Description of the goods or services required
To supply, deliver and install:
1 Factory Reconditioned 10000 litre milk buffer tank
1 Automatic tank washer and controller
C I P Wash System – 5 Wash Programmes
1 Automatic Dosing System
1 Touch Control Panel with Digital Thermometer
1 Hygienic milk transfer system including all fixed transfer pipe work to milk silo
1 Bottom Entry Milk Fill Kit with compressed air milk purge
1 Automatic Switchgear for control of condensing units and associated electrical
components of the system
1 KRS453DBE scroll (1 x 6hp) Three Phase Stainless Steel Condensing Units
Refrigeration work entails all inter-connecting pipe work, pipe insulation and fittings, plus all necessary control equipment.
Installation of electrical equipment to an adjacent approved electrical supply.
Guaranteed for a period of twelve months’ parts and labour.
Leak tested, commissioned and left in full working order.
|