from EU Member States: 0

Number of tenders received from tenderers from non-EU Member States: 1

Number of tenders received by electronic means: 1

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

NETWORK RAIL INFRASTRUCTURE LIMITED

Waterloo General Office, London, United Kingdom, SE1 8SW

London

SE1 8SW

UK

NUTS: UKK3

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Initial estimated total value of the contract/lot:

Total value of the contract/lot: : 29 178 009.00  GBP

V.2.5) Information about subcontracting

Section VI: Complementary information

VI.4) Procedures for review

VI.4.1) Review body

Cornwall Council

Truro

UK

VI.5) Date of dispatch of this notice

04/03/2024

Coding

Commodity categories

ID Title Parent category
45234130 Ballast construction works Construction work for railways and cable transport systems
45234160 Catenarys construction works Construction work for railways and cable transport systems
45234111 City railway construction work Construction work for railways and cable transport systems
45235000 Construction work for airfields, runways and manoeuvring surfaces Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45213320 Construction work for buildings relating to railway transport Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
45234000 Construction work for railways and cable transport systems Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45234180 Construction work for railways workshop Construction work for railways and cable transport systems
45221200 Construction work for tunnels, shafts and subways Construction work for bridges and tunnels, shafts and subways
45221213 Covered or partially-covered railway excavations Construction work for bridges and tunnels, shafts and subways
45234113 Demolition of tracks Construction work for railways and cable transport systems
45236000 Flatwork Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45234110 Intercity railway works Construction work for railways and cable transport systems
45234140 Level crossing construction works Construction work for railways and cable transport systems
45234170 Locomotive-substations construction works Construction work for railways and cable transport systems
34944000 Points heating system Railway equipment
34946231 Rail clips Railway-track construction materials and supplies
34946230 Rail clips, bedplates and ties Railway-track construction materials and supplies
45213322 Rail terminal building construction work Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
34946110 Rails Railway-track construction materials and supplies
45221112 Railway bridge construction work Construction work for bridges and tunnels, shafts and subways
45234100 Railway construction works Construction work for railways and cable transport systems
45234112 Railway depot construction work Construction work for railways and cable transport systems
45234114 Railway embankment construction work Construction work for railways and cable transport systems
71311230 Railway engineering services Civil engineering consultancy services
66514130 Railway insurance services Freight insurance and Insurance services relating to transport
34621000 Railway maintenance or service vehicles, and railway freight wagons Rolling stock
34946120 Railway materials Railway-track construction materials and supplies
34941800 Railway points Rails and accessories
45234115 Railway signalling works Construction work for railways and cable transport systems
45213321 Railway station construction work Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
72212140 Railway traffic control software development services Programming services of application software
48140000 Railway traffic control software package Industry specific software package
60200000 Railway transport services Transport services (excl. Waste transport)
45221242 Railway tunnel construction work Construction work for bridges and tunnels, shafts and subways
45221122 Railway viaduct construction work Construction work for bridges and tunnels, shafts and subways
34632000 Railways traffic-control equipment Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment
34946100 Railway-track construction materials Railway-track construction materials and supplies
34946200 Railway-track construction supplies Railway-track construction materials and supplies
50000000 Repair and maintenance services Other Services
34942200 Signalling boxes Signalling equipment
34942000 Signalling equipment Railway equipment
45237000 Stage construction works Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
63711000 Support services for railway transport Support services for land transport
45234116 Track construction works Construction work for railways and cable transport systems
34945000 Track-alignment machinery Railway equipment
34943000 Train-monitoring system Railway equipment
45234129 Urban railway track construction works Construction work for railways and cable transport systems
45234120 Urban railway works Construction work for railways and cable transport systems

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
rebecca.riley@cornwall.gov.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.