Total quantity or scope of tender
The successful contractor will be required to provide:-
• Auto CAD Drawings
• Structural calculations
• Structural analysis rigging load
• All health and safety documentation
• Qualified and experienced crew for install and dismantle
• A dedicated foreman for the site build and derig
• Accommodation and transport
• Equipment hire required to build the stage
• To complete a Section 8 NEC3 Engineering and Construction Short Contract
• Compliance with CDM Regs
• A programme of works for both the setup and derig as part of the method statement.
Swansea Council will provide:-
• Trakway for HGV access for the stage build and derig
• A water supply
• An electric supply 16a plus earth bonding of the substructure
• Crew welfare provisions (site cabin; toilets)
• On site outdoor storage for spare equipment and crates
• A site manager
• A full schedule for the build and derig of the event site
|