Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Award Notice

Chorley Digital Office Park — A European Regional Development Fund (ERDF) Project

  • First published: 31 May 2018
  • Last modified: 31 May 2018
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
Published by:
Chorley Borough Council
Authority ID:
AA28568
Publication date:
31 May 2018
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The contract comprises the design and construction of a new build three storey office block known as “Chorley Digital Office Park” with associated car parking, external works, landscaping and external services.

The building is designed with a brick plinth to the Ground Floor with cream insulated render system to First and Second Floors with glazed curtain walling to the central core and entrance areas. Feature coloured “picture frame” panels frame the windows to the predominant elevations. A central service core provides amenities and affords access to the flexible office accommodation.

The building is a mechanically ventilated office block utilising high efficiency MVHR Units and Heated/cooled utilising VRF heat pumps. Each individual indoor VRF unit is individually temperature controlled to allow user control over their own environment and also to allow the building to be subdivided at a later date if required. The mechanical ventilation is controlled by CO2 sensors, so that the ventilation only operates when CO2 rise, thus saving energy.

Domestic Hot Water is provided by instantaneous electric water heaters at each range of sanitary appliances. Above Ground Drainage and condensate drainage (VRF System) is provided internal and external lighting are all LED to provide energy efficient lighting schemes. CCTV to the external areas is provided. Small Power and Voice and Data are generally distributed within the raised access floor and floor boxes are provided on a regular grid to allow tenant fit out at a later date.

External services are restricted to external MCW from a utility company water meter (provided by others), external LV mains from a utility company substation (provided by others) and incoming ducts for telecom services.

Structurally, the building comprises a multi storey steel frame with composite concrete metal deck floors and a lightweight cladding roof system surrounding a roof top plant deck. External elevations comprise cavity masonry walls up to first floor supported from a perimeter reinforced concrete ground beam. Upper floor elevations take support from the floor edge and steel frame. The building structure is generally stabilised against lateral loads using steel cross bracing.

The foundation strategy comprises mass concrete pad foundations taken down to the firm clay bearing strata as defined within the site investigation. The ground slab is part ground bearing part suspended due to the proximity of mature oak trees.

The general development site will require a cut fill exercise to be undertaken (by others) in order to create a development plateau capable of supporting general car parking areas and the building ground slab.

Site drainage comprises separate foul and surface water networks with necessary attenuation and will connect off site drainage being provided by others.

Full notice text

Contract award notice

Results of the procurement procedure

Section I: Contracting authority

I.1) Name and addresses

Chorley Council

Town Hall, Market Street

Chorley

PR7 1DP

UK

Contact person: Mrs Janet Hinds

Telephone: +44 1257515622

E-mail: janet.hinds@chorley.gov.uk

NUTS: UKD47

Internet address(es)

Main address: http://www.chorley.gov.uk/

Address of the buyer profile: http://www.chorley.gov.uk/

I.4) Type of the contracting authority

Regional or local authority

I.5) Main activity

General public services

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Chorley Digital Office Park — A European Regional Development Fund (ERDF) Project

Reference number: DN294142

II.1.2) Main CPV code

45000000

 

II.1.3) Type of contract

Works

II.1.4) Short description

The Digital Office Park is a new, prestigious office development that will introduce a unique offer to the Lancashire marketplace to support the growth of an important and expanding sector. A new 5 016 m2 grade A office facility will be constructed to cater for the needs of digital sector SME businesses. The space will be delivered to BREEAM Excellent standard and has been designed to cater for the needs of businesses in different stages of their life-cycle. Accommodation will be offered across 3 floors. The scheme will be delivered on a site located to the North West of Chorley Town Centre, on Euxton Lane. The scheme promoter, with ERDF support, is Chorley Council. A Principal Contractor is required to deliver both design and build services. The Authority has procured design services to RIBA Stage 4 and will retain the services of the current Design Team.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Value excluding VAT: 5 922 650.00  GBP

II.2) Description

II.2.2) Additional CPV code(s)

45100000

45111240

45111290

45112400

45112700

45213100

45213150

45223300

45233222

II.2.3) Place of performance

NUTS code:

UKD47

II.2.4) Description of the procurement

The contract comprises the design and construction of a new build three storey office block known as “Chorley Digital Office Park” with associated car parking, external works, landscaping and external services.

The building is designed with a brick plinth to the Ground Floor with cream insulated render system to First and Second Floors with glazed curtain walling to the central core and entrance areas. Feature coloured “picture frame” panels frame the windows to the predominant elevations. A central service core provides amenities and affords access to the flexible office accommodation.

The building is a mechanically ventilated office block utilising high efficiency MVHR Units and Heated/cooled utilising VRF heat pumps. Each individual indoor VRF unit is individually temperature controlled to allow user control over their own environment and also to allow the building to be subdivided at a later date if required. The mechanical ventilation is controlled by CO2 sensors, so that the ventilation only operates when CO2 rise, thus saving energy.

Domestic Hot Water is provided by instantaneous electric water heaters at each range of sanitary appliances. Above Ground Drainage and condensate drainage (VRF System) is provided internal and external lighting are all LED to provide energy efficient lighting schemes. CCTV to the external areas is provided. Small Power and Voice and Data are generally distributed within the raised access floor and floor boxes are provided on a regular grid to allow tenant fit out at a later date.

External services are restricted to external MCW from a utility company water meter (provided by others), external LV mains from a utility company substation (provided by others) and incoming ducts for telecom services.

Structurally, the building comprises a multi storey steel frame with composite concrete metal deck floors and a lightweight cladding roof system surrounding a roof top plant deck. External elevations comprise cavity masonry walls up to first floor supported from a perimeter reinforced concrete ground beam. Upper floor elevations take support from the floor edge and steel frame. The building structure is generally stabilised against lateral loads using steel cross bracing.

The foundation strategy comprises mass concrete pad foundations taken down to the firm clay bearing strata as defined within the site investigation. The ground slab is part ground bearing part suspended due to the proximity of mature oak trees.

The general development site will require a cut fill exercise to be undertaken (by others) in order to create a development plateau capable of supporting general car parking areas and the building ground slab.

Site drainage comprises separate foul and surface water networks with necessary attenuation and will connect off site drainage being provided by others.

II.2.5) Award criteria

Quality criterion: Project programme / Weighting: 12 %

Quality criterion: Staffing project team structure / Weighting: 8 %

Quality criterion: Service delivery and methodology / Weighting: 8 %

Quality criterion: Contract monitoring and management / Weighting: 6 %

Quality criterion: Community benefits / Weighting: 3 %

Quality criterion: Sustainable procurement / Weighting: 3 %

Price / Weighting:  60 %

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: Yes

Identification of the project:

Chorley Council Digital Office Park. Project Reference Number: OC19R15P0284, A European Regional Development Fund (ERDF) Project

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Open procedure

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2017/S 177-361688

Section V: Award of contract

Contract No: DN294142

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

21/05/2018

V.2.2) Information about tenders

Number of tenders received: 6

Number of tenders received from SMEs: 2

Number of tenders received from tenderers from EU Member States: 0

Number of tenders received from tenderers from non-EU Member States: 0

Number of tenders received by electronic means: 6

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Willmott Dixon Construction Ltd

768173

Spirella 2, Icknield way

Letchworth Garden City

SG6 4GY

UK

NUTS: UKD3

Internet address(es)

URL: www.willmottdixon.co.uk

The contractor is an SME: No

V.2.4) Information on value of the contract/lot (excluding VAT)

Initial estimated total value of the contract/lot:

Total value of the contract/lot: : 5 922 650.00  GBP

V.2.5) Information about subcontracting

The contract is likely to be subcontracted

Value or proportion likely to be subcontracted to third parties

Proportion: 80 %

Short description of the part of the contract to be subcontracted:

Structural steel frame - 10 %.

Curtain walling and windows -10 %.

Mechanical and Electrical installation -30 %.

Roof Cladding and rainwater installation - 10 %.

Groundworks and drainage - 20 %.

Section VI: Complementary information

VI.4) Procedures for review

VI.4.1) Review body

The Monitoring Officer, Chorley Borough Council

Town Hall, Market Street

Chorley

PR7 1DP

UK

Telephone: +44 1257515151

E-mail: chris.moister@chorley.gov.uk

Internet address(es)

URL: http://www.chorley.gov.uk/

VI.4.3) Review procedure

Precise information on deadline(s) for review procedures:

Chorley Borough Council incorporated a standstill period at the point information on the award decision of the contract was communicated to tenderers. That notification provided full information on the award decision. The standstill period, was for a minimum of 10 calendar days and provided time for unsuccessful tenderers to challenge the award decision before the contract is entered into the Public Contracts Regulations 2015 (SI 2015 No 102) provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland) within 30 days of knowledge or constructive knowledge of breach.

VI.5) Date of dispatch of this notice

24/05/2018

Coding

Commodity categories

ID Title Parent category
45000000 Construction work Construction and Real Estate
45213100 Construction work for commercial buildings Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
45112400 Excavating work Excavating and earthmoving work
45111240 Ground-drainage work Demolition, site preparation and clearance work
45112700 Landscaping work Excavating and earthmoving work
45213150 Office block construction work Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
45223300 Parking lot construction work Structures construction work
45233222 Paving and asphalting works Construction, foundation and surface works for highways, roads
45111290 Primary works for services Demolition, site preparation and clearance work
45100000 Site preparation work Construction work

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
janet.hinds@chorley.gov.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.