Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Award Notice

installation of Solar PV and EV charging at Price Fencing, Merthyr

  • First published: 09 November 2022
  • Last modified: 09 November 2022

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-kuma6s-123221
Published by:
H Factor
Authority ID:
AA80333
Publication date:
09 November 2022
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

Scope Design a Grid Tied 36.86 kWp Photovoltaic Array and EV Charging Stations for Price Fencing & Landscaping Limited, Maesgwynne Industrial Estate, Cefn Coed, Merthyr Tydfil, CF48 2SD. The PV Inverter and PV/EV Distribution Board to be located in storage room at rear of front reception area. PV System Design. The PV system will incorporate the following points within the design. • Inverter must have minimum 12-year warranty • Type 2 surge protection built into the inverter. • Tier 1 Monocrystalline Modules with a Module Efficiency greater than 20% • Modules to have a 12 Year Warranty for Materials and Processing. • Modules to have 25-year Power output Warranty (Power Output Tolerance - ≤2% Year 1 & ≤0.55% years 2 to 25) • Safe Touch voltage technology built into the design to reduce DC voltage at loss of inverter power. • Optimisation to mitigate all types of module mismatch-loss from manufacturing tolerance to partial shading. • Optimisation to ensure maximum generation of the PV modules at panel level, minimum one for two panels. • Inverters and optimisers be manufactured from the same company • Firefighter safety switch interconnected with the onsite fire alarm panel. Safety switch to reduce string voltage to below safe DC touch voltage on alarm. • Modbus meter with CT’s at intake position to monitor Import / Export via online monitoring system. • For ease of maintenance, module level monitoring is to be included with connection to internet • By isolating the AC supply the DC circuit must reduce below DC touch safe level • Inverter selection must have built in arc fault detection according to UL1699B • Arc fault detection must reduce DC current and DC voltage. • Trapezoidal Sheet mounting system. • G99 Application for connection. • MCS registration. EV Charge Points The Electric Vehicle Charge points will incorporate the following in the design. • 1 x Twin 7.4kW Type 2 Mode 3Charge Point. • 1 x Single 22kW Type 2 Mode 3 Charge Point. • Key activated charging. • Built in PEN Fault Detection (No Earth Rod Requirements) • Smart Charge Point Regulations 2021 Compliant. • OZEV approved. • Warranty – Minimum 3 years Electrical Infrastructure A new 3 phase distribution circuit to be installed tapping off the existing Bus Bar Chamber supplying a new 3 phase PV & EV Distribution Board installed within the Storage Room. The new submain cable will have a fused switched isolator at connection to Bus Bar for isolation. The new PV & EV Distribution Board will supply power to all new components. All distribution circuits to be supported with independent containment and bracketry. Access Access to be supplied via scaffold with edge protection to all areas of the roof where proposed PV array is to be installed. Scaffold to have all safety permits and certificates in place before access to work granted. A site visit to site is recommended to confirm design requirements prior to pricing.

Full notice text

CONTRACT AWARD NOTICE – NATIONAL

SUPPLIES

1 Authority Details

1.1

Authority Name and Address


H Factor

Technology, Penwaungoch, Pentwyn road,

Treharris

CF46 5BS

UK

Simon Conway

+44 7496843652

spfconway@gmail.com

2 Contract Details

2.1

Title

installation of Solar PV and EV charging at Price Fencing, Merthyr

2.2

Description of the contract

Scope

Design a Grid Tied 36.86 kWp Photovoltaic Array and EV Charging Stations for Price Fencing & Landscaping Limited, Maesgwynne Industrial Estate, Cefn Coed, Merthyr Tydfil, CF48 2SD. The PV Inverter and PV/EV Distribution Board to be located in storage room at rear of front reception area.

PV System Design.

The PV system will incorporate the following points within the design.

• Inverter must have minimum 12-year warranty

• Type 2 surge protection built into the inverter.

• Tier 1 Monocrystalline Modules with a Module Efficiency greater than 20%

• Modules to have a 12 Year Warranty for Materials and Processing.

• Modules to have 25-year Power output Warranty (Power Output Tolerance - ≤2% Year 1 & ≤0.55% years 2 to 25)

• Safe Touch voltage technology built into the design to reduce DC voltage at loss of inverter power.

• Optimisation to mitigate all types of module mismatch-loss from manufacturing tolerance to partial shading.

• Optimisation to ensure maximum generation of the PV modules at panel level, minimum one for two panels.

• Inverters and optimisers be manufactured from the same company

• Firefighter safety switch interconnected with the onsite fire alarm panel. Safety switch to reduce string voltage to below safe DC touch voltage on alarm.

• Modbus meter with CT’s at intake position to monitor Import / Export via online monitoring system.

• For ease of maintenance, module level monitoring is to be included with connection to internet

• By isolating the AC supply the DC circuit must reduce below DC touch safe level

• Inverter selection must have built in arc fault detection according to UL1699B

• Arc fault detection must reduce DC current and DC voltage.

• Trapezoidal Sheet mounting system.

• G99 Application for connection.

• MCS registration.

EV Charge Points

The Electric Vehicle Charge points will incorporate the following in the design.

• 1 x Twin 7.4kW Type 2 Mode 3Charge Point.

• 1 x Single 22kW Type 2 Mode 3 Charge Point.

• Key activated charging.

• Built in PEN Fault Detection (No Earth Rod Requirements)

• Smart Charge Point Regulations 2021 Compliant.

• OZEV approved.

• Warranty – Minimum 3 years

Electrical Infrastructure

A new 3 phase distribution circuit to be installed tapping off the existing Bus Bar Chamber supplying a new 3 phase PV & EV Distribution Board installed within the Storage Room. The new submain cable will have a fused switched isolator at connection to Bus Bar for isolation. The new PV & EV Distribution Board will supply power to all new components. All distribution circuits to be supported with independent containment and bracketry.

Access

Access to be supplied via scaffold with edge protection to all areas of the roof where proposed PV array is to be installed. Scaffold to have all safety permits and certificates in place before access to work granted.

A site visit to site is recommended to confirm design requirements prior to pricing.

2.3

Notice Coding and Classification

09331000 Solar panels
09331200 Solar photovoltaic modules
09332000 Solar installation
45261215 Solar panel roof-covering work
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)

2.4

Estimated Total Value

3 Procedure

3.1

Type of Procedure

Single stage

4 Award of Contract

4.1

Successful Bidders

4.1.1

Name and Address of successful supplier, contractor or service provider





Nuvolt Ltd

Unit 3, Links Court, Fortran Road,

Cardiff

CF30LT

UK




www.nuvolt.co.uk

5 Other Information

5.1

Reference number attributed to the notice by the contracting authority

SC1

5.2

Date of Contract Award

 03-10-2022

5.3

Number of tenders received

3

5.4

Other Information

(WA Ref:126431)

Relates to the following project/programme financed by EU Community Funds: AMMV Energy worx WEFO funded project

5.5

Additional Documentation

N/a

5.6

Publication date of this notice:

 09-11-2022

Coding

Commodity categories

ID Title Parent category
09332000 Solar installation Solar energy
45261215 Solar panel roof-covering work Erection and related works of roof frames and coverings
09331000 Solar panels Solar energy
09331200 Solar photovoltaic modules Solar panels

Delivery locations

ID Description
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

Document family

Notice details
Publication date:
18 July 2022
Deadline date:
01 August 2022 00:00
Notice type:
Contract Notice
Authority name:
H Factor
Publication date:
09 November 2022
Notice type:
Contract Award Notice
Authority name:
H Factor

About the buyer

Main contact:
spfconway@gmail.com
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.