Contract award notice
Results of the procurement procedure
Section I: Contracting
authority
I.1) Name and addresses
LondonWaste Limited
EcoPark, 4 Advent Way
London
N18 3AG
UK
Contact person: Jim Kendall
Telephone: +44 2088845530
E-mail: jim.kendall@londonwaste.co.uk
NUTS: UKI
Internet address(es)
Main address: http://www.londonwaste.co.uk
I.4) Type of the contracting authority
Body governed by public law
I.5) Main activity
Environment
Section II: Object
II.1) Scope of the procurement
II.1.1) Title
Refurbishment of Cooling Towers.
Reference number: LWL160NG0716.003
II.1.2) Main CPV code
45251150
II.1.3) Type of contract
Services
II.1.4) Short description
LondonWaste Ltd owns and operates the EcoPark Energy Centre located in Edmonton, London. The Energy Centre is an Energy-from-Waste facility comprising five boilers burning approximately 500 000 tonnes of municipal residual waste per year, in a continuous 24-hour operation, 7 days per week.
Exhaust steam from the Energy Centre's four turbines is condensed by cooling water passing through the condenser's tubes before returning to the Five Cell Head Wrightson cooling towers and subsequent recirculation. This contract is for the refurbishment of Cells 1 and 2 of the Cooling Towers.
II.1.6) Information about lots
This contract is divided into lots:
No
II.1.7) Total value of the procurement
Lowest offer:
150 000.00
GBP/ Highest offer:
250 000.00
GBP
II.2) Description
II.2.3) Place of performance
NUTS code:
UKI
Main site or place of performance:
LONDON.
II.2.4) Description of the procurement
LondonWaste Ltd owns and operates the EcoPark Energy Centre located in Edmonton, London. The Energy Centre is an Energy-from-Waste facility comprising five boilers burning approximately 500 000 tonnes of municipal residual waste per year, in a continuous 24-hour operation, 7 days per week.
Exhaust steam from the Energy Centre's four turbines is condensed by cooling water passing through the condenser's tubes before returning to the Five Cell Head Wrightson cooling towers and subsequent recirculation. This contract is for the refurbishment of Cells 1 and 2 of the Cooling Towers.
II.2.5) Award criteria
Price
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Section IV: Procedure
IV.1) Description
IV.1.1) Type of procedure
Open procedure
IV.1.8) Information about Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement:
Yes
Section V: Award of contract
Contract No: LWL160NG0716.003
A contract/lot is awarded:
Yes
V.2 Award of contract
V.2.1) Date of conclusion of the contract
26/09/2016
V.2.2) Information about tenders
Number of tenders received: 2
The contract has been awarded to a group of economic operators:
No
V.2.3) Name and address of the contractor
Costain Ltd
Unit 3 Eco Business Park, Eco Way, Dunscroft
Doncaster
DN7 4JJ
UK
NUTS: UKI
The contractor is an SME:
No
V.2.4) Information on value of the contract/lot (excluding VAT)
Initial estimated total value of the contract/lot:
Total value of the contract/lot:
: 150 000.00
GBP
V.2.5) Information about subcontracting
Section VI: Complementary information
VI.3) Additional information
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=225763446
GO Reference: GO-2016114-PRO-9063431.
VI.4) Procedures for review
VI.4.1) Review body
LondonWaste Ltd
Advent Way
London
N18 3AG
UK
VI.5) Date of dispatch of this notice
04/11/2016