Periodic indicative notice – utilities
This notice is a call for competition
Section I: Contracting
entity
I.1) Name and addresses
South West Water
Exeter
EX2 7HR
UK
Contact person: Christopher Dorain
Telephone: +44 1392443952
E-mail: groupprocurement@pennon-group.co.uk
NUTS: UKK4
Internet address(es)
Main address: www.pennon-group.co.uk
I.3) Communication
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be sent to the abovementioned address
I.6) Main activity
Water
Section II: Object
II.1) Scope of the procurement
II.1.1) Title
Wind Turbine at Stithians, Cornwall.
Reference number: 00018635
II.1.2) Main CPV code
31121330
II.1.3) Type of contract
Supplies
II.1.4) Short description
The scheme will deliver a single 225-250kW wind turbine and associated infrastructure on land west of Stithians in Cornwall providing power by a private cable to a Water Treatment Works nearby.
It is expected that the turbine will produce around 700,000-800,000kWh per annum accounting for approximately 40 % of the site's energy usage. This scheme will contribute towards SWW's aim to have 20 % of their energy coming from renewable energy sources by 2020.
II.1.6) Information about lots
This contract is divided into lots:
No
II.2) Description
II.2.3) Place of performance
NUTS code:
UKK3
Main site or place of performance:
Stithians Water Treatment works, Cornwall.
II.2.4) Description of the procurement
The scheme will deliver a single 225-250 kW wind turbine and associated infrastructure on Land West of Little Lansenwith, Tretheague, Stithians, Cornwall providing power by a private cable to Stithians Water Treatment Works nearby.
It is expected that the turbine will produce around 700 000 - 800 000 kWh per annum accounting for approximately 40 % of the site's energy usage. This scheme will contribute towards SWW's aim to have 20 % of their energy coming from renewable energy sources by 2020.
Specification
A 3- bladed wind turbine between 225-250 kW with a total height of 58 m or less and a rotor diameter of 35 m or less.
a) Annual Energy Production (AEP) of 700 000 or greater with an annual average wind speed on site of 7.62 m/s;
b) The site is not eligible for export so all power must be used on site (i.e. at the WTW).
These dimensions will enable the turbine to fit within our planning constraints. Due to ecological constraints on site any pre-commencement works would need to be completed in February, subject to gaining planning permission and installation of the wind turbine would be expected to follow these works.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
Section III: Legal, economic, financial and technical information
III.1) Conditions for participation
III.1.1) Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
List and brief description of conditions:
The purpose of this PIN Notice is a call for competition to ascertain which suppliers exist for the delivery of a wind turbine and are interested in this procurement.
III.1.2) Economic and financial standing
List and brief description of selection criteria:
The purpose of this PIN Notice is a call for competition to ascertain which suppliers exist for the delivery of a wind turbine and are interested in this procurement.
Minimum level(s) of standards required:
NA.
III.1.3) Technical and professional ability
List and brief description of selection criteria:
The purpose of this PIN Notice is a call for competition to ascertain which suppliers exist for the delivery of a wind turbine and are interested in this procurement.
Minimum level(s) of standards required:
The scheme will deliver a single 225-250 kW wind turbine and associated infrastructure on Land West of Little Lansenwith, Tretheague, Stithians, Cornwall providing power by a private cable to Stithians Water Treatment Works nearby.
It is expected that the turbine will produce around 700 000 - 800 000 kWh per annum accounting for approximately 40 % of the site's energy usage. This scheme will contribute towards SWW's aim to have 20 % of their energy coming from renewable energy sources by 2020.
Specification — A three bladed wind turbine between 225-250 kW with a total height of 58 m or less and a rotor diameter of 35 m or less.
Annual Energy Production (AEP) of 700 000 or greater with an annual average wind speed on site of 7.62 m/s.
The site is not eligible for export so all power must be used on site.
These dimensions will enable the turbine to fit within our planning constraints. Due to ecological constraints on site any pre-commencement works need to be completed in Feb 2018.
III.2) Conditions related to the contract
Section IV: Procedure
IV.1) Description
IV.1.1) Type of procedure
Negotiated with call for competition
IV.1.8) Information about Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement:
No
IV.2) Administrative information
IV.2.2) Time limit for the receipt of applications for an invitation to tender or to negotiate/Time limit for receipt of expressions of interest
Date:
01/12/2017
Local time: 12:00
IV.2.4) Languages in which tenders or requests to participate may be submitted
EN
Section VI: Complementary information
VI.3) Additional information
The purpose of this PIN Notice is a call for competition to ascertain which suppliers exist for the delivery of a wind turbine and are interested in this procurement.
The intention is for the procurement to deliver a single 225-250 kW wind turbine and associated infrastructure on Land West of Little Lansenwith, Tretheague, Stithians, Cornwall providing power by a private cable to Stithians Water Treatment Works nearby.
It is expected that the turbine will produce around 700 000 - 800 000 kWh per annum accounting for approximately 40 % of the site's energy usage. This scheme will contribute towards SWW's aim to have 20 % of their energy coming from renewable energy sources by 2020.
Outline Specification — A three bladed wind turbine between 225-250 kW with a total height of 58 m or less and a rotor diameter of 35 m or less.
Annual Energy Production (AEP) of 700 000 or greater with an annual average wind speed on site of 7.62 m/s.
The site is not eligible for export so all power must be used on site.
These dimensions will enable the turbine to fit within our planning constraints. Due to ecological constraints on site any pre-commencement works need to be completed in Feb 2018
Interested organisations need to respond to groupprocurement@pennon-group.co.uk
By Noon FRIDAY 1.12.2017 expressing their interest in this business opportunity.
VI.4) Procedures for review
VI.4.1) Review body
South West Water
Exeter
UK
VI.5) Date of dispatch of this notice
14/11/2017