Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

UK6

Strategic Flood Risk Assessment and Water Cycle Study

  • First published: 29 May 2026
  • Last modified: 29 May 2026
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-060651
Published by:
Borough Council of Kings Lynn and West Norfolk
Authority ID:
AA83471
Publication date:
29 May 2026
Deadline date:
-
Notice type:
UK6
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The Borough Council of Kings Lynn and West Norfolk are required to undertake an Integrated SFRA and Water Cycle Study as an essential part of the pre-production/evidence gathering stages of the Local Plan and in preparation of the Sustainability Appraisal (SA).The Council is in the process of producing a New Local Plan (NLP) and this will require an update to the existing evidence base for the recently adopted Local Plan (March 2025). For this plan, the Council produced a joint Level 1 Strategic Flood Risk Assessment (SFRA) with other Norfolk Authorities. A separate Level 2 assessment was also produced to inform the allocation of sites. A current Water Cycle Study exists, but this is now considered out of date and should form part of the wider SFRA review. A Surface Water Management Plan was produced in 2012, but this is now considered out of date and will be replaced by this SFRA review.

Full notice text

Scope

Procurement reference

BCKLWN378

Procurement description

The Borough Council of Kings Lynn and West Norfolk are required to undertake an Integrated SFRA and Water Cycle Study as an essential part of the pre-production/evidence gathering stages of the Local Plan and in preparation of the Sustainability Appraisal (SA).

The Council is in the process of producing a New Local Plan (NLP) and this will require an update to the existing evidence base for the recently adopted Local Plan (March 2025). For this plan, the Council produced a joint Level 1 Strategic Flood Risk Assessment (SFRA) with other Norfolk Authorities. A separate Level 2 assessment was also produced to inform the allocation of sites. A current Water Cycle Study exists, but this is now considered out of date and should form part of the wider SFRA review. A Surface Water Management Plan was produced in 2012, but this is now considered out of date and will be replaced by this SFRA review.

Contracting authority

Borough Council of Kings Lynn and West Norfolk

Identification register:

  • GB-PPON

Address 1: Kings Court, Chapel Street

Town/City: King's Lynn

Postcode: PE30 1EX

Country: United Kingdom

Public Procurement Organisation Number: PZQQ-4816-TPLW

NUTS code: UKH16

Email: procurementtenders@west-norfolk.gov.uk

Telephone: +44 1553616200

Organisation type: Public authority - sub-central government

Supplier

Wallingford Hydrosolutions Limited

Identification register:

  • GB-COH

Address 1: Stables 4 Howbery Business Park, Benson Lane

Town/City: Wallingford

Postcode: OX10 8BA

Country: United Kingdom

Companies House: 05025973

NUTS code: UKJ14

Email: support@hydrosolutions.co.uk

Type:

  • SME

Procedure

Procedure type

Below threshold - open competition

Contract

Strategic Flood Risk Assessment and Water Cycle Study

ID: 1

Status: Pending

Related lots

1

Date the contract will be signed (estimated)

28 May 2026, 23:59PM

Can this contract be extended?: Yes

Value

74704.00 GBP Including VAT

Main category

Services

CPV classifications

  • 90700000 - Environmental services
  • 90711100 - Risk or hazard assessment other than for construction
  • 90712000 - Environmental planning

Delivery regions

  • UKH16 - North and West Norfolk

Is the total value above threshold?

Below threshold

Contract dates (estimated)

29 May 2026, 00:00AM to 26 April 2027, 23:59PM

Extension end date (if all the extensions are used): 26 April 2028

Suppliers

  • GB-COH-05025973

Coding

Commodity categories

ID Title Parent category
90712000 Environmental planning Environmental management
90700000 Environmental services Sewage, refuse, cleaning and environmental services
90711100 Risk or hazard assessment other than for construction Environmental impact assessment other than for construction

Delivery locations

ID Description
There are no delivery locations for this notice.

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.