Contract Award Notice

Framework Agreement to Supply Carbon and Energy Infrastructure Upgrades Across the Public Sector in

  • First published: 03 November 2017
  • Last modified: 03 November 2017
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
Published by:
Countess of Chester Hospital NHS Foundation Trust
Authority ID:
AA20287
Publication date:
03 November 2017
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The Countess of Chester Hospital NHS Foundation Trust (COCH) and its partner the Carbon and Energy Fund Ltd seek to procure and manage a framework of capable contractors to upgrade carbon and energy infrastructure and services to the public sector in Ireland, which member hospitals intend to use under an intergovernmental partnership for Community Health Organisations (CHO) and voluntary hospitals and hospital groups and their estate, This OJEU seeks to establish that framework. See www.carbonandenergyfund.net for information of how the corresponding framework works in the UK. Framework bidders will be invited to offer Contracting Authorities infrastructural upgrades and services that include guaranteed reduced running costs, reduced energy consumption and reduced carbon emissions plus the management those assets and services for the duration of the contract which may be 15 to 30 years ( after installation ) or the life of the plant. Management of assets refers to the bidder taking all the risks and costs relating to the provision of all services including design, procurement, commissioning, operation, lifecycling and continued guaranteed performance of the installation using the bidders staff, contractors, or in some circumstances those of the Contracting Authority as may be agreed in the contract. Infrastructure improvements or upgrades bid may include combined heat and power, boilers ( steam LTHW or MTHW ), district heating or cooling, heat recovery, chilling, heat pumps, fuel cells, chillers, air handling, controls, solar PV, lighting, insulation ( roof, pipes, building, cladding or related), glazing, water savings, water abstraction, effluent treatment, waste to energy, pyrolysis, clinical waste destruction or conversion, processing or removal, biomass, biofuel, biogas, grid reinforcement, electrical ( HV, MV and LV ) improvements ( demand reduction, re-profiling, generation, aggregation, co-generation, tri-generation, wind generation, standby generation ), private wire, virtual power station, load or power management, gas supplies ( natural, anaerobic digestion or biogas, on or attached to the national grid or not ) technology to change or improve maintenance or lifecycling arrangements, medical or paramedical, records systems, building management, BMS, maintenance management, preventative maintenance, soft facilities management, electric or hybrid vehicles, vehicle charging, vehicle maintenance, medical equipment charging or improvements, transfer of staff, subcontracts or subcontractors and any related technologies or services that are relevant. In many cases the selected supplier may be expected to take over existing energy facilities building/ boiler house or plant rooms relevant to the project, sometimes under license and sometimes under a simple lease, for the operational period of the contract. In some cases the contract may include the construction or modification of existing buildings or structures associated with the delivery of services. Details of the site, energy usage and the existing installation will be set out in the memorandum of information for each project, and bidders will be encouraged to attend the site to fully investigate the existing plant plus cost and plan their bids. Bids may be supported by variant bids going beyond any core proposal included in the project documentation, to cover additional operation and maintenance of existing plant, facilities management services and equipment as makes sense. In this way bidders are encouraged to produce the best bid they can using all the available resources or skills they may possess. It is normal that all bids are in many ways unique and the CEF evaluation methodology will include the way to fairly evaluate different bids and variants. The contracting authority may accept consortia onto the framework if required in order to get the correct skill and experience mix.

Full notice text

Contract award notice

Results of the procurement procedure

Section I: Contracting authority

I.1) Name and addresses

Countess of Chester Hospital NHS Foundation Trust

Liverpool Road

Chester

CH2 1UL

UK

Telephone: +44 1244365143

E-mail: info@coch-cps.co.uk

NUTS: UK

Internet address(es)

Main address: www.coch-cps.co.uk

Address of the buyer profile: www.coch-cps.co.uk

I.1) Name and addresses

This Framework Agreement for use by the whole Irish public sector including the public sector organisations identified in 2015 Register of Public Sector Bodies. http://www.cso.ie/en/methods/nationalaccounts/classificationdecisions/registerofpublicsectorbodiesinireland/

Republic of Ireland

IE

E-mail: info@coch-cps.co.uk

NUTS: IE

Internet address(es)

Main address: http://www.cso.ie/en/methods/nationalaccounts/classificationdecisions/registerofpublicsectorbodiesinireland/

I.2) Joint procurement

The contract involves joint procurement

In the case of joint procurement involving different countries – applicable national procurement law:

Conditions of tender for further competitions will be subject to the laws of England & Wales.

Contracts called off from the framework agreement will be subject to the laws of the Republic of Ireland.

The contract is awarded by a central purchasing body

I.4) Type of the contracting authority

Body governed by public law

I.5) Main activity

Health

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Framework Agreement to Supply Carbon and Energy Infrastructure Upgrades Across the Public Sector in Ireland.

Reference number: F/037/CEFI/16/CP

II.1.2) Main CPV code

71314000

 

II.1.3) Type of contract

Services

II.1.4) Short description

This opportunity seeks to establish a framework agreement for capable suppliers to provide low carbon energy efficient infrastructure services, improvements and upgrades to existing or new publicly funded health facilities in Ireland. These upgrades should offer client public bodies guaranteed reduced running costs, reduced energy consumption and reduced carbon emissions. Proposals should guarantee minimum levels of savings over the period of each contract let under the framework which may be for 15 to 30 years long ( after installation ), or the life of the plant installed. This framework agreement will be available for use by the entire Irish public sector as listed at http://bit.ly/2eDaNvc

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Value excluding VAT: 100 000 000.00  EUR

II.2) Description

II.2.2) Additional CPV code(s)

09300000

65400000

45251000

45300000

71315000

71313000

71312000

66000000

71314300

51100000

71314310

71314200

45200000

50700000

71320000

31527260

45315300

31682000

II.2.3) Place of performance

NUTS code:

IE

UK


Main site or place of performance:

This Framework Agreement for use by the whole Irish public sector including the public sector organisations identified in 2015 Register of Public Sector Bodies. http://bit.ly/2eDaNvc

II.2.4) Description of the procurement

The Countess of Chester Hospital NHS Foundation Trust (COCH) and its partner the Carbon and Energy Fund Ltd seek to procure and manage a framework of capable contractors to upgrade carbon and energy infrastructure and services to the public sector in Ireland, which member hospitals intend to use under an intergovernmental partnership for Community Health Organisations (CHO) and voluntary hospitals and hospital groups and their estate, This OJEU seeks to establish that framework. See www.carbonandenergyfund.net for information of how the corresponding framework works in the UK. Framework bidders will be invited to offer Contracting Authorities infrastructural upgrades and services that include guaranteed reduced running costs, reduced energy consumption and reduced carbon emissions plus the management those assets and services for the duration of the contract which may be 15 to 30 years ( after installation ) or the life of the plant. Management of assets refers to the bidder taking all the risks and costs relating to the provision of all services including design, procurement, commissioning, operation, lifecycling and continued guaranteed performance of the installation using the bidders staff, contractors, or in some circumstances those of the Contracting Authority as may be agreed in the contract. Infrastructure improvements or upgrades bid may include combined heat and power, boilers ( steam LTHW or MTHW ), district heating or cooling, heat recovery, chilling, heat pumps, fuel cells, chillers, air handling, controls, solar PV, lighting, insulation ( roof, pipes, building, cladding or related), glazing, water savings, water abstraction, effluent treatment, waste to energy, pyrolysis, clinical waste destruction or conversion, processing or removal, biomass, biofuel, biogas, grid reinforcement, electrical ( HV, MV and LV ) improvements ( demand reduction, re-profiling, generation, aggregation, co-generation, tri-generation, wind generation, standby generation ), private wire, virtual power station, load or power management, gas supplies ( natural, anaerobic digestion or biogas, on or attached to the national grid or not ) technology to change or improve maintenance or lifecycling arrangements, medical or paramedical, records systems, building management, BMS, maintenance management, preventative maintenance, soft facilities management, electric or hybrid vehicles, vehicle charging, vehicle maintenance, medical equipment charging or improvements, transfer of staff, subcontracts or subcontractors and any related technologies or services that are relevant. In many cases the selected supplier may be expected to take over existing energy facilities building/ boiler house or plant rooms relevant to the project, sometimes under license and sometimes under a simple lease, for the operational period of the contract. In some cases the contract may include the construction or modification of existing buildings or structures associated with the delivery of services. Details of the site, energy usage and the existing installation will be set out in the memorandum of information for each project, and bidders will be encouraged to attend the site to fully investigate the existing plant plus cost and plan their bids. Bids may be supported by variant bids going beyond any core proposal included in the project documentation, to cover additional operation and maintenance of existing plant, facilities management services and equipment as makes sense. In this way bidders are encouraged to produce the best bid they can using all the available resources or skills they may possess. It is normal that all bids are in many ways unique and the CEF evaluation methodology will include the way to fairly evaluate different bids and variants. The contracting authority may accept consortia onto the framework if required in order to get the correct skill and experience mix.

II.2.5) Award criteria

Quality criterion: Technical: Project Management Approach / Weighting: 15 %

Quality criterion: Technical: Financial Response / Weighting: 10 %

Quality criterion: Technical: Approach to design and construction / Weighting: 35 %

Quality criterion: Technical: Approach to Service Delivery / Weighting: 25 %

Quality criterion: Technical: Project programme and timescales / Weighting: 15 %

Quality criterion: Technical Total / Weighting: 100 %

Quality criterion: Commercial / Weighting: NPV bid/NPV best bid

Quality criterion: Total Score / Weighting: TechnicalxCommercial

Cost criterion: Commercial evaluation / Weighting: NPVbid/NPV best bid

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Open procedure

IV.1.3) Information about a framework agreement or a dynamic purchasing system

The procurement involves the establishment of a framework agreement

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2017/S 021-035480

Section V: Award of contract

Lot No: 1

Contract No: 1

Title: Framework Agreement to Supply Carbon and Energy Infrastructure Upgrades Across the Public Sector in Ireland

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

20/05/2017

V.2.2) Information about tenders

Number of tenders received: 12

The contract has been awarded to a group of economic operators: Yes

V.2.3) Name and address of the contractor

Ameresco Limited

60 Buckingham Palace Road

London

SW1W 0AH

UK

NUTS: UK

The contractor is an SME: No

V.2.3) Name and address of the contractor

Asset Plus Energy Performance Limited

The Hub, Fowler Avenue, Farnborough Business Park

Farnborough

GU14 7BT

UK

NUTS: UK

The contractor is an SME: No

V.2.3) Name and address of the contractor

Cynergin Projects Limited

Davidson House, Forbury Square, 2nd Floor

Reading

RG1 3EU

UK

NUTS: UK

The contractor is an SME: No

V.2.3) Name and address of the contractor

Doosan Babcock

Porterfield Road

Renfrew

PA4 8DJ

UK

NUTS: UK

The contractor is an SME: No

V.2.3) Name and address of the contractor

ENER-G PLC

Edison House, Daniel Adamson Road

Salford

M50 1DT

UK

NUTS: UK

The contractor is an SME: No

V.2.3) Name and address of the contractor

Imtech — Low Carbon Solutions

Imtech House, 33-35 Woodthorpe Road

Ashford

TW15 2RP

UK

NUTS: UK

The contractor is an SME: No

V.2.3) Name and address of the contractor

Vector Workplace and Facility Management Limited trading as Aramark Workplace Solutions

Northern Cross, Malahide Road

Dublin

D17 HR92

IE

NUTS: IE

The contractor is an SME: No

V.2.3) Name and address of the contractor

Veolia Energy Ireland PLC

Innovation House, Old Finglas Road

Glasnevin

Dublin 11

IE

NUTS: IE

The contractor is an SME: No

V.2.3) Name and address of the contractor

Vital Energi Utilities

Century House, Roman Road

Blackburn

BB1 2LD

UK

NUTS: UK

The contractor is an SME: No

V.2.3) Name and address of the contractor

FES Energy Solutions Ltd

610915

Knockbrack House, Matthews Lane, Donore Road

Drogheda

IE

NUTS: IE0

The contractor is an SME: Yes

V.2.4) Information on value of the contract/lot (excluding VAT)

Total value of the contract/lot: : 10 000 000.00  EUR

V.2.5) Information about subcontracting

The contract is likely to be subcontracted

Section VI: Complementary information

VI.3) Additional information

This Contract Award Notice is for the award of a framework agreement. As such the actual values are unknown and are therefore estimates only.

VI.4) Procedures for review

VI.4.1) Review body

Royal Courts of Justice

London

UK

VI.4.2) Body responsible for mediation procedures

Countess of Chester Hospital NHS Foundation Trust

Chester

UK

VI.4.3) Review procedure

Precise information on deadline(s) for review procedures:

The Countess of Chester Hospital NHS Foundation Trust incorporated a standstill period at the point information on the award of the contract was communicated to tenderers. That notification provided full information on the award decision. The standstill period, which was for a minimum of 10 calendar days, provided time for unsuccessful tenderers to challenge the award decision before the framework agreement was entered into. No challenge was received.

The Public Contracts Regulations 2015 provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland).

VI.4.4) Service from which information about the review procedure may be obtained

Countess of Chester Hospital NHS Foundation Trust

Chester

UK

VI.5) Date of dispatch of this notice

31/10/2017

Coding

Commodity categories

ID Title Parent category
45300000 Building installation work Construction work
71315000 Building services Consultative engineering and construction services
45251000 Construction works for power plants and heating plants Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry
31682000 Electricity supplies Electrical supplies and accessories
45315300 Electricity supply installations Electrical installation work of heating and other electrical building-equipment
09300000 Electricity, heating, solar and nuclear energy Petroleum products, fuel, electricity and other sources of energy
71314000 Energy and related services Consultative engineering and construction services
71314300 Energy-efficiency consultancy services Energy and related services
71314200 Energy-management services Energy and related services
71320000 Engineering design services Engineering services
71313000 Environmental engineering consultancy services Consultative engineering and construction services
66000000 Financial and insurance services Finance and Related Services
71314310 Heating engineering services for buildings Energy and related services
51100000 Installation services of electrical and mechanical equipment Installation services (except software)
31527260 Lighting systems Spotlights
65400000 Other sources of energy supplies and distribution Public utilities
50700000 Repair and maintenance services of building installations Repair and maintenance services
71312000 Structural engineering consultancy services Consultative engineering and construction services
45200000 Works for complete or part construction and civil engineering work Construction work

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
info@coch-cps.co.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.