Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Award Notice

Design and Construction of Berth 4

  • First published: 31 May 2021
  • Last modified: 31 May 2021
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
Published by:
London Gateway Port Limited
Authority ID:
AA80648
Publication date:
31 May 2021
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The design and construction of Berth 4:

— A 430 m extension of the existing deep-water quay,

— mooring dolphin,

— fenders, bollards and other quayside furniture,

— heavy-duty rails and foundations for quay cranes,

— dredging of the berth pocket and approaches,

— berth pocket scour protection,

— earthworks, removal of existing surcharge material and ground improvement,

— 10 on shore stacks to be operated by automated stacking cranes (ASCs),

— reefer frames,

— heavy duty pavements and other surfacing,

— surface water drainage,

— hazardous container storage including pipework and holding tanks for contaminated effluent,

— fire mains and associated pits and valves,

— HV, LV and communications conduits/pits,

— LV and HV electrical works including sub-stations, switchgear and transformers,

— earthing systems,

— electrical control and protection systems,

— lighting,

— testing and commissioning.

Full notice text

Contract award notice – utilities

Section I: Contracting entity

I.1) Name and addresses

London Gateway Port Limited

No 1 London Gateway

Stanford-le-hope

SS17 9DY

UK

Contact person: Oluchi Nwaiwu

Telephone: +44 7990566247

E-mail: oluchi.nwaiwu@dpworld.com

NUTS: UK

Internet address(es)

Main address: www.londongateway.com

I.6) Main activity

Port-related activities

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Design and Construction of Berth 4

Reference number: C2575

II.1.2) Main CPV code

45244000

 

II.1.3) Type of contract

Works

II.1.4) Short description

The design and construction of Berth 4:

— a 430 m extension of the existing deep-water quay,

— mooring dolphin,

— fenders, bollards and other quayside furniture,

— heavy-duty rails and foundations for quay cranes,

— dredging of the berth pocket and approaches,

— berth pocket scour protection,

— earthworks, removal of existing surcharge material and ground improvement,

— 10 on shore stacks to be operated by automated stacking cranes (ASCs),

— reefer frames,

— heavy duty pavements and other surfacing,

— surface water drainage,

— hazardous container storage including pipework and holding tanks for contaminated effluent,

— fire mains and associated pits and valves,

— HV, LV and communications conduits/pits,

— LV and HV electrical works including sub-stations, switchgear and transformers,

— earthing systems,

— electrical control and protection systems,

— lighting,

— testing and commissioning.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Lowest offer:   / Highest offer:  

II.2) Description

II.2.3) Place of performance

NUTS code:

UK


Main site or place of performance:

London Gateway Port, No 1 London Gateway Drive, Stanford Le Hope, Essex, SS179DY.

II.2.4) Description of the procurement

The design and construction of Berth 4:

— A 430 m extension of the existing deep-water quay,

— mooring dolphin,

— fenders, bollards and other quayside furniture,

— heavy-duty rails and foundations for quay cranes,

— dredging of the berth pocket and approaches,

— berth pocket scour protection,

— earthworks, removal of existing surcharge material and ground improvement,

— 10 on shore stacks to be operated by automated stacking cranes (ASCs),

— reefer frames,

— heavy duty pavements and other surfacing,

— surface water drainage,

— hazardous container storage including pipework and holding tanks for contaminated effluent,

— fire mains and associated pits and valves,

— HV, LV and communications conduits/pits,

— LV and HV electrical works including sub-stations, switchgear and transformers,

— earthing systems,

— electrical control and protection systems,

— lighting,

— testing and commissioning.

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Open procedure

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: No

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2019/S 086-207822

Section V: Award of contract

Title: Design and Construction of Berth 4

A contract/lot is awarded: No

V.1 Information on non-award

Section VI: Complementary information

VI.3) Additional information

Due to significant delays caused largely by the Covid-19 pandemic, and other issues affecting the project that have arisen during this time, the completion and award of this tender process has been delayed beyond a period that would be considered reasonable in accordance with the applicable laws and regulations that govern such tendering processes.

Therefore, we are cancelling this tender process and shall be issuing a new tender process for the project, which will be updated with additional details in respect of the technical issues associated with the project as well as further updated details relating to site conditions and the relevant authorities approvals.

VI.4) Procedures for review

VI.4.1) Review body

London Gateway Port Ltd

London Gateway Port Ltd

Essex

SS17 9DY

UK

Telephone: +44 7990566247

E-mail: oluchi.nwaiwu@dpworld.com

VI.5) Date of dispatch of this notice

26/05/2021

Coding

Commodity categories

ID Title Parent category
45244000 Marine construction works Construction work for water projects

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
oluchi.nwaiwu@dpworld.com
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.